DIN EN 1536-2015 Execution of special geotechnical work - Bored piles German version EN 1536 2010+A1 2015《特殊土工工作的实施 螺旋钻孔桩 德文版本EN 1536-2010+A1-2015》.pdf
《DIN EN 1536-2015 Execution of special geotechnical work - Bored piles German version EN 1536 2010+A1 2015《特殊土工工作的实施 螺旋钻孔桩 德文版本EN 1536-2010+A1-2015》.pdf》由会员分享,可在线阅读,更多相关《DIN EN 1536-2015 Execution of special geotechnical work - Bored piles German version EN 1536 2010+A1 2015《特殊土工工作的实施 螺旋钻孔桩 德文版本EN 1536-2010+A1-2015》.pdf(84页珍藏版)》请在麦多课文档分享上搜索。
1、October 2015 Translation by DIN-Sprachendienst.English price group 27No part of this translation may be reproduced without prior permission ofDIN Deutsches Institut fr Normung e. V., Berlin. Beuth Verlag GmbH, 10772 Berlin, Germany,has the exclusive right of sale for German Standards (DIN-Normen).IC
2、S 93.020!%Fm“2357458www.din.deDIN EN 1536Execution of special geotechnical work Bored piles;English version EN 1536:2010+A1:2015,English translation of DIN EN 1536:2015-10Ausfhrung von Arbeiten im Spezialtiefbau Bohrpfhle;Englische Fassung EN 1536:2010+A1:2015,Englische bersetzung von DIN EN 1536:20
3、15-10Excution des traveaux gotechniques spciaux Pieux fors;Version anglaise EN 1536:2010+A1:2015,Traduction anglaise de DIN EN 1536:2015-10SupersedesDIN EN 1536:201012www.beuth.deIn case of doubt, the German-language original shall be considered authoritative.DDocument comprises 84 pages 09.15DIN EN
4、 1536:2015-10 2 A comma is used as the decimal marker. National foreword This document (EN 1536:2010+A1:2015) has been prepared by Technical Committee CEN/TC 288 “Execution of special geotechnical works” (Secretariat: AFNOR, France). The responsible German body involved in its preparation was the DI
5、N-Normenausschuss Bauwesen (DIN Standards Committee Building and Civil Engineering), Working Committee NA 005-05-07 AA Baugrund; Pfhle (SpA zu CEN/TC 288 sowie CEN/TC 341/WG 4 und 7). Amendments This standard differs from DIN EN 1536:2010-12 as follows: a) Amendment A1:2015 has been incorporated; b)
6、 the standard has been editorially revised; c) the German translation has been revised in parts. Previous editions DIN 4014: 1960-12, 1969-11, 1990-03 DIN 4014-1: 1975-08 DIN 4014-2: 1977-09 DIN EN 1536: 1999-06, 2010-12 EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 1536:2010+A1 June 2015 ICS
7、 93.020 Supersedes EN 1536:2010English Version Execution of special geotechnical work - Bored piles Excution des travaux gotechniques spciaux - Pieux fors Ausfhrung von Arbeiten im Spezialtiefbau - Bohrpfhle This European Standard was approved by CEN on 2 July 2010 and includes Amendment 1 approved
8、by CEN on 17 April 2015. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national stand
9、ards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and no
10、tified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary,
11、Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG CEN-CENELEC M
12、anagement Centre: Avenue Marnix 17, B-1000 Brussels 2015 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 1536:2010+A1:2015 EEN 1536:2010+A1:2015 (E) 2 Contents Page Foreword 4 1 Scope 5 2 Normative references . 10 3 Terms and defin
13、itions 11 4 Information needed for the execution of the work 16 4.1 General . 16 4.2 Special features 17 5 Geotechnical investigation 18 5.1 General . 18 5.2 Specific requirements 18 6 Materials and products 19 6.1 Constituents 19 6.1.1 General . 19 6.1.2 Bentonite . 19 6.1.3 Polymers 20 6.1.4 Cemen
14、t . 20 6.1.5 Aggregates 20 6.1.6 Water 20 6.1.7 Additions . 20 6.1.8 Admixtures 20 6.2 Support fluids 20 6.2.1 Bentonite suspensions 20 6.2.2 Polymer solutions . 22 6.3 Concrete 22 6.3.1 General . 22 6.3.2 Aggregates 23 6.3.3 Cement contents . 23 6.3.4 Water/cement ratio 23 6.3.5 Admixtures 23 6.3.6
15、 Fresh concrete 23 6.3.7 Sampling and testing on site . 24 6.4 Grout 24 6.5 Reinforcement . 25 6.6 Additional inserted products . 25 7 Considerations related to design 25 7.1 General . 25 7.2 Piles forming a wall 26 7.3 Excavation . 27 7.4 Precast concrete elements 27 7.5 Reinforcement . 27 7.5.1 Ge
16、neral . 27 7.5.2 Longitudinal reinforcement . 28 7.5.3 Transverse reinforcement 28 7.6 Steel tubes and profile elements . 29 7.7 Minimum and nominal cover . 29 8 Execution . 30 8.1 Construction tolerances 30 DINEN 1536:2015-10EN 1536:2010+A1:2015 (E) 3 8.1.1 Geometrical tolerances . 30 8.1.2 Install
17、ation tolerances for reinforcement cage 31 8.1.3 Tolerances for trimming . 32 8.2 Excavation 32 8.2.1 General . 32 8.2.2 Methods and tools . 34 8.2.3 Excavations supported by casings . 34 8.2.4 Excavations supported by fluids . 36 8.2.5 Boring with continuous flight augers 36 8.2.6 Unsupported excav
18、ation. 37 8.2.7 Enlargements . 38 8.3 Reinforcement . 38 8.3.1 General . 38 8.3.2 Joints 38 8.3.3 Bending of reinforcement . 38 8.3.4 Assembly of cages 39 8.3.5 Spacers . 39 8.3.6 Installation 40 8.4 Concreting and trimming 40 8.4.1 General . 40 8.4.2 Concreting in dry conditions . 41 8.4.3 Concreti
19、ng in submerged conditions 42 8.4.4 Extraction of casings 43 8.4.5 Permanent casings or linings 44 8.4.6 Concreting of continuous flight auger piles . 44 8.4.7 Prepacked piles . 45 8.4.8 Loss of immersion of tremie pipe or casing . 45 8.4.9 Precast concrete elements and steel tubes or profiles . 46
20、8.4.10 External grouting of bored piles 46 8.4.11 Trimming 47 8.5 Pile walls 47 9 Supervision, testing and monitoring . 48 9.1 Construction controls . 48 9.2 Bored pile testing 49 9.2.1 General . 49 9.2.2 Pile load tests 49 9.2.3 Integrity tests . 50 10 Records 50 11 Special Requirements . 53 Annex
21、A (informative) Glossary 55 Annex B (informative) Examples for details and frequencies for monitoring and testing 64 Annex C (informative) Sample records . 69 Annex D (informative) Obligation of the provisions 76 Bibliography 82 DIN EN 1536:2015-10 EN 1536:2010+A1:2015 (E) 4 Foreword This document (
22、EN 1536:2010+A1:2015) has been prepared by Technical Committee CEN/TC 288 “Execution of special geotechnical works”, the secretariat of which is held by AFNOR. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at th
23、e latest by December 2015, and conflicting national standards shall be withdrawn at the latest by December 2015. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any
24、or all such patent rights. This document supersedes !EN 1536:2010“. This document includes Amendment 1 approved by CEN on 2015-04-17. The start and finish of text introduced or altered by amendment is indicated in the text by tags !“. The general scope of TC 288 is the standardisation of the executi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DINEN15362015EXECUTIONOFSPECIALGEOTECHNICALWORKBOREDPILESGERMANVERSIONEN15362010A12015 特殊 土工 工作 实施 螺旋

链接地址:http://www.mydoc123.com/p-668170.html