《COE CEGS 14580-2000 PNEUMATIC-TUBE SYSTEM NOTICE 1-6 (2000) INCORPORATED SPECIAL CHANGE (2000) INCORPORATED《气送管系统 加入了1-6(2000)注意事项以及(2000)的特别变更事项》.pdf》由会员分享,可在线阅读,更多相关《COE CEGS 14580-2000 PNEUMATIC-TUBE SYSTEM NOTICE 1-6 (2000) INCORPORATED SPECIAL CHANGE (2000) INCORPORATED《气送管系统 加入了1-6(2000)注意事项以及(2000)的特别变更事项》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、TESTPDF*DEPARTMENT OF THE ARMY CEGS-14580 (March 1989)U.S. ARMY CORPS OF ENGINEERS -SupersedingCEGS-14700 (May 1988)GUIDE SPECIFICATION FOR CONSTRUCTIONIncludes changes through Notice 6 (January 2000)Includes note relocation Special change (August 1995)Includes Text Adjustment Change (Section Refere
2、nces) (November 1998)Includes Special Change (Submittal Paragraph)(June/August 2000)Latest change indicated by CHG tags*SECTION TABLE OF CONTENTSDIVISION 14 - CONVEYING SYSTEMSSECTION 14580PNEUMATIC-TUBE SYSTEM03/89PART 1 GENERAL1.1 REFERENCES1.2 ELECTRICAL WORK1.3 SUBMITTALS1.4 DESIGN REQUIREMENTS1
3、.5 GENERAL REQUIREMENTS1.5.1 Standard Products1.5.2 Verification of Dimensions1.6 DELIVERY AND STORAGEPART 2 PRODUCTS2.1 CARRIER TUBING2.1.1 Tubing2.1.2 Bends2.1.3 Fittings2.2 POWER UNITS2.3 AUTOMATIC CENTRAL-CONTROL CENTER2.3.1 Operation of the System2.3.2 Control Program2.3.3 Computer Circuits and
4、 Keyboard2.3.3.1 Cathode Ray Tube2.3.3.2 Keyboard2.3.3.3 Printer2.3.3.4 Alarm Module2.4 STORAGE AREAS2.5 AUTOMATIC SWITCHING EQUIPMENT2.6 SUBSTATION EQUIPMENT2.6.1 Receiving UnitsSECTION 14580 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TES
5、TPDF2.6.2 Sending Units2.6.3 Carrier Storage Receptacle2.6.4 Station Control Panel2.6.4.1 Operating Controls and Indicators2.6.4.2 Non-operating Requirements2.6.5 Directory2.7 CARRIERS2.7.1 Access2.7.2 Carrier Inserts2.8 SYSTEM TESTERPART 3 EXECUTION3.1 INSTALLATION3.1.1 Sound Insulation3.1.2 Hanger
6、s and Supports3.1.3 Installation of Tubing3.1.4 Firewall Penetrations3.2 PAINTING AND FINISHING3.3 ACCESS PANELS3.4 ACOUSTIC COUPLER3.5 TESTS3.6 FRAMED INSTRUCTIONS3.7 MANUFACTURERS SERVICES3.7.1 Field Training- End of Section Table of Contents -SECTION 14580 Page 2Provided by IHSNot for ResaleNo re
7、production or networking permitted without license from IHS-,-,-TESTPDF*DEPARTMENT OF THE ARMY CEGS-14580 (March 1989)U.S. ARMY CORPS OF ENGINEERS -SupersedingCEGS-14700 (May 1988)GUIDE SPECIFICATION FOR CONSTRUCTIONIncludes changes through Notice 6 (January 2000)Includes note relocation Special cha
8、nge (August 1995)Includes Text Adjustment Change (Section References) (November 1998)Includes Special Change (Submittal Paragraph)(June/August 2000)Latest change indicated by CHG tags*SECTION 14580PNEUMATIC-TUBE SYSTEM03/89*NOTE: This guide specification covers the requirements for computer controll
9、ed pneumatic tube system. This guide specification is to be used in the preparation of project specifications in accordance with ER 1110-1-8155.Comments and suggestions on this guide specification are welcome and should be directed to the proponent of the specification. A listing of proponents, incl
10、uding their organization designation and telephone number, is at URL http:/www.hnd.usace.army.mil/techinfo/index.htm, and an electronic feedback page for submission of recommended changes is available at the same address. Use of electronic communication is encouraged.*PART 1 GENERAL1.1 REFERENCES*NO
11、TE: Issue (date) of references included in project specifications need not be more current than provided by the latest change (Notice) to this guide specification.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text b
12、y basic designation only.SECTION 14580 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TESTPDFAMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)ASTM A 123/A 123M (1997ae1) Zinc (Hot-Dipped Galvanized) Coatings on Iron and Steel ProductsNATIONAL
13、ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA MG 1 (1993; Rev 1; Rev 2; Rev 3; Rev 4) Motors and GeneratorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (1999) National Electrical Code1.2 ELECTRICAL WORKElectrical motor-driven equipment specified herein shall be provided complete with motors,
14、 motor starters and controls and shall comply with NEMA MG 1. Electrical equipment and wiring shall be in accordance with Section 16415 ELECTRICAL WORK, INTERIOR. Electrical characteristics shall be as indicated. Extension to equipment from junction box and all control wiring shall be under this sec
15、tion and shall comply with NFPA 70. Motor starters shall be provided under this section complete with properly sized thermal-overload protection in each phase and other appurtenances necessary for the motor control specified. Each motor shall be sized to drive the equipment at the specified capacity
16、 without exceeding the nameplate rating of the motor when operating at proper electrical system voltage. Control and protective or signal devices required for the operation specified and wiring required for controls and devices but not shown on the electrical plans, shall be provided herein.1.3 SUBM
17、ITTALS*NOTE: Submittals must be limited to those necessary for adequate quality control. The importance of an item in the project should be one of the primary factors in determining if a submittal for the item should be required.Indicate submittal classification in the blank space following the name
18、 of the item requiring the submittal by using “G“ when the submittal requires Government approval. Submittals not classified as “G“ will show on the submittal register as “Information Only“. For submittals requiring Government approval, a code of up to three characters should be used following the “
19、G“ designation to indicate the approving authority; codes of “RE“ for Resident Engineer approval, “ED“ for Engineering approval, and “AE“ for Architect-Engineer approval are recommended.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation ar
20、e for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:SECTION 14580 Page 4Provided by IHSNot for ResaleNo reproduct
21、ion or networking permitted without license from IHS-,-,-TESTPDFSD-02 Shop DrawingsPneumatic-Tube System; _, _Detail drawings containing complete wiring and schematic diagrams and any other details required to demonstrate that the system has been coordinated and will properly function as a unit. Dra
22、wings shall show proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearance for maintenance and operation.SD-03 Product DataPneumatic-Tube System; _, _Six _ copies of design manual consisting of manufacturers standard liter
23、ature. The design manual shall identify the operational requirements for the system and explain the theory of operation, design philosophy, and specific functions. A description of hardware and software functions, interfaces, and requirements shall be included for all system operating modes. The man
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- COECEGS145802000PNEUMATICTUBESYSTEMNOTICE162000INCORPORATEDSPECIALCHANGE2000INCORPORATED 气送管 系统 加入 162000

链接地址:http://www.mydoc123.com/p-620635.html