DLA MIL-DTL-81543 C-2010 CONTAINER ASSEMBLIES INFLATABLE LIFE RAFT.pdf
《DLA MIL-DTL-81543 C-2010 CONTAINER ASSEMBLIES INFLATABLE LIFE RAFT.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-DTL-81543 C-2010 CONTAINER ASSEMBLIES INFLATABLE LIFE RAFT.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、AMSC N/A FSC 4220 MIL-DTL-81543C 14 July 2010 SUPERSEDING MIL-C-81543B (AS) 22 February 1980 DETAIL SPECIFICATION CONTAINER ASSEMBLIES, INFLATABLE LIFE RAFT This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification cov
2、ers the requirements for inflatable life raft and accessory container assemblies. 1.2 Classification. Inflatable life raft containers will be of the following types. Type I - Container Assembly, Life Raft, Helicopter Type II - Container Assembly, Outer, Standard Soft Pack Type III - Container Assemb
3、ly, Combination Life Raft and Equipment Container Type IV - Container Assembly, Rigid Seat Survival Kit or High Speed Soft Pack Type V - Container Assembly, Pararaft Kit for NB-7 Parachute Type VI - Accessory Container Assembly, LRU-12/A, LRU-13/A, and LRU-1/P Type VII - Accessory Container Assembly
4、, LRU-14/A Type VIII - Accessory Container Assembly, LRU-15/A (Mark 20) Type IX - Accessory Container Assembly, 20 Man Life Raft, for Wing Installation in KC-130F and C-130F Aircraft Type X - Container assembly, VEE Bottom Life Raft Helicopter Comments, suggestions, or questions on this document sho
5、uld be addressed to Defense Supply Center Philadelphia, ATTN: DSCP-NASA, 700 Robbins Avenue, Philadelphia, PA 19111-5096 or email to dscpg and shall extend from just being visible to a maximum of one inch beyond the applicable edge. The adhesive shall not be allowed to remain in clots or permitted t
6、o extend in such a manner as to result in localized stiffness. There shall be no spots or stains resulting from the cementing operation. The cemented areas shall not contain any trapped air, channels, edge lifts, or excessive wrinkling. 3.3.4 Seams and stitching. Unless otherwise specified, all the
7、seams and stitching used in the fabrication of the container assemblies shall conform to applicable drawing requirements; and shall be accomplished with stitch Type 301 conforming to ASTM D6193, with 6 to 8 stitches per inch. All the seam edges shall be properly forced out and shall not contain any
8、folds. No seam shall be twisted, puckered, or pleated, and no part of the container shall be caught in an unrelated operation or seam. All the thread ends shall be trimmed to a length of 1/4 to 3/8 inch. Each row of stitching shall be straight and parallel to the seam edge. The straightness of the s
9、titching, in any row, shall be maintained within a tolerance of 1/32 inch. The ends of the stitching that are not caught in other seams or stitching shall be securely backstitched, by overlapping on itself for at least 1/2 inch. Thread breaks, skips, and run-offs shall be overstitched not less than
10、one inch. The thread tension shall be maintained so that there shall not be any loose or overly tight stitching, and the lock shall be imbedded in the materials sewn together. There shall be no spots or stains resulting from the sewing operation. 3.3.4.1 Bartacking. Unless otherwise specified, the n
11、umber of stitches per bartack shall be based proportionally on 7/8 inch long bartack containing a minimum of 49 stitches. The length and location of each bartack shall be as specified in applicable drawings. 3.4 Color. The color of the containers and components shall be as specified in applicable dr
12、awings. 3.5 Markings. Markings shall be in accordance with MIL-STD-130. Ink, color, size, and location of markings shall be as specified in applicable drawings. Letters and numerals 1/4 inch or less in height shall not be stenciled. Serial number for containers shall be in accordance with 3.5.1. All
13、 markings shall be thoroughly dry prior to packing or packaging. Markings may be applied directly to the specified area or to a patch securely adhered to the specified area. Material and color of the patch, if used, shall be the same as the container material to which applied. 3.5.1 Serial numbers.
14、Unless otherwise specified, each container shall be identified by a serial number which shall be assigned by the manufacturer. Serialization shall be by a block of consecutive number to cover the entire acquisition quantity. 3.6 Dimensions. When measured as specified in 4.4.2, the dimensions of the
15、containers shall conform to applicable drawing requirements. 3.7 Workmanship. After completion of the final assembly, the containers shall be thoroughly cleaned and all loose thread, lint, and foreign matter shall be removed. The grommets and snap fasteners shall be clinched without distortion, dama
16、ge, splitting, or cutting of the cloth, webbing or tape as applicable. The metal components shall not be misaligned nor contain any sharp edge, crack, dent, nick, burr, or sliver. The containers shall not contain any nonspecified hole, abraded area, tear, cut, mend, needle chew, spot, or stain. The
17、container assemblies shall conform to the quality and grade of product established by this specification. The occurrence of defects shall not exceed the acceptance criteria established herein. 4. VERIFICATION Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
18、HS-,-,-MILDTL81543C 5 4.1 Classification of inspection. The examination and testing of the life raft container assemblies shall be classified as follows: (a) First article inspection. First article inspection consists of examinations and tests performed on samples which are representative of the pro
19、duction item after award of a contract to determine that the production item conforms to the requirement of this specification (see 3.1, 4.2, 4.2.1, and 4.2.1.1). (b) Conformance inspection. Conformance inspection consists of examinations and tests performed on individual products or lots to determi
20、ne conformance of the products or lots with the requirements set forth in this specification (see 4.3 through 4.3.1.2). 4.2 First article inspection. The first article inspection of the inflatable life raft container assemblies shall consist of all the examinations and tests of this specification. 4
21、.2.1 First article samples. Unless otherwise specified, as soon as practicable after the award of the contract or order, the manufacturer shall submit two container assemblies of the type specified in the contract or order. The samples shall be representative of the construction, workmanship, compon
22、ents, and materials to be used during production. When a contractor is in continuous production of the type container specified, from contract to contract, submission of additional first article samples on the new contract may be waived at the discretion of the procuring activity (see 6.2). Approval
23、 of the first article inspection samples or the waiving of the first article inspection does not preclude the requirements for performing the conformance inspection. The first article inspection samples shall be furnished to the Government as directed by the contracting officer (see 6.2). 4.2.1.1 Fi
24、rst article sample disposition. Upon completion of the first article inspection, recommendations and comments pertinent for use in monitoring production will be forwarded by the Government activity responsible for the inspection program (see 6.2) to the contracting officer. One of the approved first
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILDTL81543C2010CONTAINERASSEMBLIESINFLATABLELIFERAFTPDF

链接地址:http://www.mydoc123.com/p-691086.html