EN 14591-2-2007 en Explosion prevention and protection in underground mines - Protective systems - Part 2 Passive water trough barriers (Incorporating Corrigendum September 2008)《地.pdf
《EN 14591-2-2007 en Explosion prevention and protection in underground mines - Protective systems - Part 2 Passive water trough barriers (Incorporating Corrigendum September 2008)《地.pdf》由会员分享,可在线阅读,更多相关《EN 14591-2-2007 en Explosion prevention and protection in underground mines - Protective systems - Part 2 Passive water trough barriers (Incorporating Corrigendum September 2008)《地.pdf(52页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARDBS EN 14591-2:2007IncorporatingcorrigendumSeptember 2008Explosion prevention and protection in underground mines Protective systems Part 2: Passive water trough barriersICS 13.230; 73.100.99g49g50g3g38g50g51g60g44g49g42g3g58g44g55g43g50g56g55g3g37g54g44g3g51g40g53g48g44g54g54g44g50g4
2、9g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g55g40g39g3g37g60g3g38g50g51g60g53g44g42g43g55g3g47g36g58National forewordThis British Standard is the UK implementation of EN 14591-2:2007, incorporating corrigendum September 2008.The UK participation in its preparation was entrusted to Technical Co
3、mmittee FSH/23, Explosion and fire precautions in industrial and chemical plant.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its cor
4、rect application.Compliance with a British Standard cannot confer immunity from legal obligations.BS EN 14591-2:2007This British Standard was published under the authority of the Standards Policy and Strategy Committee on 29 June 2007 BSI 2010Amendments/corrigenda issued since publicationDate Commen
5、ts 28 February 2010 Implementation of CEN corrigendum September 2008; row inserted in Table ZA.1 for 1.2.1ISBN 978 0 580 64526 6EUROPEAN STANDARDNORME EUROPENNEEUROPISCHE NORMEN 14591-2March 2007ICS 13.230; 73.100.99English VersionIncorporating corrigendumSeptember 2008Explosion prevention and prote
6、ction in underground mines -Protective systems - Part 2: Passive water trough barriersProtection contre lexplosion dans les mines souterraines -Systmes de protection - Partie 2: Arrts-barrages passifs bacs leauExplosionsschutz in untertgigen Bergwerken -Schutzsysteme - Teil 2: Passive Wassertrogsper
7、renThis European Standard was approved by CEN on 4 February 2007.CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this EuropeanStandard the status of a national standard without any alteration. Up-to-date lists and bibliographical re
8、ferences concerning such nationalstandards may be obtained on application to the CEN Management Centre or to any CEN member.This European Standard exists in three official versions (English, French, German). A version in any other language made by translationunder the responsibility of a CEN member
9、into its own language and notified to the CEN Management Centre has the same status as theofficial versions.CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland,France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia
10、, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal,Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.EUROPEAN COMMITTEE FOR STANDARDIZATIONCOMIT EUROPEN DE NORMALISATIONEUROPISCHES KOMITEE FR NORMUNGManagement Centre: rue de Stassart, 36 B-1050 Brussels 20
11、07 CEN All rights of exploitation in any form and by any means reservedworldwide for CEN national Members.Ref. No. EN 14591-2:2007: EEN 14591-2:2007 (E) 2 Contents Page Foreword5 Introduction .6 1 Scope 7 2 Normative references 7 3 Terms and definitions .7 4 Construction requirements of water trough
12、s .10 4.1 General10 4.2 Dimensions, specifications 10 5 Testing of water troughs.11 5.1 General11 5.2 Construction tests .11 5.2.1 Shape, capacity, dimensions11 5.2.2 Strength, shape retention .11 5.2.3 Water level indicator11 5.3 Testing of electrostatic properties.12 5.3.1 Test method12 5.3.2 Asse
13、ssment12 6 Additional fittings for water troughs12 7 Marking of water troughs12 8 Construction of concentrated and distributed water trough barriers12 8.1 General12 8.2 Framework structures .12 8.3 Arrangement of troughs in the roadway cross-section.13 8.4 Configuration of water trough barriers in m
14、ine workings.13 9 Marking of water trough barriers .15 10 Information for use 16 Annex A (normative) Construction of quick-deploy passive water trough barriers 17 A.1 General17 A.2 Trough frames17 A.3 Ropes and chains 17 A.4 Attachment supports.17 A.5 Arrangement of the quick-deploy water trough bar
15、riers in the roadway.17 A.6 Volume of water to be contained by quick-deploy water trough barriers .18 Annex B (normative) Example of acceptable test procedure for water troughs 19 B.1 Testing of heat reaction properties19 B.1.1 Test procedure.19 B.1.2 Test arrangement.19 B.1.3 Procedure .20 B.1.4 As
16、sessment20 B.2 Testing of explosion properties .20 B.2.1 Testing of water dispersion20 B.2.2 Testing the extinguishing efficiency in full-scale tests .22 B.3 Testing of fire-resistance properties .22 Annex C (informative) Example of marking of water troughs 23 BS EN 14591-2:2007EN 14591-2:2007 (E) 3
17、 Annex D (informative) Examples for configuration of water troughs24 Annex E (informative) Example for marking of water trough barriers 44 Annex F (normative) Instructions for water trough barriers 45 Annex ZA (informative) Relationship between this European Standard and the Essential Requirements o
18、f EU Directive 94/9/EC46 Bibliography48 Figures Figure 1 Trough group, plan view 9 Figure 2 Water trough type A (side elevations) 10 Figure 3 Water trough type B (side elevations) 10 Figure 4 General rules for water trough barriers in mine workings .15 Figure A.1 Quick-deploy water trough barrier (e
19、xample) 18 Figure B.1 Test arrangement for determining heat reaction properties 19 Figure B.2 Test arrangement for investigating water dispersion .21 Figure D.1 Location of water troughs, sectional view .24 Figure D.2 Arrangement of troughs in roadway cross-section coverage.25 Figure D.3 Arrangement
20、 of troughs in roadway cross-section horizontal distances .26 Figure D.4 Arrangement of troughs in the roadway cross-section vertical distances27 Figure D.5 Arrangement of troughs in the roadway cross-section vertical distances27 Figure D.6 Arrangement of troughs in the roadway cross-section transve
21、rse and longitudinal position.28 Figure D.7 Arrangement of troughs in the roadway cross-section Obscurement by supports or fixtures29 Figure D.8 Arrangement of troughs in the roadway cross-section Obscurement by supports or fixtures30 Figure D.9 Arrangement of troughs in the roadway cross-section Ob
22、scurement by troughs .30 Figure D.10 Arrangement of vertically-offset troughs in the roadway cross-section, distance 415 275 5 760 5 675 90 4,5 Type B 20 2 500 2,5 415 320 5 760 5 675 90 4,5 The covers shall be designed to give a flush fit with the outer rim of the containers. 5 Testing of water tro
23、ughs 5.1 General The test pieces for the tests described below comprise one or several water troughs which shall come from the same production run. The number of test pieces required is determined by the respective testing station. When issuing contracts for testing, each testing station shall be pr
24、ovided not only with descriptions and drawings of the equipment (e.g. containers, covers, floats and lid holders), but also with precise data on the composition of the material used. For an example of acceptable test procedures, see Annex B. NOTE Other test procedures are under consideration. 5.2 Co
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- EN1459122007ENEXPLOSIONPREVENTIONANDPROTECTIONINUNDERGROUNDMINESPROTECTIVESYSTEMSPART2PASSIVEWATERTROUGHBARRIERSINCORPORATINGCORRIGENDUMSEPTEMBER2008

链接地址:http://www.mydoc123.com/p-714296.html