CEPT NET 2 E-1988 Approval Requirements for Data Terminal Equipment to Connect to Packet Switched Public Data Networks Using CCITT Recommendation X 25 (1984) Interface (T TE 04-06E.pdf
《CEPT NET 2 E-1988 Approval Requirements for Data Terminal Equipment to Connect to Packet Switched Public Data Networks Using CCITT Recommendation X 25 (1984) Interface (T TE 04-06E.pdf》由会员分享,可在线阅读,更多相关《CEPT NET 2 E-1988 Approval Requirements for Data Terminal Equipment to Connect to Packet Switched Public Data Networks Using CCITT Recommendation X 25 (1984) Interface (T TE 04-06E.pdf(99页珍藏版)》请在麦多课文档分享上搜索。
1、CEPT NET*Z 88 2326414 0000068 O - NET 2 First edition: 1988 TRAC TECHNICAL RECOMMENDATIONS APPLICATION COMMITTEE EUROPEAN TELECOMMUNICATION STANDARD Approval requirements for data terminal equipment to connect to packet switched public data networks using CCITT Recommendation X.25 (1984) interface C
2、onditions dcigririent yoin. le raccordemetit dquipemetits termiiiniix de traitement de dorines ir im rseau public yoiir domtes ri commutntion par paquets titilismit liiiteiface cijinie dans Ia Recommnndatioii X.25 (1984) di CCITT N1 bits) 9.5.4 Extra long frame, - I) VS should be done after having w
3、aited a minimum of T1. DTE RR/F = 1 N(R) = b RR/F = 1 N(R) = b Expected behaviour from the DTE Note U Discard Discard 1) Discard Discard 11 CEPT NET*2 8 S 2326434 0000085 O I 9.6 Frame Abort should discard aborted frames. In this section the tester transmits I-frames. During this transmission the te
4、ster performs a frame abort. The DTE Test condition: The DTE shall be in the information transfer phase. Tester DTE IS: RR/P = 1 N(R) = a . i RR/F = 1 N(R) = b VS: RR/P = 1 N(R) = a RR/F = 1 N(R) = b Tests : Tester Expected behaviour acting as DCE N(R) out of sequence, aborted Discard from the DTE 9
5、.6.1 I-frame, . Note 1) 9.6.2 I - f r a m e, N(S) out of sequence, aborted Discard 1) VS should be done after having waited a minimum of T1. 9.7 or to ask the DCE to initiate a link Set-up. DTE reaction to unsolicited responses with F = X In this section, the tester transmits a response frame which
6、should cause the DTE to either initiate a link resetting, Test condition: The DTE shall be in the information transfer phase. Tester DTE IS: RR/P = 1 N(R) = a . RR/P = 1 N(R) = b Tests: Tester Expected behaviour acting as DCE from the DTE 9.7.1 UA/F = X - SABM/P = 1 9.7.2 RR/F = 1 . SABM/P = 1 9.1.3
7、 DM/F = 1 SABM/P = 1 1) Alternatively, the DTE may send DM/F = O. 9.8 Reject Procedure a REJ frame. In the third test the tester transmits a REJ; the DTE should retransmit the requested I-frames. In this section the reject procedure is tested. In the first and the second test the tester forces the D
8、TE to transmit Test condition: The DTE shall be in the information transfer phase. Tester DTE IS: RR/P = 1 N(R) = a . Tests: RR/F = 1 N(R) = b Tester Expected behaviour acting as DCE P = ON(S) = b + 3 from the DTE 9.8.1 I-frame, . REJ/F = O N(R) = b 3) I-frame 3) This test leaves the DTE in the REJ
9、condition and therefore the link must be reset prior to any subsequent test. Note CEPT NET*2 88 2326434 000008b 2 9.8.2 I-frame, L P= lN(S)=b+3 I-frame + u REJ/F = 1 N(R) = b 9.8.3 I-frame, L N(S) = bN(R) = a u RRN(R) = b + 1 I-frame N(S) = a N(R) = b + 1 I-frame, L N(S) = b + 1 N(R) = a u RRN(R) =
10、b + 2 . u I-frame N(S) = a + 1 N(R) = b + 2 I-frame N(S) = a N(R) = b + 2 I-frame N(S) = a + 1 N(R) = b + 2 REJ N(R) = a d 1) 2) 3) This frame may be omitted. The tester does not transmit an acknowledgment of the previous DTE frame. This test leaves the DTE in the REJ condition and therefore the lin
11、k must be reset prior to any subsequent test. 9.9 Flow Control second test the tester flow controls using a RNR frame. In this section the flow control mechanisms are tested. In the first test the window mechanism is used. In the Test condition: The DTE shall be in the information transfer phase. Te
12、ster DTE RR/P = 1 N(R) = a IS : a RR/F = 1 N(R) = b Tests : Tester acting as DCE Expected behaviour from the DTE Note 9.9. i This test should be done within the T1 of the DTE. T1 is started upon transmitting the first I-frame by the DTE. I-frame, N(S) = b N(R) = a I-frame, N(S) = b + 1 N(R) = a I-fr
13、ame, N(S) = b + 2 N(R) = a I-frame, N(S) = b + 3 N(R) = a I-frame, N(S) = b + 4 N(R) = a I-frame, N(S) = b + 5 N(R) = a I-frame, N(S) = b + 6 N(R) = a 1) RRN(R) = b + 1 I-frame N(S) = a N(R) = b + 1 1) RR N(R) = b + 2 I-frame N(S) = a + 1 N(R) = b + 2 1) RRN(R) = b + 3 I-frame N(S) = a + 2 N(R) = b
14、+ 3 1) RRN(R) = b + 4 I-frame N(S) = a + 3 N(R) = b + 4 . 11 RRN(R) = b + 5 I-frame N(S) = a + 4 N(R) = b + 5 1) . RR N(R) = b + 6 I-frame N(S) = a + 5 N(R) = b + 6 I) RR N(R) = b + 7 I-frame N(S) = a + 6 N(R) = b + 7 1) This frame may be omitted. . 13 NET 2 CEPT NET*Z 88 2326434 O000087 4 I-frame,
15、. N(S) = b + 7 N(R) = a RRN(R) = b + 8 The DTE should stop sending I-frames. I-frame, . RR/P = 1 L N(S) = b + 8 N(R) = a RRN(R) = b + 9 N(R) = a + 7 a RR/F = 1 N(R) = b + 9 I-frame N(S) = a + 7 N(R) = b + 9 I-frame N(S) = a + 8 N(R) = b + 9 9.9.2 RNR/P = 1 - I-frame, . I-frame, - N(R) = a RR/F = 1 N
16、(R) = b N(S) = bN(R) = a 2) a RRN(R) = b + 1 N(S) = b + 1 N(R) = a RRN(R) = b + 2 The DTE may send one I-frame but should not send the second one until the DCE ends or leaves the busy condition. RR/P = 1 . N(R) = a RR/F = 1 N(R) = b + 2 1 or 2 I-frames 1) 2) This frame may be omitted. This frame may
17、 be omitted if the DTE sends an I-frame. 9.10 Disconnected Ph-ase In this section, tests are described while the DTE and the DCE are in the Disconnected Phase. Test condition: The DTE and the DCE must be in the Disconnected Phase. Tester IS: DISC/P = 1 Tests: Tester acting as DCE DTE . UA/F = 1 or D
18、M/F = 1 Expected behaviour from the DTE 9.10.1 RR/P = 1 . DM/F = 1 9.10.2 DISC/P = 1 a DM/F = 1 9.10.3 I-frame/P = 1 - a DM/F = 1 9.1 1 Miscellaneous Tests Test condition: The DTE shall be in the information transfer phase. Tester IS : RR/P = 1 VS: RR/P = 1 Tests: Tester acting as DCE 9.11.1 RR/P =
19、1 DTE - L RR/F = 1 DM/F = I Expected behaviour from the DTE L RR/F = 1 14 NET 2 7 - Note CEPT NET*2 88 I 2326434 O000088 6 I 9.11.2 I-frame i RR I-frame/P = X DM/F = P . The DTE should enter the Disconnected Phase and may initiate link Set-up. 9.1 1.3 FRMR/F = X u L SABM/P = 1 1) VS should be done.
20、2) 3) This frame may be omitted. Alternatively, the DTE may send DM/F = O. 10 Packet Level Requirements (a) The tests in this section are designed to check that the DTE has implemented packet level in a manner acceptable for the granting of attachment approval. Compliance shail be checked by the fol
21、lowing tests as applicabe. (b) In this section tests 10.1, 10.2 and 10.3 apply to bothPVCs and SVCs. The remainder of the tests covering call setup and clearing apply only to SVCs. (c) Each packet level test consists of the following sequence of events: - an Initialisation Sequence (IS) to force the
22、 DTE into the desired test condition - performing the test sequence - observing the DTE behaviour - where the sequence terminates in a packet flowing from the tester to the DTE: a Verification Sequence (VS) to verify the DTE state It is possible that a test sequence will cause the DTE to invoke alte
23、rnative recovery and react in the following manner: - being in state rl at any time: - for LCs assigned as SVC being in any state except p6 and p7: - for LCs assigned as SVC, being in state p4, dl: discard the received packet and send a Restart Request, discard the received packet and send Clear Req
24、uest, discard the received packet and send Reset Request. These preceding actions are DTE specific error recovery actions. (d) Some of the tests given in this section may not be possible to carry out or may be inappropriate depending on the type of DTE. For instance some DTEs cannot handle Reset Ind
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CEPTNET2E1988APPROVALREQUIREMENTSFORDATATERMINALEQUIPMENTTOCONNECTTOPACKETSWITCHEDPUBLICDATANETWORKSUSINGCCITTRECOMMENDATIONX251984INTERFACETTE0406EPDF

链接地址:http://www.mydoc123.com/p-592956.html