FORD ESB-M4G317-A-1990 SEALER REPAIR CHIP RESISTANT - SPRAYABLE TOPCOAT OVEN BAKE CYCLE《烘箱烘干面漆用可喷施、耐开裂的修复用密封剂》.pdf
《FORD ESB-M4G317-A-1990 SEALER REPAIR CHIP RESISTANT - SPRAYABLE TOPCOAT OVEN BAKE CYCLE《烘箱烘干面漆用可喷施、耐开裂的修复用密封剂》.pdf》由会员分享,可在线阅读,更多相关《FORD ESB-M4G317-A-1990 SEALER REPAIR CHIP RESISTANT - SPRAYABLE TOPCOAT OVEN BAKE CYCLE《烘箱烘干面漆用可喷施、耐开裂的修复用密封剂》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Action Changes1990 03 12 NB00E10039338000 Released E. Rezendes MPWP 3948-a Page 1 of 6 SEALER, REPAIR - CHIP RESISTANT - SPRAYABLE ESB-M4G317-ATOPCOAT OVEN BAKE CYCLE1. SCOPEThe material defined by this specification is a poly
2、vinylchloride-basedspr ayable repair coating for the ESB-M4G276 lower bodyside stone chipresistant coating. This coating can be cured by the ena mel oven bake cycleand p rovides a paintable corrosion resistant film which will withstandstone chipping.2. APPLICATIONThis specification was released orig
3、inally for a sprayable material, to beused to repair ESB-M4G276. It is a total panel repair material; it is notfor spot repair usage.3. REQUIREMENTSThe material shall meet all requirements detailed in thi s section. Approvedproduction material applied and tested under identical conditions shall beus
4、ed as the control. In the ev ent that both the sample under test and thecontrol material fail any requirements, that test shall be repeated. Thesere quirements apply to both laboratory-prepared and production batches ofthe coating.3.1 STATISTICAL PROCESSSupplie rs must conform to the requirements of
5、 Ford Quality SystemStand ard Q-101. A mutually acceptable Control Plan as describedtherein is required for material/source approval. Appropriatestatist ical tools must be used to analyze process/product data sothat variation in the final product is continuously reduced.3.2 INFRARED SPECTROPHOTOMETR
6、Y AND/OR THERMAL ANALYSISFord Motor Company, at its option, may conduct infrared and/ortherma l analysis of material/parts supplied to this specification.The IR spectra and thermograms established for i nitial approval shallconst itute the reference standard and shall be kept on file at thedesignate
7、d material laboratory. All samples sha ll produce IR spectraand thermograms that correspond to the reference standard when testedunder the same conditions.ENGINEERING MATERIAL SPECIFICATIONESB-M4G317-AWP 3948-b Page 2 of 6 3.3 CONDITIONING AND TEST CONDITIONSAll test values indicated herein are base
8、d on ma terial conditioned ina control led atmosphere of 23 +/- 2 C and 50 +/- 5 % relativehumidity for not less than 24 h prior to testing and tested under thesame conditions unless otherwise specified.3.4 SOLIDS, min 95 %(ASTM D 2834, except heat for 3 h at 102+/- 3 C in a mechanical convection ov
9、en)3.5 PHYSICAL PROPERTIES3.5.1 Weight Per Volume 1.42 +/- .03 kg/L(ASTM D 816)3.5.2 Viscosity(FLTM BV 103-01, 1.32 mm orifice,280 kPa air pressure)3.5.2.1 As Received 7 - 25 s3.5.2.2 Aged, max 50 s(72 h at 38 +/- 2 C)3.5.3 Cured Sealant Properties3.5.3.1 Tensile, min 1.9 MPa(ASTM D 412, Die C,300 m
10、m/minute)For sample preparation see para 3.5.3.4.3.5.3.2 Elongation at Tensile Break,Break, min 50 %3.5.3.3 Tear Strength, min 7 kN/m(ASTM D 624, Die C,500 mm/minute)For sample preparation see para 3.5.3.4.ENGINEERING MATERIAL SPECIFICATIONESB-M4G317-AWP 3948-b Page 3 of 6 3.5.3.4 Cured Sealant Samp
11、le Preparationand Aging RequirementsCure a sealant slab 1 50 x 150 x 0.38 +/- 0.5 mm ina mechanical convecti on oven for 10 minutes at 130+/- 2 C (metal temperature). Die cut samples fortensile, elongation and tear taking care to avoidserious air inclusion or thin areas in the controlsections. Test
12、the sealer after: (1) aging 72 hoursat 23 C and (2) aging 2 weeks at 70 +/- 1 C.3.6 PREPARATION OF TEST PANELSPrepar e test panels for paragraphs 3.7 and 3.8.2 as described below:. Electr ocoat: Ford PTQ cold rolled steel and ESB-M1A62 galvanizedsteel. Pre-treatment: ESB-M3P1 zinc phosphate. Electr
13、ocoat: ESB-M64J26 medium build cathodic electrocoat primer,20 - 23 micrometres followed by the specified bake cycle. Apply the 0.38 mm dry film thic kness of repair sealer and bake for17 minutes at 130 C oven conditions. After the panels cool to room t emperature, apply ESB-M33J100 whiteena mel, bla
14、ck enamel and ESB-M33J3 light blue metallic basecoat/clearcoat. Bake the panels for 17 minutes at 130 C oven conditions. Age panels 72 h room temperature or 16 h at 43 +/- 2 C oventemperature before initiating a test program.3.7 APPEARANCE3.7.1 SmoothnessThe repair sealer film shall level to a moder
15、ate degree oforange peel. The surface of th e material under test shall beequal to or better than current approved production materialfor smoothness when applied and baked under identicalconditions.ENGINEERING MATERIAL SPECIFICATIONESB-M4G317-AWP 3948-b Page 4 of 6 3.7.2 HoldoutThere shall be no evi
16、dence of dulling or strike-in when enamelcolor coat is applied over the repair sealer, and nodifference in gloss of the color coat. This evaluation shouldbe mad e on 3 panels: one painted with white enamel, anotherpainted with black enamel, and a third painted with ligh t bluebasecoat/clearcoat.3.7.
17、3 PaintabilityInitial AppearanceNo significant color shift, difference in orientation ofmeta llic flakes (metallic paints) or other objectionableappearance defects in the paint over the sealer. Evaluat e overlight blue metallic topcoat.3.7.4 WeatherabilityNo sta ining, discoloration or other deleter
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDESBM4G317A1990SEALERREPAIRCHIPRESISTANTSPRAYABLETOPCOATOVENBAKECYCLE 烘箱 干面 漆用可 喷施 开裂 修复 密封剂 PDF

链接地址:http://www.mydoc123.com/p-745611.html