FAA 14 CFR PART 417-2011 LAUNCH SAFETY《起飞安全》.pdf
《FAA 14 CFR PART 417-2011 LAUNCH SAFETY《起飞安全》.pdf》由会员分享,可在线阅读,更多相关《FAA 14 CFR PART 417-2011 LAUNCH SAFETY《起飞安全》.pdf(256页珍藏版)》请在麦多课文档分享上搜索。
1、541 Commercial Space Transportation, FAA, DOT Pt. 417 APPENDIX B OF PART 415SAFETY REVIEW DOCUMENT OUTLINE This appendix contains the format and numbering scheme for a safety review docu-ment to be filed as part of an application for a launch license as required by subpart F of part 415. The applica
2、ble sections of parts 413, 415, and 417 of this chapter are referenced in the outline below. SAFETY REVIEW DOCUMENT 1.0 Launch Description (415.109) 1.1 Launch Site Description 1.2 Launch Vehicle Description 1.3 Payload Description 1.4 Trajectory 1.5 Staging Events 1.6 Vehicle Performance Graphs 2.0
3、 Launch Operator Organization (415.111) 2.1 Launch Operator Organization (415.111 and 417.103 of this chapter) 2.1.1 Organization Summary 2.1.3 Organization Charts 2.1.4 Office Descriptions and Safety Func-tions 3.0 Launch Personnel Certification Program (415.113 and 417.105 of this chapter) 3.1 Pro
4、gram Summary 3.2 Program Implementation Document(s) 3.3 Table of Safety Critical Tasks Per-formed by Certified Personnel 4.0 Flight Safety (415.115) 4.1 Initial Flight Safety Analysis 4.1.1 Flight Safety Sub-Analyses, Methods, and Assumptions 4.1.2 Sample Calculation and Products 4.1.3 Launch Specif
5、ic Updates and Final Flight Safety Analysis Data 4.2 Radionuclide Data (where applicable) 4.3 Flight Safety Plan 4.3.1 Flight Safety Personnel 4.3.2 Flight Safety Rules 4.3.3 Flight Safety System Summary and Preflight Tests 4.3.4 Trajectory and Debris Dispersion Data 4.3.5 Flight Hazard Areas and Sa
6、fety Clear Zones 4.3.6 Support Systems and Services 4.3.7 Flight Safety Operations 4.3.8 Unguided Suborbital Launch Vehicles (where applicable) 5.0 Ground Safety (415.117) 5.1 Ground Safety Analysis Report 5.2 Ground Safety Plan 6.0 Launch Plans (415.119 and 417.111 of this chapter) 6.1 Launch Suppo
7、rt Equipment and Instru-mentation Plan 6.2 Configuration Management and Control Plan 6.3 Frequency Management Plan 6.4 Flight Termination System Electronic Piece Parts Program Plan 6.5 Accident Investigation Plan 6.6 Local Agreements and Public Coordina-tion Plan 6.7 Hazard Area Surveillance and Cle
8、arance Plan 6.8 Communications Plan 7.0 Launch Schedule (415.121) 7.1 Launch Processing Schedule 8.0 Computing Systems and Software (415.123) 8.1 Hardware and Software Descriptions 8.2 Flow Charts and Diagrams 8.3 Logic Diagrams and Software Design Descriptions 8.4 Operator User Manuals and Document
9、a-tion 8.5 Software Hazard Analyses 8.6 Software Test Plans, Test Procedures, and Test Results 8.7 Software Development Plan 9.0 Unique Safety Policies, Requirements and Practices (415.125) 10.0 Flight Safety System Design and Oper-ation Data (415.127) 10.1 Flight Safety System Description 10.2 Flig
10、ht Safety System Diagram 10.3 Flight Safety System Subsystem De-sign Information 10.4 Flight Safety System Analyses 10.5 Flight Termination System Environ-mental Design 10.6 Flight Safety System Compliance Ma-trix 10.7 Flight Termination System Installa-tion Procedures 10.8 Tracking System Validatio
11、n Proce-dures 11.0 Flight Safety System Test Data (415.129) 11.1 Testing Compliance Matrix 11.2 Test Program Overview and Schedule 11.3 Flight Safety System Test Plans and Procedures 11.4 Test Reports 11.5 Reuse of Flight Termination System Components 12.0 Flight Safety System Crew Data (415.131) 12
12、.1 Position Descriptions 12.2 Certification and Training Program De-scription 13.0 Safety at End of Launch (415.133) Docket No. FAA20007953, 71 FR 50536, Aug. 25, 2006 PART 417LAUNCH SAFETY Subpart AGeneral and License Terms and Conditions Sec. 417.1 General information. 417.3 Definitions and acrony
13、ms. 417.5 Reserved 417.7 Public safety responsibility. 417.9 Launch site responsibility. 417.11 Continuing accuracy of license appli-cation; application for modification of li-cense. VerDate Mar2010 13:23 Feb 23, 2011 Jkt 223046 PO 00000 Frm 00551 Fmt 8010 Sfmt 8010 Y:SGML223046.XXX 223046WReier-Avi
14、les on DSKGBLS3C1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-542 14 CFR Ch. III (1111 Edition) 417.1 417.13 Agreement with Federal launch range. 417.15 Records. 417.17 Launch reporting requirements and launch specific updates. 417.19
15、 Registration of space objects. 417.21 Financial responsibility require-ments. 417.23 Compliance monitoring. 417.25 Post launch report. 417.26417.100 Reserved Subpart BLaunch Safety Responsibilities 417.101 Scope. 417.103 Safety organization. 417.105 Launch personnel qualifications and certification
16、. 417.107 Flight safety. 417.109 Ground safety. 417.111 Launch plans. 417.113 Launch safety rules. 417.115 Tests. 417.117 Reviews. 417.119 Rehearsals. 417.121 Safety critical preflight operations. 417.123 Computing systems and software. 417.125 Launch of an unguided suborbital launch vehicle. 417.12
17、7 Unique safety policies, require-ments, and practices. 417.129 Safety at end of launch. 417.130417.200 Reserved Subpart CFlight Safety Analysis 417.201 Scope and applicability. 417.203 Compliance 417.205 General. 417.207 Trajectory analysis. 417.209 Malfunction turn analysis. 417.211 Debris analysi
18、s. 417.213 Flight safety limits analysis. 417.215 Straight-up time analysis. 417.217 Overflight gate analysis. 417.218 Hold-and-resume gate analysis. 417.219 Data loss flight time and planned safe flight state analyses. 417.221 Time delay analysis. 417.223 Flight hazard area analysis. 417.224 Probab
19、ility of failure analysis. 417.225 Debris risk analysis. 417.227 Toxic release hazard analysis. 417.229 Far-field overpressure blast effects analysis. 417.231 Collision avoidance analysis. 417.233 Analysis for an unguided suborbital launch vehicle flown with a wind weighting safety system. Subpart D
20、Flight Safety System 417.301 General. 417.303 Command control system require-ments. 417.305 Command control system testing. 417.307 Support systems. 417.309 Flight safety system analysis. 417.311 Flight safety system crew roles and qualifications. Subpart EGround Safety 417.401 Scope. 417.402 Compli
21、ance. 417.403 General. 417.405 Ground safety analysis. 417.407 Hazard control implementation. 417.409 System hazard controls. 417.411 Safety clear zones for hazardous op-erations. 417.413 Hazard areas. 417.415 Post-launch and post-flight-attempt hazard controls. 417.417 Propellants and explosives. A
22、PPENDIX A TO PART 417FLIGHT SAFETY ANALYSIS METHODOLOGIES AND PRODUCTS FOR A LAUNCH VEHICLE FLOWN WITH A FLIGHT SAFETY SYSTEM APPENDIX B TO PART 417FLIGHT HAZARD AREA ANALYSIS FOR AIRCRAFT AND SHIP PROTECTION APPENDIX C TO PART 417FLIGHT SAFETY ANALYSIS METHODOLOGIES AND PRODUCTS FOR AN UNGUIDED SUB
23、ORBITAL LAUNCH VEHICLE FLOWN WITH A WIND WEIGHTING SAFETY SYSTEM APPENDIX D TO PART 417FLIGHT TERMI-NATION SYSTEMS, COMPONENTS, INSTALLA-TION, AND MONITORING APPENDIX E TO PART 417FLIGHT TERMI-NATION SYSTEM TESTING AND ANALYSIS APPENDIX F TO PART 417 RESERVED APPENDIX G TO PART 417NATURAL AND TRIG-G
24、ERED LIGHTNING FLIGHT COMMIT CRI-TERIA APPENDIX H TO PART 417 RESERVED APPENDIX I TO PART 417METHODOLOGIES FOR TOXIC RELEASE HAZARD ANALYSIS AND OPERATIONAL PROCEDURES APPENDIX J TO PART 417GROUND SAFETY ANALYSIS REPORT AUTHORITY: 49 U.S.C. 7010170121. SOURCE: Docket No. FAA20007953, 71 FR 50537, Au
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FAA14CFRPART4172011LAUNCHSAFETY 起飞 安全 PDF
