CONTRACT FOR PROJECT INSTALLATION.doc
《CONTRACT FOR PROJECT INSTALLATION.doc》由会员分享,可在线阅读,更多相关《CONTRACT FOR PROJECT INSTALLATION.doc(3页珍藏版)》请在麦多课文档分享上搜索。
1、CONTRACT FOR PROJECT INSTALLATIONThis Contract for project of installing Main Engine is made on_, by and between _ Company Ltd. (here- inafter called Party A) and _ Company Ltd. (hereinaftercalled Party B).1.Name of installation work: _.2.Location of installation work: Party As_in Port A.3.Scope of
2、installation work: As specified in the drawingsand statement attached.4.Time limit for completion:The installation work shall cordinate with the construction of _ in Party A, and shall be completed, including thetrial run for _, within _days after the completion of _.5.Total price of installation wo
3、rk:_U.S. D only.6.Payment terms of installation work:First installment:Party A shall pay to Party B fifteen percent of the total pricefor installation work, i.e._U.S.D only, when thiscontract comes into effect.Second installment:Party A shall pay to Party B fifteen percent of the total pricefor inst
4、alatiorn work, i.e_U. S. D. only, at the commencement of construction installation.Third installment:Party A shall pay to Party B ten percent of the total pricefor installation work, i.e._U. S. D. only, duringthe installation of pipes.Fourth installment:Party A shall pay to Party B forty percent of
5、the total pricefor installation work, i.e._U. S. D. only, at thetime when the main equipment arrives at the site.Fifth installment:Party A shall pay to Party B ten percent of the total pricefor installation work,i.e._U. S. D. only, upon comple - tion of the installation work.Sixth installment:Party
6、A shall pay to Party B ten percent of the difference of the price for installation work, i.e._U. S. D. only, after the work received has been proved qualified.7.Penalty for default:In the event Party B shall fail to complete the work in timeowing to reasons that Party B shall be held liable, Party B
7、 shallpay a penahy for such defauh based on one out of a thousand of the total price for installation work per day , i.e._U.S.D, only for each day of such default. 8.Increase or decrease of work:In case Party A has to amend,increase or decrease the working schedule, the corresponding increase or dec
8、rease of total priceshall be evaluated according to the terms and conditions betweenthe two Parties, Should the work be increased, the Parties shallenter into an agreement for the unit price of additional items. Should any part of the completed work of any part of the materi - als transported to the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CONTRACTFORPROJECTINSTALLATIONDOC