DOT 49 CFR PART 230-2010 STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS.pdf
《DOT 49 CFR PART 230-2010 STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 230-2010 STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS.pdf(66页珍藏版)》请在麦多课文档分享上搜索。
1、487 Federal Railroad Administration, DOT Pt. 230 IV. RECORDKEEPING To demonstrate compliance, the entity conducting the test shall maintain records of the following data. The records created under this procedure shall be retained and made readily accessible for review for a min-imum of three years.
2、All records may be maintained in either written or electronic form. (1) Name(s) of persons conducting the test, and the date of the test. (2) Description of locomotive being tested, including: make, model number, serial num-ber, and date of manufacture. (3) Description of sound level meter and calib
3、rator, including: make, model, type, se-rial number, and manufacturers calibration date. (4) The recorded measurement during cali-bration and for each microphone location during operating conditions. (5) Other information as appropriate to de-scribe the testing conditions and procedure, including wh
4、ether or not the locomotive was tested under self-loading conditions, or not. (6) Where a locomotive fails a test and is re-tested under the provisions of III(9) of this appendix, the suspected reason(s) for the failure. 71 FR 63136, Oct. 27, 2006, as amended at 74 FR 25174, May 27, 2009 PART 230STE
5、AM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Subpart AGeneral Sec. 230.1 Purpose and scope. 230.2 Applicability. 230.3 Implementation. 230.4 Penalties. 230.5 Preemptive effect. 230.6 Waivers. 230.7 Responsibility for compliance. 230.8 Definitions. 230.9 Information collection. 230.10 Reserved
6、GENERAL INSPECTION REQUIREMENTS 230.11 Repair of non-complying conditions. 230.12 Movement of non-complying steam locomotives. 230.13 Daily inspection. 230.14 Thirty-one (31) service day inspec-tion. 230.15 Ninety-two (92) service day inspec-tion. 230.16 Annual inspection. 230.17 One thousand four h
7、undred seventy- two (1472) service day inspection. RECORDKEEPING REQUIREMENTS 230.18 Service days. 230.19 Posting of FRA Form No. 1 and FRA Form No. 3. 230.20 Alteration and repair report for steam locomotive boilers. 230.21 Steam locomotive number change. 230.22 Accident reports. Subpart BBoilers a
8、nd Appurtenances 230.23 Responsibility for general construc-tion and safe working pressure. ALLOWABLE STRESS 230.24 Maximum allowable stress. 230.25 Maximum allowable stress on stays and braces. STRENGTH OF MATERIALS 230.26 Tensile strength of shell plates. 230.27 Maximum shearing strength of rivets
9、. 230.28 Higher shearing strength of rivets. INSPECTION AND REPAIR 230.29 Inspection and repair. 230.30 Lap-joint seam boilers. 230.31 Flues to be removed. 230.32 Time and method of inspection. 230.33 Welded repairs and alterations. 230.34 Riveted repairs and alterations. PRESSURE TESTING OF BOILERS
10、 230.35 Pressure testing. 230.36 Hydrostatic testing of boilers. 230.37 Steam test following repairs or alter-ations. STAYBOLTS 230.38 Telltale holes. 230.39 Broken staybolts. 230.40 Time and method of staybolt testing. 230.41 Flexible staybolts with caps. STEAM GAUGES 230.42 Location of gauges. 230
11、.43 Gauge siphon. 230.44 Time of testing. 230.45 Method of testing. 230.46 Badge plates. 230.47 Boiler number. SAFETY RELIEF VALVES 230.48 Number and capacity. 230.49 Setting of safety relief valves. 230.50 Time of testing. WATER GLASSES AND GAUGE COCKS 230.51 Number and location. 230.52 Water glass
12、 valves. 230.53 Time of cleaning. 230.54 Testing and maintenance. 230.55 Tubular type water and lubricator glasses and shields. 230.56 Water glass lamps. VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00497 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvi
13、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-488 49 CFR Ch. II (10110 Edition) 230.1 INJECTORS, FEEDWATER PUMPS, AND FLUE PLUGS 230.57 Injectors and feedwater pumps. 230.58 Flue plugs. FUSIBLE PLUGS 230.59 Fusible plugs. WASHING BOILERS 230.60 Time of
14、washing. 230.61 Arch tubes, water bar tubes, circulators and thermic siphons. STEAM PIPES 230.62 Dry pipe. 230.63 Smoke box, steam pipes and pressure parts. STEAM LEAKS 230.64 Leaks under lagging. 230.65 Steam blocking view of engine crew. Subpart CSteam Locomotives and Tenders 230.66 Design, constr
15、uction, and mainte-nance. 230.67 Responsibility for inspection and re-pairs. SPEED INDICATORS 230.68 Speed indicators. ASH PANS 230.69 Ash pans. BRAKE AND SIGNAL EQUIPMENT 230.70 Safe condition. 230.71 Orifice testing of compressors. 230.72 Testing main reservoirs. 230.73 Air gauges. 230.74 Time of
16、cleaning. 230.75 Stenciling dates of tests and clean-ing. 230.76 Piston travel. 230.77 Foundation brake gear. 230.78 Leakage. 230.79 Train signal system. CABS, WARNING SIGNALS, SANDERS AND LIGHTS 230.80 Cabs. 230.81 Cab aprons. 230.82 Fire doors. 230.83 Cylinder cocks. 230.84 Sanders. 230.85 Audible
17、 warning device. 230.86 Required illumination. 230.87 Cab lights. THROTTLES AND REVERSING GEAR 230.88 Throttles. 230.89 Reverse gear. DRAW GEAR AND DRAFT SYSTEMS 230.90 Draw gear between locomotive and tender. 230.91 Chafing irons. 230.92 Draw gear and draft systems. DRIVING GEAR 230.93 Pistons and
18、piston rods. 230.94 Crossheads. 230.95 Guides. 230.96 Main, side, and valve motion rods. 230.97 Crank pins. RUNNING GEAR 230.98 Driving, trailing, and engine truck axles. 230.99 Tender truck axles. 230.100 Defects in tender truck axles and journals. 230.101 Steam locomotive driving journal boxes. 23
19、0.102 Tender plain bearing journal boxes. 230.103 Tender roller bearing journal boxes. 230.104 Driving box shoes and wedges. 230.105 Lateral motion. TRUCKS, FRAMES AND EQUALIZING SYSTEM 230.106 Steam locomotive frame. 230.107 Tender frame and body. 230.108 Steam locomotive leading and trail-ing truc
20、ks. 230.109 Tender trucks. 230.110 Pilots. 230.111 Spring rigging. WHEELS AND TIRES 230.112 Wheels and tires. 230.113 Wheels and tire defects. 230.114 Wheel centers. STEAM LOCOMOTIVE TANKS 230.115 Feed water tanks. 230.116 Oil tanks. APPENDIX A TO PART 230INSPECTION REQUIREMENTS APPENDIX B TO PART 2
21、30DIAGRAMS AND DRAWINGS APPENDIX C TO PART 230FRA INSPECTION FORMS APPENDIX D TO PART 230CIVIL PENALTY SCHEDULE AUTHORITY: 49 U.S.C. 20103, 20107, 20702; 28 U.S.C. 2461, note; and 49 CFR 1.49. SOURCE: 64 FR 62865, Nov. 17, 1999, unless otherwise noted. Subpart AGeneral 230.1 Purpose and scope. This
22、part prescribes minimum Fed-eral safety standards for all steam-pro-pelled locomotives operated on rail-roads to which this part applies. This VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00498 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvided by IHSN
23、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-489 Federal Railroad Administration, DOT 230.3 1NOTE: As an example, where a locomotive has received a proper boiler inspection after September 25, 1995 pursuant to 230.10 and 230.11 of the regulations in effect prior
24、to January 18, 2000 but has not had its FRA Form No. 4 updated, the locomotive owner or operator may update and verify the FRA Form No. 4 for that locomotive, and submit a timely petition that requests retroactive credit for the boiler inspection. (See 49 CFR parts 200999, revised October 1, 1978.)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART2302010STEAMLOCOMOTIVEINSPECTIONANDMAINTENANCESTANDARDSPDF

链接地址:http://www.mydoc123.com/p-702089.html