FORD FLTM EU-BU 014-02-2000 FLOW CHARACTERISTICS OF WINDSHIELD AND BACKLIGHT PREFORMED BONDING TAPES《挡风玻璃和后窗玻璃用预成型胶带的流动特性》.pdf
《FORD FLTM EU-BU 014-02-2000 FLOW CHARACTERISTICS OF WINDSHIELD AND BACKLIGHT PREFORMED BONDING TAPES《挡风玻璃和后窗玻璃用预成型胶带的流动特性》.pdf》由会员分享,可在线阅读,更多相关《FORD FLTM EU-BU 014-02-2000 FLOW CHARACTERISTICS OF WINDSHIELD AND BACKLIGHT PREFORMED BONDING TAPES《挡风玻璃和后窗玻璃用预成型胶带的流动特性》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 FORD LABORATORY TEST METHOD EU-BU 014-02 Date Action Revisions 2000 11 13 Revised Editorial no technical change A. Cockman 1994 02 28 Printed copies are uncontrolled Page 1 of 4 Copyright 2000, Ford Global Technologies, Inc. FLOW CHARACTERISTICS OF WINDSHIELD AND BACKLIGHT PREFORMED BONDING TAPES A
2、pplication This procedure is used to determine the flow out behaviour of bonding tape. The height of tape and amount of flow is determined after the specified time, temperature a nd load. Apparatus and Materials Required Mechanical Convection Oven Capable of maintaining a constant temperature of 90
3、+/ - 1 C. Glass Plates Flat polished plate glass 75 x 75 x 6 mm. Bonding Tape Samples of tape 75 mm long with a cross section as s pecified on the relevant engineering drawing. Samples must have a uniform cross section over the entire 75 mm length. Weight 75 x 75 mm - 0.7 kg. Spacer Steel - 75 x 15
4、x 3 +/ - .05 mm. Required for maintaining the minimum height of the compressed test assembly. Thickness Gauge Capable of measuring thicknesses up to 25 mm within .02 mm. The gauge must be equipped to provide a 0.5 kg load over a contact area of approximately 10 cm. Stopwatch Hydraulic Press Capable
5、of compressing the bonding tape to the specified thickness. FORD LABORATORY TEST METHOD EU-BU 014-02 Page 2 of 4 Copyright 2000, Ford Global Technologies, Inc. Conditioning and Test Conditions Prior to testing, all specimens must be conditioned for a minimum of 24 hours at 20 +/ - 2 C. The test must
6、 also be performed at this temperature. Procedure Note: 3 assemblies are required for this test. 1. Using the thickness gauge, measure the combined height of two pieces of glass plate under a 0.5 kg load to the nearest .02 mm and mark the mating surfaces. 2. Prepare the test assembly as shown in the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDFLTMEUBU014022000FLOWCHARACTERISTICSOFWINDSHIELDANDBACKLIGHTPREFORMEDBONDINGTAPES 挡风玻璃 后窗 玻璃 成型 胶带

链接地址:http://www.mydoc123.com/p-747866.html