DOT 49 CFR PART 633-2010 PROJECT MANAGEMENT OVERSIGHT.pdf
《DOT 49 CFR PART 633-2010 PROJECT MANAGEMENT OVERSIGHT.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 633-2010 PROJECT MANAGEMENT OVERSIGHT.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、463 Federal Transit Admin., DOT 633.5 good-faith written response to this re-quest will be treated as a failure to re-port data under 630.5. 630.8 Questionable data items. FTA may enter a zero, or adjust any questionable data item(s), in any re-porting entitys NTD submission that is used in computin
2、g the Section 5307 apportionment. These adjustments may be made if any data appears to be inaccurate, have not been collected and reported in accordance with FTA ref-erence documents, or if there is not adequate documentation and a reliable recordkeeping system. 630.9 Notice of FTA action. Before ta
3、king final action under 630.5 or 630.8, FTA will transmit a written request to the reporting entity to provide the necessary information within a specified reasonable period of time. FTA will advise the reporting en-tity of its final decision. 630.10 Waiver of reporting require-ments. Waivers of one
4、 or more sections of the reporting requirements may be granted at the discretion of the Admin-istrator on a written showing that the party seeking the waiver cannot fur-nish the required data without unrea-sonable expense and inconvenience. Each waiver will be for a specified pe-riod of time. 630.11
5、 Data adjustments. Errors in the data used in making the Section 5307 apportionment may be discovered after any particular years apportionment is completed. If so, FTA shall make adjustments to correct these errors in a subsequent years ap-portionment to the extent feasible. PART 633PROJECT MANAGEME
6、NT OVERSIGHT Subpart AGeneral Provisions Sec. 633.1 Purpose. 633.3 Scope. 633.5 Definitions. Subpart BProject Management Oversight Services 633.11 Covered projects. 633.13 Initiation of PMO services. 633.15 Access to information. 633.17 PMO contractor eligibility. 633.19 Financing the PMO program. S
7、ubpart CProject Management Plans 633.21 Basic requirement. 633.23 FTA review of PMP. 633.25 Contents of a project management plan. 633.27 Implementation of a project manage-ment plan. 633.29 PMP waivers. AUTHORITY: 49 U.S.C. 1601 et. seq., 1619. SOURCE: 54 FR 36711, Sept. 1, 1989, unless otherwise n
8、oted. Subpart AGeneral Provisions 633.1 Purpose. This part implements section 324 of the Surface Transportation and Uni-form Relocation Assistance Act of 1987 (Pub. L. 10017), which added section 23 to the FT Act. The part provides for a two-part program for major capital projects receiving assistan
9、ce from the agency. First, subpart B discusses project management oversight, de-signed primarily to aid FTA in its role of ensuring successful implementation of federally-funded projects. Second, subpart C discusses the project man-agement plan (PMP) required of all major capital projects. The PMP i
10、s de-signed to enhance the recipients plan-ning and implementation efforts and to assist FTAs grant application analysis efforts. 633.3 Scope. This rule applies to a recipient of Federal financial assistance under-taking a major capital project using funds made available under: (a) Sections 3, 9, or
11、 18 of the Federal Mass Transit Act of 1964, as amended; (b) 23 U.S.C. 103(e)(4); or (c) Section 14(b) of the National Cap-ital Transportation Amendments of 1979 (93 Stat. 1320, Pub. L. 96184). 633.5 Definitions. As used in this part: VerDate Mar2010 10:10 Dec 13, 2010 Jkt 220218 PO 00000 Frm 00473
12、Fmt 8010 Sfmt 8010 Y:SGML220218.XXX 220218wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-464 49 CFR Ch. VI (10110 Edition) 633.11 Administrator means the Adminis-trator of the Federal Transit Adminis-tration or the
13、Administrators des-ignee. Days means calendar days. Fixed guideway means any public transportation facility which utilizes and occupies a separate right-of-way or rails. This includes, but is not limited to, rapid rail, light rail, commuter rail, automated guideway transit, people movers, and exclus
14、ive facilities for buses and other high occupancy vehi-cles. Full funding agreement means a writ-ten agreement between FTA and a re-cipient that establishes a financial ceiling with respect to the Govern-ments participation in a project; sets forth the scope of a project; and sets forth the mutual u
15、nderstanding, terms, and conditions relating to the con-struction and management of a project. Major capital project means a project that: (1) Involves the construction of a new fixed guideway or extension of an exist-ing fixed guideway; (2) Involves the rehabilitation or modernization of an existin
16、g fixed guideway with a total project cost in excess of $100 million; or (3) The Administrator determines is a major capital project because the project management oversight pro-gram will benefit specifically the agen-cy or the recipient. Typically, this means a project that: (i) Generally is expect
17、ed to have a total project cost in excess of $100 mil-lion or more to construct; (ii) Is not exclusively for the routine acquisition, maintenance, or rehabili-tation of vehicles or other rolling stock; (iii) Involves new technology; (iv) Is of a unique nature for the re-cipient; or (v) Involves a re
18、cipient whose past experience indicates to the agency the appropriateness of the extension of this program. Project management oversight means the monitoring of a major capital projects progress to determine wheth-er a project is on time, within budget, in conformance with design criteria, construct
19、ed to approved plans and specifications and is efficiently and ef-fectively implemented. Project management plan means a written document prepared by a recipi-ent that explicitly defines all tasks necessary to implement a major cap-ital project. Recipient means a direct recipient of Federal financia
20、l assistance from FTA. FT Act means the Federal Mass Tran-sit Act of 1964, as amended. FTA means the Federal Transit Ad-ministration. Subpart BProject Management Oversight Services 633.11 Covered projects. The Administrator may contract for project management oversight services when the following tw
21、o conditions apply: (a) The recipient is using funds made available under section 3, 9, or 18 of the Federal Mass Transit Act of 1964, as amended; 23 U.S.C. 103(e)(4); or section 14(b) of the National Capital Transpor-tation Amendments of 1979; and (b) The project is a major capital project. 633.13
22、Initiation of PMO services. PMO services will be initiated as soon as it is practicable, once the agen-cy determines this part applies. In most cases, this means that PMO will begin during the preliminary engineer-ing phase of the project. However, con-sistent with other provisions in this part, the
23、 Administrator may determine that a project is a major capital project at any point during its imple-mentation. Should this occur, PMO will begin as soon as practicable after this agency determination. 633.15 Access to information. A recipient of FTA funds for a major capital project shall provide t
24、he Ad-ministrator and the PMO contractor chosen under this part access to its records and construction sites, as rea-sonably may be required. 633.17 PMO contractor eligibility. (a) Any person or entity may provide project management oversight services VerDate Mar2010 10:10 Dec 13, 2010 Jkt 220218 PO
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART6332010PROJECTMANAGEMENTOVERSIGHTPDF

链接地址:http://www.mydoc123.com/p-702225.html