欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    DOT 49 CFR PART 230-2010 STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS.pdf

    • 资源ID:702089       资源大小:2.21MB        全文页数:66页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    DOT 49 CFR PART 230-2010 STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS.pdf

    1、487 Federal Railroad Administration, DOT Pt. 230 IV. RECORDKEEPING To demonstrate compliance, the entity conducting the test shall maintain records of the following data. The records created under this procedure shall be retained and made readily accessible for review for a min-imum of three years.

    2、All records may be maintained in either written or electronic form. (1) Name(s) of persons conducting the test, and the date of the test. (2) Description of locomotive being tested, including: make, model number, serial num-ber, and date of manufacture. (3) Description of sound level meter and calib

    3、rator, including: make, model, type, se-rial number, and manufacturers calibration date. (4) The recorded measurement during cali-bration and for each microphone location during operating conditions. (5) Other information as appropriate to de-scribe the testing conditions and procedure, including wh

    4、ether or not the locomotive was tested under self-loading conditions, or not. (6) Where a locomotive fails a test and is re-tested under the provisions of III(9) of this appendix, the suspected reason(s) for the failure. 71 FR 63136, Oct. 27, 2006, as amended at 74 FR 25174, May 27, 2009 PART 230STE

    5、AM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Subpart AGeneral Sec. 230.1 Purpose and scope. 230.2 Applicability. 230.3 Implementation. 230.4 Penalties. 230.5 Preemptive effect. 230.6 Waivers. 230.7 Responsibility for compliance. 230.8 Definitions. 230.9 Information collection. 230.10 Reserved

    6、GENERAL INSPECTION REQUIREMENTS 230.11 Repair of non-complying conditions. 230.12 Movement of non-complying steam locomotives. 230.13 Daily inspection. 230.14 Thirty-one (31) service day inspec-tion. 230.15 Ninety-two (92) service day inspec-tion. 230.16 Annual inspection. 230.17 One thousand four h

    7、undred seventy- two (1472) service day inspection. RECORDKEEPING REQUIREMENTS 230.18 Service days. 230.19 Posting of FRA Form No. 1 and FRA Form No. 3. 230.20 Alteration and repair report for steam locomotive boilers. 230.21 Steam locomotive number change. 230.22 Accident reports. Subpart BBoilers a

    8、nd Appurtenances 230.23 Responsibility for general construc-tion and safe working pressure. ALLOWABLE STRESS 230.24 Maximum allowable stress. 230.25 Maximum allowable stress on stays and braces. STRENGTH OF MATERIALS 230.26 Tensile strength of shell plates. 230.27 Maximum shearing strength of rivets

    9、. 230.28 Higher shearing strength of rivets. INSPECTION AND REPAIR 230.29 Inspection and repair. 230.30 Lap-joint seam boilers. 230.31 Flues to be removed. 230.32 Time and method of inspection. 230.33 Welded repairs and alterations. 230.34 Riveted repairs and alterations. PRESSURE TESTING OF BOILERS

    10、 230.35 Pressure testing. 230.36 Hydrostatic testing of boilers. 230.37 Steam test following repairs or alter-ations. STAYBOLTS 230.38 Telltale holes. 230.39 Broken staybolts. 230.40 Time and method of staybolt testing. 230.41 Flexible staybolts with caps. STEAM GAUGES 230.42 Location of gauges. 230

    11、.43 Gauge siphon. 230.44 Time of testing. 230.45 Method of testing. 230.46 Badge plates. 230.47 Boiler number. SAFETY RELIEF VALVES 230.48 Number and capacity. 230.49 Setting of safety relief valves. 230.50 Time of testing. WATER GLASSES AND GAUGE COCKS 230.51 Number and location. 230.52 Water glass

    12、 valves. 230.53 Time of cleaning. 230.54 Testing and maintenance. 230.55 Tubular type water and lubricator glasses and shields. 230.56 Water glass lamps. VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00497 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvi

    13、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-488 49 CFR Ch. II (10110 Edition) 230.1 INJECTORS, FEEDWATER PUMPS, AND FLUE PLUGS 230.57 Injectors and feedwater pumps. 230.58 Flue plugs. FUSIBLE PLUGS 230.59 Fusible plugs. WASHING BOILERS 230.60 Time of

    14、washing. 230.61 Arch tubes, water bar tubes, circulators and thermic siphons. STEAM PIPES 230.62 Dry pipe. 230.63 Smoke box, steam pipes and pressure parts. STEAM LEAKS 230.64 Leaks under lagging. 230.65 Steam blocking view of engine crew. Subpart CSteam Locomotives and Tenders 230.66 Design, constr

    15、uction, and mainte-nance. 230.67 Responsibility for inspection and re-pairs. SPEED INDICATORS 230.68 Speed indicators. ASH PANS 230.69 Ash pans. BRAKE AND SIGNAL EQUIPMENT 230.70 Safe condition. 230.71 Orifice testing of compressors. 230.72 Testing main reservoirs. 230.73 Air gauges. 230.74 Time of

    16、cleaning. 230.75 Stenciling dates of tests and clean-ing. 230.76 Piston travel. 230.77 Foundation brake gear. 230.78 Leakage. 230.79 Train signal system. CABS, WARNING SIGNALS, SANDERS AND LIGHTS 230.80 Cabs. 230.81 Cab aprons. 230.82 Fire doors. 230.83 Cylinder cocks. 230.84 Sanders. 230.85 Audible

    17、 warning device. 230.86 Required illumination. 230.87 Cab lights. THROTTLES AND REVERSING GEAR 230.88 Throttles. 230.89 Reverse gear. DRAW GEAR AND DRAFT SYSTEMS 230.90 Draw gear between locomotive and tender. 230.91 Chafing irons. 230.92 Draw gear and draft systems. DRIVING GEAR 230.93 Pistons and

    18、piston rods. 230.94 Crossheads. 230.95 Guides. 230.96 Main, side, and valve motion rods. 230.97 Crank pins. RUNNING GEAR 230.98 Driving, trailing, and engine truck axles. 230.99 Tender truck axles. 230.100 Defects in tender truck axles and journals. 230.101 Steam locomotive driving journal boxes. 23

    19、0.102 Tender plain bearing journal boxes. 230.103 Tender roller bearing journal boxes. 230.104 Driving box shoes and wedges. 230.105 Lateral motion. TRUCKS, FRAMES AND EQUALIZING SYSTEM 230.106 Steam locomotive frame. 230.107 Tender frame and body. 230.108 Steam locomotive leading and trail-ing truc

    20、ks. 230.109 Tender trucks. 230.110 Pilots. 230.111 Spring rigging. WHEELS AND TIRES 230.112 Wheels and tires. 230.113 Wheels and tire defects. 230.114 Wheel centers. STEAM LOCOMOTIVE TANKS 230.115 Feed water tanks. 230.116 Oil tanks. APPENDIX A TO PART 230INSPECTION REQUIREMENTS APPENDIX B TO PART 2

    21、30DIAGRAMS AND DRAWINGS APPENDIX C TO PART 230FRA INSPECTION FORMS APPENDIX D TO PART 230CIVIL PENALTY SCHEDULE AUTHORITY: 49 U.S.C. 20103, 20107, 20702; 28 U.S.C. 2461, note; and 49 CFR 1.49. SOURCE: 64 FR 62865, Nov. 17, 1999, unless otherwise noted. Subpart AGeneral 230.1 Purpose and scope. This

    22、part prescribes minimum Fed-eral safety standards for all steam-pro-pelled locomotives operated on rail-roads to which this part applies. This VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00498 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvided by IHSN

    23、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-489 Federal Railroad Administration, DOT 230.3 1NOTE: As an example, where a locomotive has received a proper boiler inspection after September 25, 1995 pursuant to 230.10 and 230.11 of the regulations in effect prior

    24、to January 18, 2000 but has not had its FRA Form No. 4 updated, the locomotive owner or operator may update and verify the FRA Form No. 4 for that locomotive, and submit a timely petition that requests retroactive credit for the boiler inspection. (See 49 CFR parts 200999, revised October 1, 1978.)

    25、part does not restrict a railroad from adopting and enforcing additional or more stringent requirements not in-consistent with this part. 230.2 Applicability. (a) Except as provided in paragraph (b) of this section, this part applies to all railroads that operate steam loco-motives. (b) This part do

    26、es not apply to: (1) A railroad with track gage of less than 24 inches; (2) A railroad that operates exclu-sively freight trains and does so only on track inside an installation that is not part of the general system of trans-portation; (3) Rapid transit operations in an urban area that are not conn

    27、ected to the general system of transportation; or (4) A railroad that operates passenger trains and does so only on track inside an installation that is insular, i.e., its operations are limited to a separate en-clave in such a way that there is no reasonable expectation that the safety of the publi

    28、cexcept a business guest, a licensee of the railroad or an affili-ated entity, or a trespasserwould be affected by the operation. An operation will not be considered insular if one or more of the following exists on its line: (i) A public highway-rail crossing that is in use; (ii) An at-grade rail c

    29、rossing that is in use; (iii) A bridge over a public road or waters used for commercial navigation; or (iv) A common corridor with another railroad, i.e., its operations are con-ducted within 30 feet of those of any other railroad. (c) See appendix A of part 209 for a current statement of the FRAs p

    30、olicy on its exercise of jurisdiction. 230.3 Implementation. Except as provided in paragraphs (a) through (c) of this section, the loco-motive owner and/or operator shall per-form a 1472 service day inspection that meets the requirements of 230.17 when the locomotives flues would be re-quired to be

    31、removed pursuant to 230.10, of the regulations in effect prior to January 18, 2000. (See 49 CFR parts 200999, revised October 1, 1978) At the time the locomotive owner and/or operator completes this inspection, it must begin to comply with the rest of the provisions of this part. Up until such time,

    32、 and except as provided in paragraphs (a) through (c) of this sec-tion, compliance with the regulations in effect prior to January 18, 2000 (See 49 CFR parts 200999, revised October 1, 1978) will constitute full compliance with this part. Any interested person may obtain the October 1, 1978 revision

    33、 of 49 CFR parts 200999 by contacting the Federal Railroad Administration, Office of Chief Counsel, 1200 New Jersey Avenue, SE., Washington, DC 20590. (a) One year after January 18, 2000. The following sections of this part must be complied with by January 18, 2001: 230.7, 230.51, 230.57, 230.68, 23

    34、0.70, 230.85, 230.87, 230.115, and 230.116. (b) Interim flue removal extensions. FRA will continue to consider requests for flue removal extensions under the provisions of 230.10 of the regulations in effect prior to January 18, 2000 (See 49 CFR parts 200999, revised October 1, 1978) until January 1

    35、8, 2002. (c) Petition for special consideration. The locomotive owner or operator may petition FRA for special consideration of this parts implementation with re-spect to any locomotive that has either fully or partially satisfied the require-ments of 230.17 within the three (3) year period prior to

    36、 September 25, 1998provided the locomotive is in full compliance with 230.17 by the time the petition is actually filed.1(1) Petition process. Petitions must be filed by January 18, 2001 and must be accompanied by all relevant docu-mentation to be considered, including a FRA Form No. 4 (see appendix

    37、 C of this part) that has been calculated in ac-cordance with 230.17, and all records that demonstrate the number of days VerDate Mar2010 09:47 Dec 14, 2010 Jkt 220215 PO 00000 Frm 00499 Fmt 8010 Sfmt 8010 Y:SGML220215.XXX 220215jdjones on DSK8KYBLC1PROD with CFRProvided by IHSNot for ResaleNo repro

    38、duction or networking permitted without license from IHS-,-,-490 49 CFR Ch. II (10110 Edition) 230.4 the locomotive has been in service. Based upon the documentation pro-vided, FRA will calculate the number of service days the locomotive has accrued and will notify the petitioner of the number of se

    39、rvice days that re-main in the locomotives 1472 service day cycle. Petitions should be sent to FRA by some form of registered mail to ensure a record of delivery. FRA will investigate these petitions and will re-spond to these petitions within one year of their receipt. FRA will send its response by

    40、 some form of registered mail to ensure that a record of delivery is created. In its response, FRA may grant the petition or deny it. If FRA grants the petition, the entirety of the revised requirements will become effec-tive upon receipt of FRAs response, unless FRAs response indicates other-wise.

    41、If FRA denies the petition, the rule will become effective as provided in the first paragraph of this section. (2) FRA silence. Anyone who does not receive a response within one year of the date they filed their petition, whether through administrative or postal error, must notify FRA that the respo

    42、nse has not been received. The no-tification should be provided to FRA by some form of registered mail to en-sure a record of delivery. Upon receipt of this notification, FRA will ensure that a response is either issued, or re- issued, as soon as possible. In the in-terim, however, any operator who

    43、is at the end of their inspection cycle under the rules in effect prior to January 18, 2000 (See 49 CFR parts 200999, revised October 1, 1978) will be allowed to re-main in service without conducting the required inspection under 230.17 for an additional six months, or until they re-ceive FRAs decis

    44、ion, whichever occurs first. 64 FR 62865, Nov. 17, 1999, as amended at 74 FR 25174, May 27, 2009 230.4 Penalties. (a) Any person who violates any re-quirement of this part or causes the violation of any such requirement is subject to a civil penalty of at least $650 and not more than $25,000 per vio

    45、-lation, except that: Penalties may be assessed against individuals only for willful violations, and, where a grossly negligent violation or a pattern of re-peated violations has created an immi-nent hazard of death or injury to per-sons, or has caused death or injury, a penalty not to exceed $100,0

    46、00 per viola-tion may be assessed. Each day a viola-tion continues shall constitute a sepa-rate offense. See appendix A of part 209 for a statement of agency civil penalty policy. (b) Any person who knowingly and willfully falsifies a record or report re-quired by this part may be subject to crimina

    47、l penalties under 49 U.S.C. 21311. 64 FR 62865, Nov. 17, 1999, as amended at 69 FR 30594, May 28, 2004; 72 FR 51197, Sept. 6, 2007; 73 FR 79703, Dec. 30, 2008 230.5 Preemptive effect. The Locomotive Boiler Inspection Act (49 U.S.C. 2070120703) preempts all State laws or regulations concerning locomo

    48、tive safety. Napier v. Atlantic Coast Line R.R., 272 U.S. 605 (1926). How-ever, FRA believes Congress did not in-tend to preempt State laws or regula-tions concerning rail operations over which FRA does not exercise jurisdic-tion. Therefore, in issuing this part, it is FRAs intent that State laws or

    49、 reg-ulations applicable to those rail oper-ations to which this part does not apply (i.e., insular tourist operations) not be preempted. 230.6 Waivers. (a) A person subject to a requirement of this part may petition the Adminis-trator of FRA for a waiver of compli-ance with such requirement. The filing of such a petition does not affect that persons responsibility for compliance with that requirement while the peti-tion is bein


    注意事项

    本文(DOT 49 CFR PART 230-2010 STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS.pdf)为本站会员(roleaisle130)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开