FAA 14 CFR PART 153-2011 Airport operations《机场运作》.pdf
《FAA 14 CFR PART 153-2011 Airport operations《机场运作》.pdf》由会员分享,可在线阅读,更多相关《FAA 14 CFR PART 153-2011 Airport operations《机场运作》.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、702 14 CFR Ch. I (1111 Edition) Pt. 153 facilities for air traffic control activities, or weather reporting activities and communica-tion activities related to air traffic control, such areas of land or water, or estate there-in, or rights in buildings of the Sponsor as the FAA may consider necessar
2、y or desirable for construction at Federal expense of space or facilities for such purposes. The approxi-mate amounts of areas and the nature of the property interests and/or rights so required will be set forth in the Grant Agreement re-lating to the project. Such areas or any por-tion thereof will
3、 be made available as pro-vided herein within 4 months after receipt of written requests from the FAA. 28. Fee and rental structure. The airport op-erator or owner will maintain a fee and rent-al structure for the facilities and services being provided the airport users which will make the Airport a
4、s self-sustaining as pos-sible under the circumstances existing at the Airport, taking into account such factors as the volume of traffic and economy of collec-tion. 29. Reports to FAA. The Sponsor will fur-nish the FAA with such annual or special airport financial and operational reports as may be
5、reasonably requested. Such reports may be submitted on forms furnished by the FAA, or may be submitted in such manner as the Sponsor elects so long as the essential data are furnished. The Airport and all air-port records and documents affecting the Airport, including deeds, leases, operation and us
6、e agreements, regulations, and other instruments, will be made available of in-spection and audit by the Secretary and the Comptroller General of the United States, or their duly authorized representatives, upon reasonable request. The Sponsor will furnish to the FAA or to the General Accounting Of-
7、fice, upon request, a true copy of any such document. 30. System of accounting. All project ac-counts and records will be kept in accord-ance with a standard system of accounting if so prescribed by the Secretary. 31. Interfering right. If at any time it is de-termined by the FAA that there is any o
8、ut-standing right or claim of right in or to the Airport property, other than those set forth in Part II of the Application for Federal As-sistance, the existence of which creates an undue risk of interference with the operation of the Airport or the performance of the cov-enants of this part, the s
9、ponsor will acquire, extinguish, or modify such right or claim of right in a manner acceptable to the FAA. 32. Performance obligation. The Sponsor will not enter into any transaction which would operate to deprive it of any of the rights and powers necessary to perform any or all of the covenants ma
10、de herein, unless by such trans-action the obligation to perform all such covenants is assumed by another public agency found by the FAA to be eligible under the Act and Regulations to assume such obli-gations and having the power, authority, and financial resources to carry out all such obli-gation
11、s. If an arrangement is made for man-agement or operation of the Airport by any agency or person other than the Sponsor or an employee of the Sponsor, the Sponsor will reserve sufficient rights and authority to in-sure that the Airport will be operated and maintained in accordance with the Act, the
12、Regulations, and these covenants. 33. Meaning of terms. Unless the context otherwise requires, all terms used in these covenants which are defined in the Act and the Regulations shall have the meanings as-signed to them therein. B. Airport Layout Plan Approval. A sponsor seeking FAA approval of a ne
13、w or revised airport layout plan shall submit with the plan an environmental assessment prepared in conformance with Appendix 6 of FAA Order 1050.1C, Policies and Procedures for Considering Environmental Impacts (45 FR 2244; January 10, 1980) and FAA Order 5050.4 Airport Environmental Handbook (45 F
14、R 56622; August 25, 1980), if an assessment is re-quired by Order 5050.4. III. Airport Planning Each applicant for an airport planning grant shall submit the assurances numbered 1 (except for the phrase and to finance and construct the proposed facilities), 7, 9, 11 (except for the last sentence), a
15、nd 12, 14, 15, 30, and 33 of Part II of this appendix. (Airport and Airway Development Act of 1970, as amended (49 U.S.C. 1701 et seq.); sec. 1.47(f)(1) Regulations of the Office of the Sec-retary of Transportation (49 CFR 1.47(f) (1) Doc. No. 19430, 45 FR 34797, May 22, 1980, as amended by Amdt. 15
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FAA14CFRPART1532011AIRPORTOPERATIONS 机场 运作 PDF

链接地址:http://www.mydoc123.com/p-744448.html