1、Page I (old reference TICS 52-01 E) Recommendation T/S 52-01 (Copenhagen 1987) CHECK-LIST FOR OPERATION AND MAINTENANCE ASPECTS IN SPECIFICATIONS AND TENDERS Recommendation proposed by Working Group T/WG 11 “Signalling, Protocols and Switching” (SPS) Text of the Recoriimendation adopted by the “Tele
2、cornmilnicatiois” Commission : “The European Conference of Postal and Telecommunication Administrations, considering - that systems once purchased and installed must be operated and maintained for their operational life, - that the operational costs over this time tend to be equal to or greater than
3、 the initial acquisition costs, - that these costs consist mainly of operation and maintenance costs, - that it is therefore worthwhile to take these operation and maintenance costs into account when procuring new - that this subject remains the total responsibility of the Administration concerned,
4、i.e. this Recommendation will - that it is, however, recommendable to have a check-list of aspects which contribute to these operation and systems (which consideration can be at the specification stage as well as at the evaluation of tenders), not dictate what the Administration should or should not
5、 consider on this matter, maintenance costs, O recornmends the following check-list of operation and maintenance headings which can be considered when formulating specifica- tions and negotiating and evaluating tenders.” Edition of February 10, 1988 , CEPT T/S*52-03*E 87 = 2326434 OOOOL3 9 m TIC 52-
6、01 E Page 2 1. 2. 2.1. 2.2. 2.3. INTRODUCTION Systems which have been purchased and installed must be operated and maintained for their total life. The cost of this support over the life-cycle is about the same and often even more than the initial acquisition cost. An important part of these running
7、 costs are the costs for Operation and Maintenance. Therefore it is worthwhile to take aspects into account with the procurement of new systems. This can be done at two moments in the life-cycle: a) when specifying the equipment in Specification, and/or b) when asking for Tenders. In choosing new sy
8、stems it is advisable to take these aspects into account. ASPECTS IN SPECIFICATIONS In the specifications not only the required primary functions are laid down, but also the required manage- ment functions and the grade of performance of the equipment. These aspects, which contribute largely to the
9、costs, can be specified beforehand. These functions are specified for stated conditions. The following aspects can be taken into account when specifying operation or maintenance functions. It has been recognized that in some cases there are overlappings and the aspects are valid for operational as w
10、ell as for maintenance functions. It is advisable, when specifying, to follow, where possible, the CCITT and/or CEPT Recommendations. For extended definitions see T/S 10-13 “General maintenance concept and terms”. Operational aspects The implementation of operational functions should be done in such
11、 a way that they can be carried out easily and no special trained operators are required. Entering modified software in the system must preferably be possible without any effect on the operational mode of the system and of any subscriber. Any interruption must be of short duration only (e.g. not lon
12、ger than 30 minutes) and must be stated as a maximum value. Environmental conditions As the reliability of an equipment depends on its environmental conditions, these should be clearly stated in the specification. Reference to Recommendation T/TR 02-03 can be useful for this. Availability performanc
13、e Normally the “unavailability” will be defined, However this parameter not only depends on aspects for which the manufacturer is responsible (reliability performance and maintainability performance) but also on aspects for which the Administration is responsible (maintenance support performance). S
14、o, in defining the unavailability the Administration should state what assumptions have been made on their part (Maintenance Support Performance: e.g. logistic delay time, level of maintenance personnel). The unavailability can be defined e.g. by defining “partial and/or total unavailability” or by
15、introducing weighting factors and so define “cumulative unavailability”. The specification must state if the required value is relative to predicted or operational unavailability. Also the number of “restarts” or “recoveries” is important. Edition of February 10, 1988 2.4. 2.5. 2.6. 2.7. 2.8. 2.9. 2
16、.10. 2.11. 2.12. TIS 52-01 E Page 3 Reliability performance a) Failure sate This parameter gives an idea about the expected maintenance effort for the Administration. For this the “Failure rate” and the MTBF (Mean Time Between Failures) can be specified. The specification must state if the required
17、value is relative to predicted or operational failure rate. b) Amctionnl failiise sate Protection from the loss of function of an item is often provided by the use of redundant equipment including its software. However the Administrations need to know the frequency with which the function of both no
18、rmal and redundant equipment, including its software, will be lost simultaneously. The specification must state if the required value is relative to predicted or operational functional failure rate. Maintainability performance Parameters like “Detection efficiency” or “Localization efficiency” can b
19、e specified. The specification must state how these parameters will be tested (e.g. by failure simulation or in the field). Various kinds of test-programs can be required and the ability to schedule various test-programs. Furthermore operations with frequent occurrence must be easy to perform (like
20、e.g. the replacement of fuses and lamps, and adjustments). The specification must state the efficiency of fault detection at component level, attainable when adopting the repair-procedure recommended by the manufacturer. Requirements for construction and components to be used To assure the Administr
21、ation that equipment will function well for a certain period of time, requirements on components to be used and on the methods of construction must be stated. Man-Machine Language (MML) The exchange of information on operational and maintenance matters between men and machines should be specified. I
22、nterfaces The interfaces to terminals (workstations) or other intelligent management systems should be specified. Standardized consumable articles Articles to be used with the system, like paper, ink-lint, magtapes, etc., must be standardized ones. System securityylauthorization In order to protect
23、the system against unauthorized operations an authorization procedure must be required. Measurements for wrong replacements It must not be possible for interchangeable items to be put in wrong positions where they will be damaged; for this mechanical-or “paper”-keys can be used. Documentation A spec
24、ification should state what documentation should be made available and when. Preferably the documentation should be in the native language. Documentation must be structured in such a way that it is easy to read and easy to retrieve information. Edition of February 10, 1988 CEPT T/S*52-OL*E 7 = 23264
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CEPTTS5201E1987CHECKLISTFOROPERATIONANDMAINTENANCEASPECTSINSPECIFICATIONSANDTENDERS 规格 标书 操作 维护 方面 检查

链接地址:http://www.mydoc123.com/p-593286.html