CLC TS 50131-7-2010 Alarm systems - Intrusion and hold-up systems - Part 7 Application guidelines《警报系统 侵入和保持系统 第7部分 应用指南》.pdf
《CLC TS 50131-7-2010 Alarm systems - Intrusion and hold-up systems - Part 7 Application guidelines《警报系统 侵入和保持系统 第7部分 应用指南》.pdf》由会员分享,可在线阅读,更多相关《CLC TS 50131-7-2010 Alarm systems - Intrusion and hold-up systems - Part 7 Application guidelines《警报系统 侵入和保持系统 第7部分 应用指南》.pdf(58页珍藏版)》请在麦多课文档分享上搜索。
1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationAlarm systems Intrusion and hold-up systemsPart 7: Application guidelinesDD CLC/TS 50131-7:2010Incorporating corrigendum March 2013National forewordThis Draft for Development is
2、the UK implementation of CLC/TS 50131-7:2010. It supersedes DD CLC/TS 50131-7:2008, which is withdrawn.This publication is not to be regarded as a British Standard.It is being issued in the Draft for Development series of publications and is of a provisional nature. It should be applied on this prov
3、isional basis, so that information and experience of its practical application can be obtained. Comments arising from the use of this Draft for Development are requested so that UK experience can be reported to the European organization responsible for its conversion to a European standard. A review
4、 of this publication will be initiated two years after its publication by the European organization so that a decision can be taken on its status. Notification of the start of the review period will be made in an announcement in the appro-priate issue of Update Standards.According to the replies rec
5、eived by the end of the review period, the re-sponsible BSI Committee will decide whether to support the conversion into a European Standard, to extend the life of the Technical Specification or to withdraw it. Comments should be sent to the Secretary of the responsible BSI Technical Committee at Br
6、itish Standards House, 389 Chiswick High Road, London W4 4AL, if it is felt that they require attention before the official call for comments.The UK participation in its preparation was entrusted to Technical Committee GW/1/2, Installed alarm systems.A list of organizations represented on this commi
7、ttee can be obtained on request to its secretary.DD CLC/TS 50131-7:2010 states in Clause 6.5 that “Persons responsible for risk assessment and the design, installation planning, system installation, maintenance and repair of I 13.320Compliance with a British Standard cannot confer immunity from lega
8、l obligations.This Draft for Development was published under the authority of the Standards Policy and Strategy Committee on 31 August 2011.Amendments/corrigenda issued since publicationDate Text affectedDRAFT FOR DEVELOPMENTDD CLC/TS 50131-7:2010Correction to additional text in national foreword31
9、March 2013TECHNICAL SPECIFICATION CLC/TS 50131-7 SPCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION July 2010 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Management Centre: Avenue Marnix
10、 17, B - 1000 Brussels 2010 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. CLC/TS 50131-7:2010 E ICS 13.310 Supersedes CLC/TS 50131-7:2008English version Alarm systems - Intrusion and hold-up systems - Part 7: Application guidelines
11、 Systmes dalarme - Systmes dalarme contre lintrusion et les hold-up - Partie 7: Guide dapplication Alarmanlagen - Einbruch- und berfallmeldeanlagen - Teil 7: Anwendungsregeln This Technical Specification was approved by CENELEC on 2010-06-25. CENELEC members are required to announce the existence of
12、 this TS in the same way as for an EN and to make the TS available promptly at national level in an appropriate form. It is permissible to keep conflicting national standards in force. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Cz
13、ech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. DD CLC/TS 50131-7:2010CLC/TS 50131-7:20
14、10 Foreword This Technical Specification was prepared by the Technical Committee CENELEC TC 79, Alarm systems. It was circulated for vote in accordance with the Internal Regulations, Part 2, Subclause 11.3.3.3 and was approved by CENELEC as CLC/TS 50131-7 on 2010-06-25 This document supersedes CLC/T
15、S 50131-7:2008. Compared to the previous edition the changes are the following: 3.1.46: note deleted; 10.2: “the test signals replaced with “these signals” in the last paragraph; 10.4: “hold-up triggering devices” replaced with “hold-up devices” in the 2ndparagraph; Annex B, B.6: “Psychological prob
16、lems of persons after robbery” deleted; Annex D, D.13: “avoid” replaced with “minimize”. The following date was fixed: latest date by which the existence of the CLC/TS has to be announced at national level (doa) 2011-01-01 The EN/TS 50131 series consists of the following parts, under the general tit
17、le Alarm systems Intrusion and hold-up systems: Part 1 System requirements Part 2-2 Intrusion detectors Passive infrared detectors Part 2-3 Requirements for microwave detectors Part 2-4 Requirements for combined passive infrared and microwave detectors Part 2-5 Requirements for combined passive infr
18、ared and ultrasonic detectors Part 2-6 Opening contacts (magnetic) Part 2-7-1 Intrusion detectors Glass break detectors (acoustics) Part 2-7-2 Intrusion detectors Glass break detectors (passive) Part 2-7-3 Intrusion detectors Glass break detectors (active) Part 2-8 1)Intrusion detectors Vibration de
19、tectors Part 2-9 1)Intrusion detectors Active infrared detectors Part 3 Control and indicating equipment Part 4 Warning devices Part 5-1 1)Requirements for wired interconnection for I a brief explanation of each section is shown below. i) Clause 7 System design This clause is intended to assist thos
20、e responsible for designing I design, installation, commissioning and hand-over should be clearly defined and agreed between the relevant parties. 6.5 Qualifications Persons responsible for risk assessment and the design, installation planning, system installation, maintenance and repair of I those
21、conditions occurring outside the supervised premises over which the user cannot reasonably be expected to exercise control. Annex E includes a list of examples of factors which should be considered, the list should not be regarded as definitive as other factors may be relevant in specific circumstan
22、ces. NOTE The location survey is intended to identify, during the preparation of the system design proposal, factors which may influence the selection and siting of system components, particularly detectors. Additional factors may be identified during the technical survey (see 8.1.3) which may resul
23、t in amendments to the system design proposal. 7.3 System design proposal A system design proposal should be prepared for submission to the client or an agent appointed by the client. The proposal should include the information detailed in Annex G. The system design proposal may be subject to altera
24、tion at other stages in the implementation of the system, e.g. during the installation planning and installation implementation stages. Any such changes should be agreed between the relevant parties and the documentation amended accordingly. 7.3.1 Selection of components Only components meeting the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CLCTS5013172010ALARMSYSTEMSINTRUSIONANDHOLDUPSYSTEMSPART7APPLICATIONGUIDELINES 警报 系统 侵入 保持 部分 应用 指南 PDF

链接地址:http://www.mydoc123.com/p-629573.html