EN 45510-1-1997 en Guide for Procurement of Power Station Equipment - Part 1 Common Clauses《在电站设备采购指南 第1部分 通用条款》.pdf
《EN 45510-1-1997 en Guide for Procurement of Power Station Equipment - Part 1 Common Clauses《在电站设备采购指南 第1部分 通用条款》.pdf》由会员分享,可在线阅读,更多相关《EN 45510-1-1997 en Guide for Procurement of Power Station Equipment - Part 1 Common Clauses《在电站设备采购指南 第1部分 通用条款》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、STD-BSI BS EN 4551O-L-ENGL 1998 m Lb24bb9 Ob93098 893 m BRITISH STANDARD Guide for Procurement of power station equipment Part 1. Common clauses * m * The European Standard EN 45510-1 : 1997 has the status of a British standard ICs 27.100 BS EN 45510-1 : 1998 NO COPYING WITHOUT BSI PERMISSION EXCEPT
2、 AS PERMITTED BY COPYRIGHT LAW - STD-BSI BS EN 45510-1-ENGL 199 1624bb9 Ob93099 72T BS EN 45610-1 : 1998 National foreword This British Sandard is the English language version of EN 45510-1 : 1997 published by the European Commit - present to the responsible inte - monitor related intet ortry endors
3、ement, at the latest by AprU 1998, and coicting nationai stardards shau be wiMmum at the latest by AprU 1998. This Guide f0rpmmwn.M has been pmpare under mandates given to CEN and CENELEC by the Eumpmn Cornmission and ule Eumpean Free liade Association. Th$.sGuidefiprocurementisapartofaseriesof Gu?-
4、smandated to couerthepcut ofpozum statim pant and equipment in amformiicy with, Europaan Ptvcumt LXmtves. The Guid.es am: misGuidefip?Dcu-thasbeenpreparedbythe EN 45510: Guide for procurement of power station Part 1: Part2-1: Part 2-2: Part 2-3: Part2-4: Part 2-5: part 2-6: Partz-E Part 2-8: Part 2-
5、9: Part 3-1: Part 3-2: Part 3-3: Part4-1: Part 4-2: hrt4-3: Part 4-4: Part4-5: Part 4-6: Part 4-7: Part 4-8: Part 4-9: Part 4-1 O: Part 5-1: Part 5-2: Part 5-22 Part 5-4: Part 6-1: Part 6-2: Part 6-3: Part 6-4: Part 6-5: Part 6-6: Part 6-E Part 6-8: Part 6-9: Part 7-1: Part”-2: Part 8-1: EN 4551 O P
6、art 1 contains those clauses common to a4 the abwe Guidespitring thepvisirms of a rwm equipment spa$% naEure fi use in the procuremat of puwer statim plant. EN45510 is the r6pmab *i -pmdictedper$ormance is achw - ancillary equipment is pvperg s2zea; - mhbiU, ava#!ab and Metg tvquits are achw -cons.i
7、derationisgimtotheevalwicion process and the qualitg maclsures to be applied. This Guide does not dderm.ine the type of specification (e.g. deta - any allocation of responsibilities which are determid by the contmct. This Guide does not prescribe the amngemmt of the Ciocuments in the enquiry. NOTE.
8、As a comprehensive Eumpean envronmta policy is stiU under preparation, this Guide - geological e.g. seimnic conditms and chamctenstics of subsoil (e.g. caverns, gliding stratifications, bad bearing capability of subsoils); - geographic e.g. elevation, irme of local topography and structures; - hydro
9、logical e.g. jooding and tides. O BSI 1998 - STD-BSI ES EN 45510-1-ENGL 1998 D lb24bb9 Ob93105 853 Page 6 EN 46611: 1997 4.3 Equipment task The speclk these should be to a mgnM European or intaacional stunad The speciic Guides give further recomenons on other services required for the operation of t
10、he equipment here, if appropriate. and 4.7 Other interfaces The speccnt intm$es mq if amyropriate). In - restrictions e.g. process waste disposal. supplies or cooling systems; 7.2 Manning levels The specification should define the mer station manning levels where uley may iqfiumm the equipment suppl
11、y. The specific Guides give further recommendations on manning levels here, if appropriate. 7.3 Normal operation The specification should defim in had temzs the expected normal opetation of the power station and of the equipment. The specifc Guides give further recommendations on normal operation he
12、re, if appropriate. 7.4 Operating hours The specification should define the total lfe time required of the power station and the equipment (e.g. hours) and the required operating period of the equipment. The specific Guides give further reconmendations on operating hours here, if appropriate. 7.6 St
13、art-up and shut-down The specific Guides give relevant recommendations on start-up and shutxiown cycles and types here. The speclfecation should define the expected changeover strategy where sturuiby equipment or bypasses are provided. The specific Guides give further recommendations on change over
14、strategy here, if appropriate. 7.6 Abnormal conditions The spectfEcation should provide information on the known atmonnal conditions to which the equipment might be suected. The supplier should take #,ese into account in the Wiqn or seiectwn of componentshnaterials. The specific Guides give further
15、relevant recommendations on abnormal conditions here, if appropriate. 7.7 Further operational requirements Some of the specific Guides give further recommendations on equipment related operationai requirements such as load changes, out of service conditions, extreme conditions and accidental operati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN4551011997ENGUIDEFORPROCUREMENTOFPOWERSTATIONEQUIPMENTPART1COMMONCLAUSES 电站设备 采购 指南 部分 通用 条款 PDF
![提示](http://www.mydoc123.com/images/bang_tan.gif)
链接地址:http://www.mydoc123.com/p-716539.html