ETSI TS 101 804-2-2004 Methods for Testing and Specification (MTS) Conformance Test Specification for ITU-T H 225 0 (Terminal Gatekeeper and Gateway) Part 2 Test Suite Structure an.pdf
《ETSI TS 101 804-2-2004 Methods for Testing and Specification (MTS) Conformance Test Specification for ITU-T H 225 0 (Terminal Gatekeeper and Gateway) Part 2 Test Suite Structure an.pdf》由会员分享,可在线阅读,更多相关《ETSI TS 101 804-2-2004 Methods for Testing and Specification (MTS) Conformance Test Specification for ITU-T H 225 0 (Terminal Gatekeeper and Gateway) Part 2 Test Suite Structure an.pdf(57页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TS 101 804-2 V2.1.1 (2004-11)Technical Specification Methods for Testing and Specification (MTS);Conformance Test Specification for ITU-T H.225.0(Terminal, Gatekeeper and Gateway);Part 2: Test Suite Structure and Test Purposes (TSS Essential, or potentially Essential, IPRs notified to ETSI in
2、respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/webapp.etsi.org/IPR/home.asp). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to
3、 the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Methods for Testing and Specificatio
4、n (MTS). The present document is part 2 of a multi-part deliverable covering the H.225.0 protocol for Terminal, Gatekeeper and Gateway as identified below: Part 1: “Protocol Implementation Conformance Statement (PICS) proforma“; Part 2: “Test Suite Structure and Test Purposes (TSS Part 3: “Abstract
5、Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma“. ETSI ETSI TS 101 804-2 V2.1.1 (2004-11) 6 1 Scope The present document specifies the Test Suite Structure and Test Purposes (TSS Conformance Test Specification for ITU-T H.225.0 (Terminal, Gatekeepe
6、r and Gateway); Part 1: Protocol Implementation Conformance Statement (PICS) proforma“. 2 ITU-T Recommendation H.323: “Packet-based multimedia communications systems“. 3 ITU-T Recommendation H.225.0 (2000): “Call signalling protocols and media stream packetization for packet-based multimedia communi
7、cation systems“. 4 ITU-T Recommendation Q.931: “ISDN user-network interface layer 3 specification for basic call control“. 5 ISO/IEC 9646-1: “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 1: General concepts“. 6 ISO/IEC 9646-2: “Informat
8、ion technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 2: Abstract Test Suite specification“. 7 ISO/IEC 9646-3: “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 3: The Tree and Tabular Combined
9、 Notation (TTCN)“. 3 Definitions and abbreviations 3.1 Definitions For the purposes of the present document, the terms and definitions given in ITU-T Recommendation H.323 2, ITU-T Recommendation H.225.0 3, ISO/IEC 9646-1 5, ISO/IEC 9646-2 6, ISO/IEC 9646-3 7 and the following apply: Basic Call Contr
10、ol (BCC): signalling protocol associated with the DSS1 - ISDN Basic Call control procedures of ITU-T Recommendation Q.931 4 ETSI ETSI TS 101 804-2 V2.1.1 (2004-11) 7 inopportune: test purpose covering a signalling procedure where an inopportune message (type of message not expected in the IUT curren
11、t state) is sent to the IUT syntactically invalid: test purpose covering a signalling procedure where a valid (expected in the current status of the IUT) but not correctly encoded (unknown or incorrect parameter values) message is sent to the IUT, which shall react correctly and eventually reject th
12、e message test purpose: non-formal test description, mainly using text NOTE: This test description can be used as the basis for a formal test specification (e.g. Abstract Test Suite in TTCN). See ISO/IEC 9646-2 6. valid: test purpose covering a signalling procedure where all the messages sent to or
13、received from the IUT are valid (expected in the current status of the IUT) and correctly encoded 3.2 Abbreviations For the purposes of the present document, the following abbreviations apply: ACF Admission ConFirm ADM ADMission APDU Application Protocol Data Unit ARJ Admission ReJect ARQ Admission
14、ReQuest ATS Abstract Test Suite BCC Basic Call Control BCF Bandwidth ConFirm BND Bandwidth BRJ Bandwidth ReJect BRQ Bandwidth ReQuestDCF Disengage ConFirm DGK Destination GateKeeper DIS DISengage DRJ Disengage ReJect DRQ Disengage ReQuest DRQ Disengage Request GCF Gatekeeper ConFirm GDR Gatekeeper D
15、iscovery Request GK GateKeeper GRJ Gatekeeper ReJect GRQ Gatekeeper ReQuest GW GateWay I InopportuneIUT Implementation Under Test LAN Local Area Network LCF Location ConFirmLOC LOCation LRJ Location ReJect LRQ Location ReQuest MCU Multipoint Control Unit MSI Manufacturer Specific Information PDU Pro
16、tocol Data Unit PER Packed Encoding Rules PHA PHase A: call setup signalling procedures PHE PHase E: call termination signalling procedures PICS Protocol Implementation Conformance Statement PIXIT Protocol Implementation eXtra Information for Testing RAS Registration, Admission and Status RCF Regist
17、er ConFirm REG REGistration RIP Request In Progress RRJ Register ReJect ETSI ETSI TS 101 804-2 V2.1.1 (2004-11) 8 RRQ Register ReQuest S Syntactically invalid STA STAtus TCP Transmission Control Protocol TE TErminalTP Test Purpose TSS Test Suite Structure TTCN Testing and Test Control Notation U0 Nu
18、ll call state U1 Call Initiated call state U10 Active call state U2 Overlap Sending call state U3 Outgoing Call Proceeding call state U4 Call Delivered call state U7 Call Received call state U9 Incoming Call Proceeding call state UCF Unregistration ConFirm UDP User Datagram Protocol URG UnReGistrati
19、on URJ Unregistration ReJect URQ Unregistration ReQuest 4 Architecture and Test Suite Structure (TSS) 4.1 Architecture The items to be tested can be one of the following: Terminal, Gatekeeper, Gateway or Destination Gatekeeper. They are a part of a Packet Based Network using a LAN with TCP/IP (see f
20、igure 1). Terminal Gatekeeper Gateway Destination Gatekeeper LAN TCP/IP Figure 1: Network architecture ETSI ETSI TS 101 804-2 V2.1.1 (2004-11) 9 The Implementation Under Test (IUT, see ISO/IEC 9646-1 5) for which this Test purpose specification applies consists of the H.225.0 terminal to gatekeeper
21、signalling (RAS) and the H.225.0 call signalling (BCC) (see figure 2). IUT H.225.0 Terminal to Gatekeeper signalling RAS H.225.0 call signalling BCC UDP TCP IP (LAN) Figure 2: Protocol architecture 4.2 Test Suite Structure (TSS) The Test Suite Structure follows the network architecture and the proto
22、col architecture. The first level is divided into 2 groups according to the protocol: RAS and BCC. The second level describes the IUT, for RAS either endpoint or gatekeeper, for BCC either endpoint (terminal or gateway), gatekeeper or destination gatekeeper. For the RAS protocol, each process is inc
23、luded in a corresponding sub-group: Gatekeeper Discovery Request (GDR), Registration (REG), Admission (ADM), LOC (Location), BND (Bandwidth), URG (Unregistration), DIS (Disengage), STA (Status) and Request in Progress (RIP). For BCC, 2 call phases are considered: phase A and phase E, each one formin
24、g a sub-group of BCC. Inopportune behaviour and syntactically invalid messages are tested in the sections I and S which are sub-divided according to the call states. Protocol IUT type Process/Phase/ Test type Call state RAS Endpoint (TE) GDR REG ADM LOCBND URG DIS STA RIP Gatekeeper (GK) GDR REG ADM
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITS10180422004METHODSFORTESTINGANDSPECIFICATIONMTSCONFORMANCETESTSPECIFICATIONFORITUTH2250TERMINALGATEKEEPERANDGATEWAYPART2TESTSUITESTRUCTUREANPDF

链接地址:http://www.mydoc123.com/p-738311.html