BS ISO 16699-2015 Space systems Disposal of orbital launch stages《航天系统 轨道发射阶段的处置工作》.pdf
《BS ISO 16699-2015 Space systems Disposal of orbital launch stages《航天系统 轨道发射阶段的处置工作》.pdf》由会员分享,可在线阅读,更多相关《BS ISO 16699-2015 Space systems Disposal of orbital launch stages《航天系统 轨道发射阶段的处置工作》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards PublicationBS ISO 16699:2015Space systems Disposal oforbital launch stagesBS ISO 16699:2015 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of ISO 16699:2015.The UK participation in its preparation was entrusted to TechnicalCommittee ACE/68, Space system
2、s and operations.A list of organizations represented on this committee can beobtained on request to its secretary.This publication does not purport to include all the necessaryprovisions of a contract. Users are responsible for its correctapplication. The British Standards Institution 2015.Published
3、 by BSI Standards Limited 2015ISBN 978 0 580 73124 2ICS 49.140Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and Strategy Committee on 31 December 2015.Amendments/corrigenda issued since p
4、ublicationDate T e x t a f f e c t e dBS ISO 16699:2015 ISO 2015Space systems Disposal of orbital launch stagesSystmes spatiaux limination des tages orbitaux de lanceursINTERNATIONAL STANDARDISO16699First edition2015-11-01Reference numberISO 16699:2015(E)BS ISO 16699:2015ISO 16699:2015(E)ii ISO 2015
5、 All rights reservedCOPYRIGHT PROTECTED DOCUMENT ISO 2015, Published in SwitzerlandAll rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the int
6、ernet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below or ISOs member body in the country of the requester.ISO copyright officeCh. de Blandonnet 8 CP 401CH-1214 Vernier, Geneva, SwitzerlandTel. +41 22 749 01 11Fax +41 22 749 09 47copy
7、rightiso.orgwww.iso.orgBS ISO 16699:2015ISO 16699:2015(E)Foreword ivIntroduction v1 Scope . 12 Normative references 13 Terms and definitions . 14 Abbreviated terms 25 Primary requirements 25.1 Launch provider/Payload owner coordination 25.2 Selection of disposal option . 35.3 Disposal manoeuvre plan
8、ning and documentation 35.4 Reliability for disposal 45.5 Criteria for executing disposal action 45.6 Contingency planning . 45.7 Exceptions . 46 Disposal planning requirements . 56.1 Determination whether the disposal must be a controlled manoeuvre 56.2 Estimating orbit lifetime . 56.3 Computing th
9、e time in graveyard orbit region 5Bibliography 6 ISO 2015 All rights reserved iiiContents PageBS ISO 16699:2015ISO 16699:2015(E)ForewordISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing Internati
10、onal Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with IS
11、O, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.The procedures used to develop this document and those intended for its further maintenance are described in the ISO/IEC Directives, Par
12、t 1. In particular the different approval criteria needed for the different types of ISO documents should be noted. This document was drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives).Attention is drawn to the possibility that some of the e
13、lements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of any patent rights identified during the development of the document will be in the Introduction and/or on the ISO list of patent declarations rece
14、ived (see www.iso.org/patents).Any trade name used in this document is information given for the convenience of users and does not constitute an endorsement.For an explanation on the meaning of ISO specific terms and expressions related to conformity assessment, as well as information about ISOs adh
15、erence to the WTO principles in the Technical Barriers to Trade (TBT) see the following URL: Foreword - Supplementary informationThe committee responsible for this document is ISO/TC 20, Aircraft and space vehicles, Subcommittee SC 14, Space systems and operations.iv ISO 2015 All rights reservedBS I
16、SO 16699:2015ISO 16699:2015(E)IntroductionA launch vehicle stage plays a critical role in moving a spacecraft toward or into its final mission orbit. Once the spacecraft has been delivered to the desired orbit, the stage can be separated from the spacecraft. If the stage itself is in orbit and is de
17、activated at this point, it becomes another object added to the growing population space debris an uncontrolled object that may threaten operating satellites for the remainder of the stages orbit lifetime. And a launch vehicle stage may also be a source for large numbers of smaller threatening objec
18、ts if residual propellants, pressure vessels or other sources of stored energy explode or if it is involved in a collision with another object.This International Standard in one of several standards focused on minimizing the growth of space debris, and removing orbital launch stages from orbit or mo
19、ving them to non-threatening orbits at the end of their missions is an important component of this strategy. This International Standard provides guidance on how a spacecraft owner and a launch service provider can work together to develop spacecraft deployment options leading to removal of an orbit
20、al launch stage either by re-entering the stage into the atmosphere in a short time or by leaving the stage in or moving the stage to an orbit that does not intersect regions of heavy use by satellite missions for a very long time. This International Standard also calls for eliminating all sources o
21、f stored energy remaining in the stage prior to its final disposal (except in cases where the stage will execute a controlled re-entry into the atmosphere). ISO 2015 All rights reserved vBS ISO 16699:2015BS ISO 16699:2015Space systems Disposal of orbital launch stages1 ScopeThis International Standa
22、rd focuses on disposal of launch vehicle stages used during launch of spacecraft to be operated in space where the orbital launch stages are left in orbit after the spacecraft are released.End-of-mission disposal of launch vehicle orbital stages broadly means removing the stages from the protected r
23、egions of space (see ISO 24113) so as not to collide or otherwise interfere with the other users of those protected regions in the future. ISO 24113 also requires that “During the disposal phase, a spacecraft or launch vehicle orbital stage shall permanently deplete or make safe all remaining on-boa
24、rd sources of stored energy in a controlled sequence.” These “passivation” actions are typically either accomplished in the course of disposal, or immediately follow the disposal operations. In this document, the term “disposal actions” refers to both disposal manoeuvres and to passivation actions (
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO166992015SPACESYSTEMSDISPOSALOFORBITALLAUNCHSTAGES 航天 系统 轨道 发射 阶段 处置 工作 PDF

链接地址:http://www.mydoc123.com/p-585129.html