BS EN 16601-60-2014 Space project management Cost and schedule management《航天项目管理 费用和进度管理》.pdf
《BS EN 16601-60-2014 Space project management Cost and schedule management《航天项目管理 费用和进度管理》.pdf》由会员分享,可在线阅读,更多相关《BS EN 16601-60-2014 Space project management Cost and schedule management《航天项目管理 费用和进度管理》.pdf(88页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards PublicationBS EN 16601-60:2014Space project managementPart 60: Cost and schedule managementBS EN 16601-60:2014 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 16601-60:2014.It supersedes BS EN 13290-7:2001 which is withdrawn.The UK participation in
2、 its preparation was entrusted to TechnicalCommittee ACE/68, Space systems and operations.A list of organizations represented on this committee can beobtained on request to its secretary.This publication does not purport to include all the necessaryprovisions of a contract. Users are responsible for
3、 its correctapplication. The British Standards Institution 2014. Published by BSI StandardsLimited 2014ISBN 978 0 580 83332 8ICS 49.140Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of theStandards Policy and St
4、rategy Committee on 31 August 2014.Amendments issued since publicationDate Text affectedBS EN 16601-60:2014EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 16601-60 August 2014 ICS 49.140 Supersedes EN 13290-7:2001 English version Space project management - Part 60: Cost and schedule management
5、Management des projets spatiaux - Partie 60: Matrise des cots et des dlais Raumfahrt-Projektmanagement - Teil 60: Kosten- und Zeitplanmanagement This European Standard was approved by CEN on 14 December 2013. CEN and CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which
6、 stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN and CENELEC membe
7、r. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN and CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official
8、versions. CEN and CENELEC members are the national standards bodies and national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, La
9、tvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2014 CEN/CENELEC All rights of exploitation in any form and by any means res
10、erved worldwide for CEN national Members and for CENELEC Members. Ref. No. EN 16601-60:2014 EBS EN 16601-60:2014EN 16601-60:2014 (E) 2 Table of contents Foreword 6 Introduction 7 1 Scope . 8 2 Normative references . 9 3 Terms, definitions and abbreviated terms 10 3.1 Terms from other standards 10 3.
11、2 Terms specific to the present standard . 10 3.3 Abbreviated terms . 11 4 Cost and schedule management common principles . 12 4.1 Objectives and relationships . 12 4.2 Project structure . 13 4.2.1 Work breakdown structure 13 4.2.2 Cost breakdown structure . 14 4.2.3 Business agreement Structure 14
12、4.2.4 Country/Company structure 15 4.3 Business agreement types 16 4.3.1 General 16 4.3.2 Fixed price contracts . 16 4.3.3 Cost reimbursement contracts 16 4.3.4 Ceiling price to be converted into fixed price . 17 4.4 Risk management . 17 4.4.1 General description . 17 4.4.2 Risk register 18 4.4.3 Le
13、ssons learned . 18 5 Schedule management principles . 19 5.1 Schedule definition . 19 5.1.1 General 19 5.1.2 Activities definition / Activities sequencing 19 5.1.3 Key milestones . 20 BS EN 16601-60:2014EN 16601-60:2014 (E) 3 5.1.4 Resource allocation 20 5.2 Schedule control . 20 5.2.1 Baseline sche
14、dule. 20 5.2.2 Current working schedule . 21 5.2.3 Performance evaluation 22 5.3 Schedule reporting 24 5.3.1 General 24 5.3.2 Schedule progress information . 24 5.3.3 Reporting system and tools 24 6 Cost management principles . 26 6.1 General . 26 6.2 Contractual and financial interfaces 26 6.2.1 Au
15、dited rates and cost structure . 26 6.2.2 Currency and exchange rates . 26 6.2.3 Contract change notice (CCN) 27 6.3 Cost estimating and planning 27 6.3.1 Cost estimating . 27 6.3.2 Development cost plan (DCP) 29 6.3.3 Payment plans 30 6.3.4 Price variation mechanism 30 6.3.5 Geographical distributi
16、on 31 6.3.6 Inventory control plan . 31 6.4 Cost control 31 6.4.1 Baseline cost plan. 31 6.4.2 Estimate at completion (EAC) and estimate to completion (ETC) . 32 6.4.3 Price variation . 32 6.4.4 Geographical distribution control . 33 6.4.5 Inventory control . 33 6.4.6 Financial audits . 33 6.4.7 Pay
17、ment milestone achievement 33 6.5 Cost reporting . 34 6.5.1 Reports applicable to all contract types . 34 6.5.2 Reports specific to cost reimbursement contracts . 34 7 Cost and schedule management common requirements . 35 7.1 Project structure . 35 7.1.1 Cost breakdown structure . 35 7.1.2 Business
18、agreement structure 35 BS EN 16601-60:2014EN 16601-60:2014 (E) 4 7.1.3 Country/Company structure (CCS) . 35 7.2 Risk management . 35 8 Schedule management requirements . 36 8.1 Schedule definition . 36 8.2 Schedule control . 36 8.3 Schedule reporting 37 9 Cost management requirements . 38 9.1 Contra
19、ctual and financial interfaces 38 9.1.1 Audited rates and cost structure . 38 9.1.2 Economic conditions . 38 9.1.3 Currency and exchange rates . 38 9.1.4 Contract change procedure 38 9.2 Cost estimating and planning 38 9.2.1 Cost estimating . 38 9.2.2 Project financial information 39 9.2.3 Developme
20、nt cost plan (DCP) . 39 9.2.4 Milestone payment plans 39 9.2.5 Price variation mechanism 39 9.2.6 Geographical distribution 39 9.3 Cost control 40 9.3.1 Original baseline cost plan 40 9.3.2 Current baseline cost plan 40 9.3.3 Estimate at completion (EAC) and estimate to completion (ETC) . 40 9.3.4 P
21、rice variation mechanism 41 9.3.5 Geographical distribution control . 41 9.3.6 Inventory control . 41 9.3.7 Financial audits . 41 9.3.8 Payment milestone achievement 42 9.4 Cost management reporting . 42 9.4.1 Cost and manpower report . 42 9.4.2 Inventory record 42 Bibliography . 84 Figures Figure 4
22、-1: Overall functional analysis 13 Figure 4-2: Business agreement structure example 15 BS EN 16601-60:2014EN 16601-60:2014 (E) 5 Figure 4-3: Business agreement structure schematic . 15 Figure 5-1: Gantt chart example . 22 Figure 5-2: Milestone trend chart example 23 Figure 5-3: Milestone list exampl
23、e 23 Figure A-1 : CBS 44 Tables Table Q-1 : Cost estimate method vs. project phase 79 BS EN 16601-60:2014EN 16601-60:2014 (E) 6 Foreword This document (EN 16601-60:2014) has been prepared by Technical Committee CEN/CLC/TC 5 “Space”, the secretariat of which is held by DIN. This standard (EN 16601-60
24、:2014) originates from ECSS-M-ST-60C. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by February 2015, and conflicting national standards shall be withdrawn at the latest by February 2015. Attention
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSEN16601602014SPACEPROJECTMANAGEMENTCOSTANDSCHEDULEMANAGEMENT 航天 项目 管理费用 进度 管理 PDF

链接地址:http://www.mydoc123.com/p-573962.html