ETSI GS NFV-IFA 013-2017 Network Functions Virtualisation (NFV) Release 2 Management and Orchestration Os-Ma-Nfvo reference point - Interface and Information Model Specification (V.pdf
《ETSI GS NFV-IFA 013-2017 Network Functions Virtualisation (NFV) Release 2 Management and Orchestration Os-Ma-Nfvo reference point - Interface and Information Model Specification (V.pdf》由会员分享,可在线阅读,更多相关《ETSI GS NFV-IFA 013-2017 Network Functions Virtualisation (NFV) Release 2 Management and Orchestration Os-Ma-Nfvo reference point - Interface and Information Model Specification (V.pdf(130页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI GS NFV-IFA 013 V2.3.1 (2017-08) Network Functions Virtualisation (NFV) Release 2; Management and Orchestration; Os-Ma-Nfvo reference point - Interface and Information Model Specification Disclaimer The present document has been produced and approved by the Network Functions Virtualisation (NFV
2、) ETSI Industry Specification Group (ISG) and represents the views of those members who participated in this ISG. It does not necessarily represent the views of the entire ETSI membership. GROUP SPECIFICATION ETSI ETSI GS NFV-IFA 013 V2.3.1 (2017-08) 2 Reference RGS/NFV-IFA013ed231 Keywords interfac
3、e, management, MANO, NFV, orchestration, virtualisation ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Importan
4、t notice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written aut
5、horization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document shoul
6、d be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the present document, please send your comment to one of the foll
7、owing services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF
8、version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. ETSI 2017. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GP
9、PTM and LTE are trademarks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo is protected for the benefit of its Members. GSM and the GSM logo are trademarks registered and owned by the GSM Association. ETSI ETSI GS NFV-IFA 013 V2.3.1 (2017-08) 3
10、Contents Intellectual Property Rights 13g3Foreword . 13g3Modal verbs terminology 13g31 Scope 14g32 References 14g32.1 Normative references . 14g32.2 Informative references 14g33 Definitions and abbreviations . 15g33.1 Definitions 15g33.2 Abbreviations . 15g34 Overview of interfaces and information e
11、lements associated to the Os-Ma-nfvo reference point . 15g34.1 Introduction 15g34.2 Relation to other NFV group specifications . 16g34.3 Conventions 16g35 Reference point and interface requirements . 17g35.1 Introduction 17g35.2 Os-Ma-nfvo reference point requirements 17g35.3 Interface requirements
12、17g35.3.1 NSD Management interface requirements 17g35.3.2 NS Lifecycle Management interface requirements . 18g35.3.3 Void 20g35.3.4 NS Performance Management interface requirements 20g35.3.5 NS Fault Management interface requirements 21g35.3.6 VNF Package Management interface requirements 21g36 OSS
13、exposed interfaces 22g37 NFVO exposed interfaces 22g37.1 Introduction 22g37.2 NSD Management interface . 22g37.2.1 Description 22g37.2.2 On-board NSD operation 23g37.2.2.1 Description 23g37.2.2.2 Input parameters 23g37.2.2.3 Output parameters . 23g37.2.2.4 Operation results . 23g37.2.3 Enable NSD op
14、eration 24g37.2.3.1 Description 24g37.2.3.2 Input parameters 24g37.2.3.3 Output parameters . 24g37.2.3.4 Operation results . 24g37.2.4 Disable NSD operation . 24g37.2.4.1 Description 24g37.2.4.2 Input parameters 25g37.2.4.3 Output parameters . 25g37.2.4.4 Operation results . 25g37.2.5 Update NSD ope
15、ration 25g37.2.5.1 Description 25g37.2.5.2 Input parameters 25g37.2.5.3 Output parameters . 26g37.2.5.4 Operation results . 26g37.2.6 Delete NSD operation . 26g37.2.6.1 Description 26g37.2.6.2 Input parameters 26g3ETSI ETSI GS NFV-IFA 013 V2.3.1 (2017-08) 4 7.2.6.3 Output parameters . 27g37.2.6.4 Op
16、eration results . 27g37.2.7 Query NSD operation . 27g37.2.7.1 Description 27g37.2.7.2 Input parameters 27g37.2.7.3 Output parameters . 27g37.2.7.4 Operation results . 28g37.2.8 On-board PNFD operation 28g37.2.8.1 Description 28g37.2.8.2 Input parameters 28g37.2.8.3 Output parameters . 28g37.2.8.4 Op
17、eration results . 28g37.2.9 Update PNFD operation 28g37.2.9.1 Description 28g37.2.9.2 Input parameters 29g37.2.9.3 Output parameters . 29g37.2.9.4 Operation results . 29g37.2.10 Delete PNFD operation . 29g37.2.10.1 Description 29g37.2.10.2 Input parameters 30g37.2.10.3 Output parameters . 30g37.2.10
18、.4 Operation results . 30g37.2.11 Query PNFD operation . 30g37.2.11.1 Description 30g37.2.11.2 Input parameters 31g37.2.11.3 Output parameters . 31g37.2.11.4 Operation results . 31g37.2.12 Subscribe operation. 31g37.2.12.1 Description 31g37.2.12.2 Input parameters 32g37.2.12.3 Output parameters . 32
19、g37.2.12.4 Operation results . 32g37.2.13 Notify operation 32g37.2.13.1 Description 32g37.3 NS Lifecycle Management interface 33g37.3.1 Description 33g37.3.2 Create NS Identifier operation 33g37.3.2.1 Description 33g37.3.2.2 Input parameters 33g37.3.2.3 Output parameters . 34g37.3.2.4 Operation resu
20、lts . 34g37.3.3 Instantiate NS operation 34g37.3.3.1 Description 34g37.3.3.2 Input parameters 34g37.3.3.3 Output parameters . 36g37.3.3.4 Operation results . 36g37.3.4 Scale NS operation 36g37.3.4.1 Description 36g37.3.4.2 Input parameters 37g37.3.4.3 Output parameters . 37g37.3.4.4 Operation result
21、s . 37g37.3.5 Update NS operation . 38g37.3.5.1 Introduction . 38g37.3.5.2 Input parameters 39g37.3.5.3 Output parameters . 41g37.3.5.4 Operation results . 41g37.3.6 Query NS operation 41g37.3.6.1 Description 41g37.3.6.2 Input parameters 41g37.3.6.3 Output parameters . 42g37.3.6.4 Operation results
22、. 42g37.3.7 Terminate NS operation 42g3ETSI ETSI GS NFV-IFA 013 V2.3.1 (2017-08) 5 7.3.7.1 Description 42g37.3.7.2 Input parameters 43g37.3.7.3 Output parameters . 43g37.3.7.4 Operation results . 43g37.3.8 Delete NS Identifier operation 43g37.3.8.1 Description 43g37.3.8.2 Input parameters 44g37.3.8.
23、3 Output parameters . 44g37.3.8.4 Operation results . 44g37.3.9 Heal NS operation . 44g37.3.9.1 Description 44g37.3.9.2 Input parameters 45g37.3.9.3 Output parameters . 45g37.3.9.4 Operation results . 45g37.3.10 Get Operation Status operation . 45g37.3.10.1 Description 45g37.3.10.2 Input parameters
24、46g37.3.10.3 Output Parameters. 46g37.3.10.4 Operation results . 46g37.3.11 Subscribe operation. 46g37.3.11.1 Description 46g37.3.11.2 Input parameters 46g37.3.11.3 Output parameters . 46g37.3.11.4 Operation results . 47g37.3.12 Notify operation 47g37.3.12.1 Description 47g37.3.13 Terminate Subscrip
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSIGSNFVIFA0132017NETWORKFUNCTIONSVIRTUALISATIONNFVRELEASE2MANAGEMENTANDORCHESTRATIONOSMANFVOREFERENCEPOINTINTERFACEANDINFORMATIONMODELSPECIFICATIONVPDF

链接地址:http://www.mydoc123.com/p-733350.html