FORD BAX-1977 PAINT SPRAY BOOTHS - WATER WASH TUNNEL TYPE《水洗隧道式喷漆室》.pdf
《FORD BAX-1977 PAINT SPRAY BOOTHS - WATER WASH TUNNEL TYPE《水洗隧道式喷漆室》.pdf》由会员分享,可在线阅读,更多相关《FORD BAX-1977 PAINT SPRAY BOOTHS - WATER WASH TUNNEL TYPE《水洗隧道式喷漆室》.pdf(23页珍藏版)》请在麦多课文档分享上搜索。
1、B Manufacturing Standard8 Ford Motor Company 1.1 - 1.2 - 1.3 1.7.1 1.7.2 1.3.3 1.4 - i.5 Vater YMh tunnel typa psint upmy booths ahrll be used in tho appiicntion of 6prq operationi except when uuch operationa are of an intermittent touch- ip sature, or -re production volume is not sufficient to uarr
2、nat the water waih booth; thersfora, n volutes iad/or baffles, 10 gaw; housing, i6 gauge or stainless ateel equivalent M .apecifie by issuing activity. 3. VESTIBULE CONSTEIIJCTION Vestibules ohdl be fabricated of i6 U.S. or English gauge (mini) black iron thet umtal panels, wing standard seam constn
3、iction bolted together air tight. AU joints ahall be sealed at assembly and dl inside seams of completed utrueturo ahdi be caulked vith a material that is ispervious to normallp used booth cle- conipouads and procedures such ao steam cleaning. Clear, Vire glass, eeded wiadovs be pravided in the uall
4、s of the vestibule at the option of the iaauing Company actity. 3.2 Structurai steel framing a)ull be furnidmi on io foot centers (mtdmum) to mke the vestibule entirely 0ol.f-supporting uith the inside surface smooth d irnobst-tede rtructural steel framing nhrll be designed to withatand the addition
5、al lin and dead weight of conveyor arui uork loa. For vestibules through which monorail conveprs pasa, u Vestibules located at entrance end of boothe shaa be furnished uith work phtfonns constructed of 3/16 inch smooth plate or floor grating and water flood sheet M specified by issuing activity. ful
6、l width and length of vestibule and be the same height ao the floor of ta boath propor. vestibule WitB one on each aids of work conveyor. ea-uipped uith automatic closers and panic latches. clear wira glass viadova and meet OSBP standards ae applicable. Platforms SU be the 3.4 Two (2) gaskettd 90 Sv
7、ing type acces doorc shall b8 provided for each 90 doors shall be Doors shall have u Idhers work platforms are required, both necessary steps and a 3 foot square landing shall be provided for doors. Steps and Ming shall be fabricated of 3/16 inch checker plate and be aauipped with guard rails and mi
8、d rail on one side, constructed to manufacturing standard IEZ 3-i. Silhouetted openings shall be provided in end. of vestibules, all- approximatelp no fan inlet borss shall be utilized. together with gasket8 between flanges to facilitate fan removal. Vater vaah metion exhaust plenum8 shall be connec
9、ted Fan and Wet duet work shall be companion angle bolted BK PeG6 6 PAINT SPRAY BOOTES DESIGN h-er, delector types are not scceptable. Exhaut stack diameteri rhitl be sized so as to produce an exhaust gas exit velocity of 2joO feet per ininUte at etack gas canditiona, with 3600 feet per minute prefe
10、rred uhere air quality problema elciat. 6.1.1 - 6.1.2 - 6.14 Each air supply oyutom rhlll be prwided with safety dervices, automatic teniperature controls and combwtian controls in coniormnnue uith Ford hnufacturing Staadani E5X-2. Spray booth fresh air supply enclosures shall be located on the buil
11、ding roof directly over may booth if building conditiona pemit. the enclosura may be located within the ldldhg. Alternativeiy, TBS following equipmeat which comprises the Standard push thni air supply mhdl be amangod kr tho sequence indicated. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10 . u. 12. 13 . Ample cleara
12、nce sU be provided betveea 9.1.5 Perfarmance curves shaU be fanmieha fa dl fans. 9.2.1 Each uanh section for booths with a relf-caned -ter ay8tea aball be equippd with a mrtical chair mtmt pump povared by a Irtsndard horitontal motor rsrticaUy ooirnted. Fumy ahrii be rs Section If, Hydraulic; action
13、 N, Pheumatic and Section L, Lubrication; and NFPA standard rpI0 mide 500 m applicable. The nales and regulations of the locd utility,SA or other inspecting authority ao applicable. Manufacturing Staff enY*ULL PpIaIT SPUY mu.ms Bu DESIGII d -CE DATA PAGE 13 J* 1977 - U.2 hch item of equfpaent shall
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDBAX1977PAINTSPRAYBOOTHSWATERWASHTUNNELTYPE 水洗 隧道 喷漆 PDF

链接地址:http://www.mydoc123.com/p-744745.html