BS ISO 4360-2008 Hydrometry - Open channel flow measurement using triangular profile weirs《液体比重测定法 使用三角形剖面堰的明渠流量的测量》.pdf
《BS ISO 4360-2008 Hydrometry - Open channel flow measurement using triangular profile weirs《液体比重测定法 使用三角形剖面堰的明渠流量的测量》.pdf》由会员分享,可在线阅读,更多相关《BS ISO 4360-2008 Hydrometry - Open channel flow measurement using triangular profile weirs《液体比重测定法 使用三角形剖面堰的明渠流量的测量》.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARDBS ISO 4360:2008Hydrometry Open channel flow measurement using triangular profile weirsICS 17.120.20g49g50g3g38g50g51g60g44g49g42g3g58g44g55g43g50g56g55g3g37g54g44g3g51g40g53g48g44g54g54g44g50g49g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g55g40g39g3g37g60g3g38g50g51g60g53g44g42g
2、43g55g3g47g36g58BS ISO 4360:2008This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 March 2008 BSI 2008ISBN 978 0 580 55141 3National forewordThis British Standard is the UK implementation of ISO 4360:2008. It supersedes BS 3680-4B:1986 which
3、is withdrawn. The UK participation in its preparation was entrusted by Technical Committee CPI/113, Hydrometry, to Subcommittee CPI/113/2, Notches, weirs and flumes.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to
4、include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.Amendments/corrigenda issued since publicationDate CommentsReference numberISO 4360:2008(E)INTERNATIONAL STANDARD ISO
5、4360Third edition2008-03-01Hydrometry Open channel flow measurement using triangular profile weirs Hydromtrie Mesure de dbit des liquides dans les canaux dcouverts au moyen de dversoirs profil triangulaire BS ISO 4360:2008ii iiiContents Page Foreword iv 1 Scope . 1 2 Normative references . 1 3 Terms
6、 and definitions. 1 4 Symbols . 1 5 Principle. 2 6 Installation . 2 6.1 General. 2 6.2 Selection of site 2 6.3 Installation conditions 3 7 Maintenance 6 8 Measurement of head(s) 6 8.1 General. 6 8.2 Location of head measurement(s) 6 8.3 Gauge wells . 6 8.4 Zero setting . 9 9 Discharge characteristic
7、s 9 9.1 Equations of discharge 9 9.2 Coefficients . 10 9.3 Limitations. 10 10 Uncertainties of flow measurement 12 10.1 General. 12 10.2 Combining measurement uncertainties . 13 10.3 Uncertainty of discharge coefficient u(Cd) for the triangular profile weir. 14 10.4 Uncertainty budget . 14 11 Exampl
8、e . 15 11.1 General. 15 11.2 Characteristics Gauging structure. 15 11.3 Characteristics Gauged head instrumentation . 15 11.4 Discharge coefficient 16 11.5 Discharge calculation. 16 11.6 Uncertainty statement 16 Annex A (informative) Introduction to measurement uncertainty. 18 Annex B (informative)
9、Sample measurement performance for use in hydrometric worked examples 26 Bibliography . 28 BS ISO 4360:2008iv Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is
10、 normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part
11、 in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to pr
12、epare International Standards. Draft International Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that
13、 some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. ISO 4360 was prepared by Technical Committee ISO/TC 113, Hydrometry, Subcommittee SC 2, Flow measurement structures. This third edition cancels
14、 and replaces the second edition (ISO 4360:1984), of which it constitutes a technical revision. BS ISO 4360:20081Hydrometry Open channel flow measurement using triangular profile weirs 1 Scope This International Standard specifies methods for the measurement of the flow of water in open channels und
15、er steady flow conditions using triangular profile weirs. The flow conditions considered are steady flows which are uniquely dependent on the upstream head and drowned flows which depend on downstream as well as upstream levels. 2 Normative references The following referenced documents are indispens
16、able for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 772, Hydrometric determinations Vocabulary and symbols 3 Terms and definitions For the purpos
17、es of this document, the terms and definitions given in ISO 772 apply. 4 Symbols A m2area of approach channel B m width of approach channel b m breadth of weir crest perpendicular to flow direction C discharge coefficient Cdcoefficient of discharge Cvcoefficient of velocity Cv f combined coefficient
18、 of velocity Em elevation of ultrasonic air range sensor above hydraulic datum f drowned flow reduction factor g m2/s acceleration due to gravity Hm total head relative to crest level hm gauged head relative to crest level (upstream head is inferred if no subscript is used) N number of measurements
19、in a set p m height of weir (difference between mean bed level and crest level) Q m3/s volumetric rate of flow ()*u percentage uncertainty in parameter v m/s mean velocity U % expanded percentage uncertainty BS ISO 4360:20082 Subscripts: 1 upstream 2 downstream c combined p measured crest tapping he
20、ad above crest level 5 Principle The discharge over a triangular profile weir is a function of the upstream head on the weir (for free flow), upstream and downstream head (for drowned flow), experimentally determined coefficients, the geometrical properties of the weir and approach channel and the d
21、ynamic properties of the water. 6 Installation 6.1 General The required conditions regarding selection of site, installation conditions, the measuring structure, the approach channel, the downstream channel, maintenance, measurement of head, and stilling or float wells which are generally necessary
22、for flow measurement are given in the following sub-clauses. 6.2 Selection of site A preliminary survey shall be made of the physical and hydraulic features of the proposed site, to check that it conforms (or can be made to conform) to the requirements necessary for accurate measurement by a weir. P
23、articular attention should be paid to the following features in selecting the site: a) availability of an adequate length of channel of regular cross-section; b) the existing velocity distribution; c) the avoidance of a steep channel, if possible; d) the effects of any increased upstream water level
24、 due to the measuring structure; e) conditions downstream including such influences as tides, confluences with other streams, sluice gates, mill dams and other controlling features which might cause submerged flow; f) the impermeability of the ground on which the structure is to be founded, and the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO43602008HYDROMETRYOPENCHANNELFLOWMEASUREMENTUSINGTRIANGULARPROFILEWEIRS 液体 比重 测定法 使用 三角形 剖面 明渠 流量

链接地址:http://www.mydoc123.com/p-587301.html