DLA MIL-PRF-1 999 C-2012 ELECTRON TUBE GAS SWITCHING TYPE 6163.pdf
《DLA MIL-PRF-1 999 C-2012 ELECTRON TUBE GAS SWITCHING TYPE 6163.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-PRF-1 999 C-2012 ELECTRON TUBE GAS SWITCHING TYPE 6163.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-PRF-1/999C 13 January 2012 SUPERSEDING MIL-PRF-1/999B 27 August 1999 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, GAS SWITCHING TYPE 6163 This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the electron tube descr
2、ibed herein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: ATR, broadband, F0 = 9,050 MHz. ABSOLUTE RATINGS: Parameter: Unit: Incident power kw Du - TA (nonoperating) C Alt ft Maximum: Minimum: 250 4 0.001 - +100 -40 10,000 - PHYSICAL CHARACTERISTICS: Dimensions: Moun
3、ting position: Test mounts: Weight: Application: See figure 1 Any. See figures 2, 3, and 4. 0.13 pound (approximate). 6/ TEST CONDITIONS: Parameter: Unit: Incident power kw tp s prr pps - F MHz Frequency Tolerance: 5% 0.15 10% Max - F Max Test condition 1: Test condition 2: Test condition 3: 4 20 20
4、0 (min) 0.5 1.0 1.0 1,000 1,000 1,000 - 1.02 1.2 F4 F3 F4 1 2 3 4 9, 050 9,050 9,050 9,050 - 0.1% 1.0% 3% _ GENERAL: Qualification: Not required Preproduction sample approval: Required. 1/ This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III. AMSC N/A
5、FSC 5960 INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/999C 2 TABLE I. Testing and inspection. Inspection Method MIL-STD-1311 Notes Test Conditions Symbol Limits Unit Min Max Preproduction sample approval inspection 1/ Loaded Q
6、 4461 2/ - F0 = F1 QL - 8.5 - High-level VSWR 4474 2/ 2 VSWR - 1.15 - Degradation due to vibration 4021 - - - - - - Conformance inspection, part 1 Tuning susceptance 4482 2/ - F0 = F2; g = 0.05 b -0.06 +0.06 - Firing time 4486 3/ 1 t - 10 sec Arc loss 4488 3/ 1 La - 0.8 dB Electrical symmetry - 2/ 4
7、/ - F0 = F2; g = 0.05 - - 0.06 cm Temperature cycling (nonoperating) 1027 - - - - - - Conformance inspection, part 2 Dielectric material strain 4101 - - - - - - Normalized conductance 4484 2/ - F0 = F2 g - 0.06 - Recovery time 4471 2/ 3 t - 10 s Conformance inspection, part 3 Life test - 6/ 3 Group
8、D t 500 - hrs Life-test end points: - Tuning susceptance 4482 2/ - Method A; F0 = F2; g = 0.05 b -0.08 +0.08 - Arc loss 4488 3/ 1 La - 1.0 dB Normalized conductance 4484 2/ - F0 = F2 g - 0.1 - Recovery time 4471 2/ 3 t - 15 s Temperature cycling life test 1027 - - Group D; 10 cycles (min) - - - - Se
9、e footnotes at top of next page. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/999C 3 TABLE I. Testing and inspection - Continued. 1/ Preproduction sample approval requirements hereby replace any qualifications requirements referable to t
10、he product covered herein. The term “First article testing“ shall be considered as synonymous with the term “Preproduction sample approval testing.“ All tests applicable herein (including all preproduction sample approval and conformance inspection, parts 1, 2, and 3) shall be performed during prepr
11、oduction sample inspection. A failure of any one tube in any of the tests shall be cause for decision of preproduction sample disapproval. 2/ The tube under test (TUT) shall be mounted in test mount A as detailed in figures 2 and 3. 3/ This test shall be performed at least 168 hours after pumping an
12、d at least 24 hours after any previous discharge. 4/ The shift in position of the voltage minimum, resulting from reversing the TUT in the test mount, shall be within the specified limits when measured in an RG-51/U waveguide. 5/ This tube is designed for application in pairs mounted in the wide wal
13、ls of RG-51/U waveguide. 6/ The TUT shall be mounted in test mount B as detailed in figure 4. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/999C 4 FIGURE 1. Outline drawing of electron tube type 6163. Provided by IHSNot for ResaleNo repro
14、duction or networking permitted without license from IHS-,-,-MIL-PRF-1/999C 5 NOTES: 1. The tubulation shall fall within a circle .438 inch (11.13 mm) diameter maximum located from the center lines of the end plate. 2. An optional cosmetic silver plate 100 MSI minimum or equivalent finish may be app
15、lied, at the manufacturers discretion. 3. Applies to four walls for full length from radius J to window plate. 4. Four long edges of tube body shall have a .020 inch (0.51 mm) .010 inch (0.25 mm) approximate radius. 5. A radius of .031 inch (0.79 mm) maximum or a chamfer of .016 (0.41 mm) x 45 maxim
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILPRF1999C2012ELECTRONTUBEGASSWITCHINGTYPE6163PDF

链接地址:http://www.mydoc123.com/p-692128.html