BS EN 61557-12-2008 Electrical safety in low voltage distribution systems up to 1000 V a c and 1500 V d c Equipment for testing measuring or monitoring of protective measures Perfo.pdf
《BS EN 61557-12-2008 Electrical safety in low voltage distribution systems up to 1000 V a c and 1500 V d c Equipment for testing measuring or monitoring of protective measures Perfo.pdf》由会员分享,可在线阅读,更多相关《BS EN 61557-12-2008 Electrical safety in low voltage distribution systems up to 1000 V a c and 1500 V d c Equipment for testing measuring or monitoring of protective measures Perfo.pdf(82页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARDBS EN 61557-12:2008Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. Equipment for testing, measuring or monitoring of protective measures Part 12: Performance measuring and monitoring devices (PMD)ICS 17.220.20; 29.080.01; 29.240.01g49g50g3g38
2、g50g51g60g44g49g42g3g58g44g55g43g50g56g55g3g37g54g44g3g51g40g53g48g44g54g54g44g50g49g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g55g40g39g3g37g60g3g38g50g51g60g53g44g42g43g55g3g47g36g58BS EN 61557-12:2008This British Standard was published under the authority of the Standards Policy and Strategy
3、 Committee on 30 June 2008 BSI 2008ISISBN 978 0 580 56285 3National forewordThis British Standard is the UK implementation of EN 61557-12:2008. It is identical to IEC 61557-12:2007. The UK participation in its preparation was entrusted to Technical Committee PEL/85, Measuring equipment for electrica
4、l and electromagnetic quantities.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Stan
5、dard cannot confer immunity from legal obligations.Amendments/corrigenda issued since publicationDate CommentsEUROPEAN STANDARD EN 61557-12 NORME EUROPENNE EUROPISCHE NORM May 2008 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europis
6、ches Komitee fr Elektrotechnische Normung Central Secretariat: rue de Stassart 35, B - 1050 Brussels 2008 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61557-12:2008 E ICS 17.220.20; 29.080.01; 29.240.01 English version Electric
7、al safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 12: Performance measuring and monitoring devices (PMD) (IEC 61557-12:2007) Scurit lectrique dans les rseaux de distribution basse tension d
8、e 1 000 V c.a. et 1 500 V c.c. - Dispositifs de contrle, de mesure ou de surveillance de mesures de protection -Partie 12: Dispositifs de mesure et de surveillance des performances (PMD) (CEI 61557-12:2007) Elektrische Sicherheit in Niederspannungsnetzen bis AC 1 000 V und DC 1 500 V - Gerte zum Prf
9、en, Messen oder berwachen von Schutzmanahmen - Teil 12: Kombinierte Gerte zur Messung und berwachung des Betriebsverhaltens(IEC 61557-12:2007) This European Standard was approved by CENELEC on 2008-04-01. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate t
10、he conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member. This European Standard exis
11、ts in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions. CENELEC members are the national elect
12、rotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzer
13、land and the United Kingdom. Foreword The text of document 85/311/FDIS, future edition 1 of IEC 61557-12, prepared by IEC TC 85, Measuring equipment for electrical and electromagnetic quantities, was submitted to the IEC-CENELEC parallel vote and was approved by CENELEC as EN 61557-12 on 2008-04-01.
14、 This standard is to be used in conjunction with EN 61557-1:2007 (unless otherwise specified). The following dates were fixed: latest date by which the EN has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2009-01-01 latest date by which
15、the national standards conflicting with the EN have to be withdrawn (dow) 2011-04-01 This European Standard has been prepared under a mandate given to CENELEC by the European Commission and the European Free Trade Association and covers essential requirements of EC Directive 2004/108/EC. See Annex Z
16、Z. Annexes ZA and ZZ have been added by CENELEC. _ Endorsement notice The text of the International Standard IEC 61557-12:2007 was approved by CENELEC as a European Standard without any modification. _ BS EN 61557-12:2008 2 CONTENTS INTRODUCTION.7 1 Scope.8 2 Normative references .9 3 Terms and defi
17、nitions .10 3.1 General definitions 10 3.2 Definitions related to uncertainty and performance 11 3.3 Definitions related to electric phenomena 14 3.4 Definitions related to measurement techniques .17 3.5 Notations.17 3.5.1 Functions 17 3.5.2 Symbols and abbreviations18 3.5.3 Indices 18 4 Requirement
18、s .18 4.1 General requirements18 4.2 PMD general architecture19 4.3 Classification of PMD 19 4.4 List of applicable performance classes 20 4.4.1 List of applicable function performance classes for PMD without external sensors 20 4.4.2 List of applicable system performance classes for PMD with extern
19、al sensors 21 4.5 Operating and reference conditions for PMD .21 4.5.1 Reference conditions.21 4.5.2 Rated operating conditions 21 4.6 Start-up conditions 23 4.7 Requirements for PMD functions (except PMD-A)23 4.7.1 Active power (P) and active energy (Ea) measurements 23 4.7.2 Reactive power (QA, QV
20、) and reactive energy (ErA, ErV) measurements 28 4.7.3 Apparent power (SA, SV) and apparent energy (EapA, EapV) measurements.31 4.7.4 Frequency (f) measurements .33 4.7.5 R.m.s. phase current (I) and neutral current (IN, INc) measurements34 4.7.6 R.m.s. voltage (U) measurements39 4.7.7 Power factor
21、(PFA, PFV) measurements 39 4.7.8 Short term flicker (Pst)and long term flicker (Plt) measurements.39 4.7.9 Voltage dip (Udip) and voltage swell (Uswl) measurements .40 4.7.10 Transients overvoltage (Utr) measurements 42 4.7.11 Voltage interruption (Uint) measurements42 4.7.12 Voltage unbalance (Unb,
22、 Unba) measurements .43 4.7.13 Voltage harmonics (Uh) and voltage THD (THDuand THD-Ru) measurements.44 BS EN 61557-12:2008 3 4.7.14 Current harmonics (Ih) and current THD (THDiand THD-Ri) measurements.45 4.7.15 Minimum, maximum, peak, three-phases average and demand measurements.46 4.8 Requirements
23、for PMD-A functions46 4.9 General mechanical requirements .47 4.9.1 Vibration requirements 47 4.9.2 IP requirements .47 4.10 Safety requirements 48 4.10.1 Clearances and creepage distances 48 4.10.2 Connection of a fixed installed PMD with a current transformer .48 4.10.3 Connection of a PMD with a
24、high voltage sensor .48 4.10.4 Accessible parts 48 4.10.5 Hazardous live parts49 4.11 Analog outputs 49 4.11.1 General requirements 49 4.11.2 Compliance voltage .49 4.11.3 Analog output ripple content 49 4.11.4 Analog output response time .49 4.11.5 Limiting value of the analog output signal 49 4.11
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN61557122008ELECTRICALSAFETYINLOWVOLTAGEDISTRIBUTIONSYSTEMSUPTO1000VACAND1500VDCEQUIPMENTFORTESTINGMEASURINGORMONITORINGOFPROTECTIVEMEASURESPERFOPDF

链接地址:http://www.mydoc123.com/p-577548.html