FORD EL3-1993 PROGRAMMMABLE CONTROLLERS - REQUIREMENTS《可编程控制器的要求》.pdf
《FORD EL3-1993 PROGRAMMMABLE CONTROLLERS - REQUIREMENTS《可编程控制器的要求》.pdf》由会员分享,可在线阅读,更多相关《FORD EL3-1993 PROGRAMMMABLE CONTROLLERS - REQUIREMENTS《可编程控制器的要求》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、FORD MANUFACTURING STANDARDS EL3 DECEMBER 1993 PROGRAMMABLE CONTROLLERS - REQUIREMENTS EL3 Page 1 1. SCOPE: 1.1 This standard describes the requirements for programmable controllers (PCs) with greater than 64 inputs and outputs (I/O) and greater than 1000 words of memory intended for general use thr
2、oughout Ford Motor Company which will promote: (1) Safety to personnel. (2) Uninterrupted production. (3) Long life of equipment. (4) Ease and low cost of maintenance. 1.2 1.3 1.4 This standard includes and supplements the requirements of NEMA ICS 3-304, “Programmable Controllers“, and as applicable
3、, requirements in: . ANSI/IEEE C37.90.1, “Standard Surge Withstand Capability (SWC) Tests for Protective Relays and Relay Systems“ . ICS l-109.6, “Electrical Noise Tests“ (Showering Arc) . Ford Manufacturing Standard EL3X, “Programmable Controllers - Applications“ . Ford Manufacturing Standard ELX,
4、“Electronic Standards for Mass Production Equipment and General Purpose Machine Tools“ . Ford Manufacturing Standard EXl, “Electrical Standards for Mass Production Equipment“ Use of the word “shall“ herein is understood as a requirement; the word “should“ as a recommendation. Deviations from this St
5、andard shall have the approval of the requisitioning activity in writing. Any waivers granted shall apply only to the order in question and shall not be considered as permanent. 2. GENERAL: 2.1 The PC shall operate in compliance with this standard over a supply voltage range of 85% to 110% of the no
6、minal 120 VAC supply at 50/60 Hz, +/- 5%. 2.2 Current or voltage transients or electromagnetic effects SHALL NOT cause spurious operation or affect the normal operation of the PC. The PC shall meet or exceed the requirements of ANSI/IEEE C37.90.1 surge withstand capability and NEMA ICS l-109.6 showe
7、ring arc tests. Protection circuitry shall fail to a safe condition. FORD MANUFACTURING STANDARDS EL3 DECEMBER 1993 PROGRAMMABLE CONTROLLERS - REQUIREMENTS EL3 Page 2 I 2.3 2.4 2.5 2.6 2.7 3. 3.1 3.2 PC Functions. The PC shall operate properly in a temperature range of 0 to 60 C (32 to 140 F) measur
8、ed inside the NEMA 12 enclosure in which the PC system will be mounted. It shall be capable of operating continuously at 60 C without additional ventilation or active cooling systems. The PC shall operate properly in a humidity range of 5% to 95% (non-condensing) per NEMA/ICS 3-304.06.01(b). Fastene
9、rs used in maintenance operations shall be of captive designs. Plug-in modules shall be mechanically secured or locked in place. The assembled system shall be designed to withstand vibration testing of 5-10Hz at 0.2 inch displacement (peak to peak) and lo-200Hz at 1 g and endurance testing (sweep te
10、st) of lo-200Hz for ninety minutes per axis and a dwell at resonance frequencies (10 minutes per resonance) per ML Standard 810C and IEC 68-2-6. Where the PC uses similar modules with unlike functions, the modules shall be mechanically keyed to prohibit insertion in incorrect positions or electrical
11、ly interlocked to prevent operation in an incorrect position. CENTRAL PROCESSING UNIT (CPU): In the event of a power failure, the CPU shall be capable of retaining the status or accumulated values in its memory associated with arithmetic operations, data files, latching states and timing functions.
12、Where batteries are used for memory retention, see 3.8. 3.2.1 The CPU shall offer a minimum function menu consisting of ladder programming including: a) Basic Relay b) “Latching“ or “Retentive“ Relay c) Retentive Timing d) Non-retentive Timing e) Incremental Counting 3.2.2 The basic instruction set
13、should be capable of providing number comparisons, four (4) digit arithmetic operations, decremental counting, shift registers, block operations, intelligent inputs and outputs (I/O) such as thermocouple and ASCII, immediate I/O, PID, subroutine, skip and real time clock. FORD MANUFACTURING STANDARD
14、S EL3 DECEMBER 1993 PROGRAMMABLE CONTROLLERS - REQUIREMENTS EL3 Page 3 3.2.3 The PC should be capable of communication with peer level PCs and host or master PCs, or computers via an RS-232-C interface port or similar data port. These data ports shall be separate from any required by a local hand-he
15、ld or built-in data access panel or the programming devices. 3.2.4 3.2.5 3.2.6 3.3 3.4 3.5 3.6 3.7 3.8 BATTERIES: 3.8.1 Where a battery is required to retain the PC memory, an internal contact or output, operating as part of the CPU and an indicating light, shall be available to indicate that the me
16、mory support battery is low. 3.8.2 The logic line shall accept a minimum of seven (7) elements in series and a minimum of four (4) in parallel. Program saving to a remote device shall default to include the entire control program memory. Programming instructions for the smallest controllers should b
17、e a subset of the largest for full upward compatibility. The PC shall not increment/decrement counters nor otherwise cause false movement or change in retained data when the power is turned on or off. The PC manufacturer shall be responsible for providing adequate Self-Diagnostic routines to insure
18、the safe and reliable operation of the entire system (PC and I/O). Upon fault detection, output devices shall be capable of being selected to be de-energized or held in last state (necessary in PID or analog control). Status indicating lights on the CPU shall verify normal operation. Typical indicat
19、ions are: AC and DC power, processor cycling, parity error, memory fault, memory support battery low, processor fault, power supply fault, transient suppressor circuitry fault and I/O fault. Error Detection and Fault Isolation (EDFI) shall be integral and shall localize faults to the lowest modular
20、(plug-in) level. Local fault annunciation via lights, and program accessible status bits shall be available. Where a battery is required to retain PC memory, it shall be replaceable without loss of memory (with power on). The battery shall be a readily available, long life (90 day minimum) type. FOR
21、D MANUFACTURING STANDARDS =- EL3 PROGRAMMABLE CONTROLLERS - REQUIREMENTS DECEMBER 1993 = EL3 Page 4 3.8.3 The low battery indicator should function a minimum of 14 days prior to final battery failure. 3.9 A selector switch shall be furnished to allow programming or editing only in the program or pro
22、gram/run position. The selector switch shall be of the key lock type with the key removable in any position. Two keys shall be furnished. 3.10 Removal of any processor module shall shut down the PC system. 4. PROGRAMMING AND DATA ACCESS: 4.1 Programming devices shall provide indication of the logic
23、state of each element comprising a rung or network of logic. 4.2 MAIN PROGRAMMING DEVICE: 4.2.1 The main programming device shall display all elements, including pre-set and accumulated values, comprising a rung or network of logic simultaneously and should provide capability of displaying system gr
24、aphics, The main programming device shall lend itself to be utilized as a universal programmer and be up and down compatible with vendors entire line of PCs and lock out non-supported features. It should be directly i compatible with a standard off the shelf IBM PC. 4.2.2 The main programming device
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDEL31993PROGRAMMMABLECONTROLLERSREQUIREMENTS 可编程控制器 要求 PDF

链接地址:http://www.mydoc123.com/p-744811.html