1、PLANT CONSTRUCTION CONTRACTArticle 1-DefinitionsThe Owner shall mean .The Contractor shall mean .The Plant shall mean all or any part of the machinery, equipment andmaterials forming the permanent installation as specified in Appendix.The Site shall mean all the land where the plant is to be constru
2、cted in accordance with this Contract.The Works shall mean the works to be done by the Contractor under this Contract.The Contract Price shall mean the total sum payable to the Contractor by the Owner for the Works.Article 2-Contractors Responsibilities1. The Contractor shall design, engineer, and c
3、onstruct the Plant at the Site.2. The Contractor shall provide all equipment, materials, tools, facilities,labour and services necessary for the successful construction of the Plant except those items and facilities to be supplied by the Owner under Article.3. The Contractor shall perform the Works
4、in accordance with the Schedule in Appendix.4. The Contractor shall provide the Owners personnel with training of peration and maintenance of the Plant in accordance with Appendix.5. The Contractor shall supply the Owner with the spare parts specified in Appendix.6. The Contractor shall supply the O
5、wner with the maintenance equipment specified in Appendix.Article 3-Owners Responsibilities1. The Owner shall make available the Site and grant the Contractor free and uninterrupted access thereto throughout the duration of this Contract.2. The Owner shall provide those items and facilities specifie
6、d in Appendix at the time therein established.3. The Owner will obtain from the relevant Authorities those licenses and permits necessary to construct and operate the Plant on the Site including work permit for the Contractors employees.4. The Owner shall pay the contractor for the Works performed t
7、he Contract Price set out in Article.Article 4-Contract Price1. Within days after the effective date of this Contract, the Owner shall pay the Contractor as full and complete compensation for accomplishing the Works and assuming all obligations under this Contract the Contract Price in the amount of
8、 .2. The Contract Price is not subject to escalation, and the cost of executing he Works shall be the risk of the Contractor who shall be deemed to have btained all information and taken into account all circumstances which may affect the cost in agreeing the Contract Price.Article 5-Drawings1. The
9、Contractor shall submit to the Owner for approval and review within he time specified in Appendix _ such drawings as may be required for Construction of the Plant under this Contract. Within one month after receiving such drawings the Owner shall review and approve or disapprove the drawing.2. The C
10、ontractor shall be responsible for any defects, errors or omissions in the above drawings unless such defects, errors or omissions are caused by inaccurate information furnished in writing to the Contractor by the Owner.3. All drawings and technical documentation delivered by the Owner or the Contra
11、ctor to the other party shall be treated as confidential by the receiving party unless agreed otherwise, and shall not be used by that party for purposes other than those connected with this ContractArticle 6-Inspection1. The Contractor shall perform all inspection and testing of the Plant required
12、by law and normal engineering practice.2. The Owner shall be entitled at all reasonable times and at its own cost to inspect, examine and test the materials and workmanship of the Plant under construction. Such inspection, examination or testing if made shall not release the Contractor from any obli
13、gation under the Contract.3. The completed Plant shall be inspected, examined and tested by the Owner,and the Contractor shall give the Owner reasonable notice in writing of the date on which the Plant will be ready for testing.4. The Contractor shall provide such assistance, labour, materials, elec
14、tricity,fuels, apparatus, stores and instruments as may be required and as maybe reasonably demanded to carry out such tests by the Owner properly and efficiently.5. When the Plant shall have passed the above tests, the Owner shall furnish the Contractor with a certificate in writing to that effect.
15、 No Plant shall be delivered until any faults discovered during inspection are satisfactorily rectified.Article 7-Inspection1. The Contractor shall provide at the Site to the reasonable satisfaction of the Owner all materials, labour, equipment, services and facilities that may be necessary for the
16、proper execution and completion of the Works.2. Without prejudice to the generality of the above, the Contractor shall provide, as may be necessary, the following:a. Construction equipment.b. Means of transport within the Site including temporary roadways.c. Fencing, lighting and guarding and all ot
17、her materials and services necessary for the safety and security of persons and property.d. Temporary stores, offices and other buildings or structures for materials and persons engaged in the Words, including persons employed by the Owner.e. Telephones, fire-fighting equipment and first-aid equipme
18、nt until the whole Works have been taken over.f. Sanitary and canteen facilities for the use of persons engaged in the Works.3. The Contractor shall observe all safety and other regulations imposed on the Site by local laws.4. The Contractor shall at all times keep the Owners property and the adjoin
19、ing premises, driveways and streets free of construction materials and rubbish caused by the Works, and at the completion of the Works shall remove all remaining materials from and about the premises and shall leave the Site and Plant safe, clean and ready for use.Article 8-Inspection1. The Contract
20、or will supply at his own cost food, transprot and all necessary facilities for all his own personnel.2. On signing the Contract, the Contractor shall appoint a project manager who will represent the Contractor at all times be present at the Site during working hours. All communications issued by th
21、e Owner to the project manager shall be binding as if given to the Contractor.3. The Owner may request the removal and replacement of any person employed by the Contractor on the Site if such person is in the Owners opinion guilty of misconduct, incompetence or negligence.Article 9-Inspection1. The
22、Contractor shall be responsible for all losses of or damage to the Plant before final acceptance, and shall make good al such loss or damage at the cost of the Contractor and to the reasonable satisfaction of the Owner provided, however, in the case of loss or damage to the Plant arising from or occ
23、asioned by causes for which the Contractor is mot responsible under the Contract, the same shall be made good by the Contractor but at the cost of the Owner, if the Owner so directs.2. The Contractor shall indemnify the Owner in respect of all damage and in jury occurring before the issue of the fin
24、al acceptance certificate to any property and person and against al l actions, suits, claims, demands, charges and expenses arising in connection therewith which shall be occasio ned by the negligence of the Contractor or any of his sub-contractors or by defective design, materials or workmanship bu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- PLANTCONSTRUCTIONCONTRACTDOC