1、 EIA STANDARD TP-21E Insulation Resistance Test Procedure for Electrical Connectors, Sockets and Coaxial Contacts EIA-364-21E (Revision of EIA-364-21D) May 2014 ANSI/EIA-364-21E Approved: May 29, 2014 EIA-364-21E NOTICE EIA Engineering Standards and Publications are designed to serve the public inte
2、rest through eliminating misunderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for his particular need. Existence of such Standards and Publicat
3、ions shall not in any respect preclude any member or nonmember of ECIA from manufacturing or selling products not conforming to such Standards and Publications, nor shall the existence of such Standards and Publications preclude their voluntary use by those other than ECIA members, whether the stand
4、ard is to be used either domestically or internationally. Standards and Publications are adopted by ECIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, ECIA does not assume any liability to any patent owner, nor does it assume any obligation whatev
5、er to parties adopting the Standard or Publication. This standard is based upon the major technical content of International Electrotechnical Commission standard 60512-3-1 (was 512-2, test 3a), Insulation Resistance, 2002-02, first edition. It conforms in all essential respects this IEC standard. Th
6、is Standard does not purport to address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health practices and to determine the applicability of regulatory limitations befor
7、e its use. (From Standards Proposal No. 5323, formulated under the cognizance of the CE-2.0 Committee on EIA National Connector and Sockets Standards.) Published by Electronic Components Industry Association 2014 EIA Standards and between connector shell or mounting plate and the closest adjacent co
8、ntact, or both. Unless otherwise specified in the referencing document, a minimum of five measurements (5 adjacent contacts and/or 5 contacts-to-shell and/or 5 contacts-to-base plate) or 10% of the total number of contacts (whichever is greater) shall be made for each case, per test specimen. The sa
9、me contact locations for a given connector shall be used each time the insulation resistance test is performed. Unless otherwise specified, test voltage applied shall be 500 Vdc 10%. Insulation resistance measurements for coaxial contacts shall be made between the inner and outer contacts, as specif
10、ied in the referencing document. 4.2 Electrification time When electrification time is a factor, or when variable data are required, the insulation measurements shall be made immediately after a two-minute period of uninterrupted test voltage application, unless otherwise specified. However, if the
11、instrument reading indicates that an insulation resistance meets the specified limit, and is steady or increasing, the test may be terminated before the end of the specified period. When more than one measurement is specified, subsequent measurements of insulation resistance shall be made using the
12、same polarity as the initial measurements. The minimum value of insulation resistance obtained shall be greater than the minimum value specified in the requirements for the specimens being tested. 4.3 Precautions Suitable precautions must be taken to protect personnel and apparatus from the relative
13、ly high potentials used in performing the test. Care shall be taken to prevent a direct short circuit of the testing apparatus since damage to the indication device may result. 4.4 Final measurements When insulation resistance is performed in conjunction with environmental tests, the specimens shall
14、 be measured within one hour, unless otherwise specified in the referencing document. EIA-364-21E Page 3 5 Details to be specified The following details shall be specified in the referencing document: 5.1 Test specimen preparations or conditioning, if required; see 3.2.1 5.2 Magnitude of test voltag
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ECAEIA36421E2014TP21EINSULATIONRESISTANCETESTPROCEDUREFORELECTRICALCONNECTORSSOCKETSANDCOAXIALCONTACTSPDF

链接地址:http://www.mydoc123.com/p-704239.html