BS 6079-2-2000 Project management - Vocabulary《项目管理 词汇》.pdf
《BS 6079-2-2000 Project management - Vocabulary《项目管理 词汇》.pdf》由会员分享,可在线阅读,更多相关《BS 6079-2-2000 Project management - Vocabulary《项目管理 词汇》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | BRITISH STANDARD BS 6079-2:2000 Incorporating Corr
2、igendum No. 1 ICS 01.040.03; 03.100.50 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW Project management Part 2: VocabularyThis British Standard, having been prepared under the direction of the Management Systems Sector Committee, was published under the authority of the Stan
3、dards Committee and comes into effect on 15 March 2000 BSI 08-2000 BS 4335 first published August 1968 Second edition May 1972 Third edition April 1987 Published as BS 6079-2 March 2000 The following BSI references relate to the work on this standard: Committee reference MS/2 Draft for comment 99/40
4、2648 DC ISBN 0 580 33148 2 BS 6079-2:2000 Amendments issued since publication Amd. No. Date Comments 11015 Corrigendum No. 1 August 2000 Change of font in column 1, rows 5 and 6, of Table 2 Correction to 2.115 Committees responsible for this British Standard This British Standard was prepared by Tec
5、hnical Committee MS/2, Project management, upon which the following bodies were represented: Association of Project Managers BEAMA Ltd British Computer Society British Standards Society British Telecommunications plc Chartered Institute of Management Accountants Federation of the Electronics Industr
6、y Fellowship for Operational Research GAMBICA (BEAMA Ltd) Health and Safety Executive Highways Agency Institute of Quality Assurance Institution of Civil Engineers Institution of Incorporated Executive Engineers Institution of Mechanical Engineers Ministry of Defence Operational Research Society Roy
7、al Institution of Chartered Surveyors Society of British Aerospace Companies Ltd South Bank UniversityBS 6079-2:2000 BSI 08-2000 i Contents Page Committees responsible Inside front cover Foreword ii Introduction 1 1 Scope 1 2 Project management terminology 1 Annex A (informative) Recommended symbols
8、 used in network diagrams 14 Annex B (informative) Line of balance terminology 18 Annex C (informative) List of acronyms commonly used in project management (PM) 18 Bibliography 21 Figure 1 Hierarchy of project terms 1 Figure 2 Project management life cycle 9 Figure A.1 Finish to start 14 Figure A.2
9、 Start to start 14 Figure A.3 Finish to finish 15 Figure A.4 Start to finish 15 Figure A.5 AND 16 Figure A.6 Inclusive OR 16 Figure A.7 Exclusive OR 16 Figure A.8 AND 17 Figure A.9 Inclusive OR 17 Figure A.10 Exclusive OR 17 Table 1 Project phases 8 Table 2 Typical project phases 8ii BSI 08-2000 BS
10、6079-2:2000 Foreword The preparation of this British Standard was entrusted to Technical Committee MS/2, Project management. It is a revision of BS 4335:1987, which is withdrawn. The purpose of this British Standard is to standardize the terminology and symbols used in project management to facilita
11、te communication and the spread of knowledge of the subject. The changes made are in support of the other parts of BS 6079 which have extended the requirements for standardized terminology from the basic use in project network techniques to project management and its specialized use of other managem
12、ent techniques. Wherever possible the definitions given in BS 4335:1987 have been retained, although some have been deleted because they are no longer in use and others have been revised to reflect current usage or to improve clarity. No term has been included where its sense and usage in project ma
13、nagement are adequately defined in The Shorter Oxford English Dictionary. BS 6079 is now issued in three parts: BS 6079-1:2000, Project management Guide to project management; BS 6079-2:2000, Project management Vocabulary; BS 6079-3:2000, Project management Guide to the management of business relate
14、d project risk. Because the vocabulary now covers a much wider field it has been decided for ease of use to present the terms in alphabetic order (rather than grouped in separate specialist sections, as was the case in the 1987 edition). The three annexes to this standard contain graphical illustrat
15、ions, line of balance terminology and a list of commonly used acronyms respectively. The presentation of graphical illustrations in annex A is virtually the same as that in the 1987 edition. A British Standard does not purport to include all the necessary provisions of a contract. Users of British S
16、tandards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pages i and ii, pages 1 to 21 and a back cover. The BSI copyright notic
17、e displayed in this document indicates when the document was last issued. BSI 08-2000 1 BS 6079-2:2000 Introduction The vocabulary has been arranged alphabetically in the main body of this standard. Where applicable informative reference has been made to other publications that give further guidance
18、 on the project management and associated general management techniques defined herein. The annexes contain information on network symbols, Line of Balance terminology and a consolidated list of acronyms. 1 Scope This standard defines the terms used in project management and network planning. It has
19、 a broad relevance to projects in many industries, commerce and the public sector and was prepared in support of the other parts of BS 6079. 2 Project management terminology 2.1 abstract resource imaginary resource (2.139) introduced so that its availability and activity (2.5) requirement gives an e
20、xtra means of control NOTE For example, two jobs not being worked upon simultaneously in order to obviate an accident hazard. 2.2 acceptance criteria performance requirements and essential conditions that have to be achieved before project (2.116) deliverables (2.46) are accepted 2.3 acceptance test
21、 formal, predefined test conducted to determine the conformity of the deliverable (2.46) with the acceptance criteria (2.2) 2.4 accrued costs costs that are earmarked for the project (2.116) and for which payment is due, but has not been made 2.5 activity job operation or process (2.113) consuming t
22、ime and possibly other resources (2.139) NOTE The position of activity (2.5) within the hierarchy of project (2.116) terms is shown in Figure 1. Project 2.116 Projectlifecycle 2.122 (Projectprocess) Phase 2.107 (Stage) Task 2.170 (Workpackage) Activity 2.5 (Job) Figure 1 Hierarchy of project terms 2
23、.6 activity-on-arrow network arrow diagram network in which the arrows (2.11) symbolize the activities (2.5) 2.7 activity-on-node network precedence diagram network in which the nodes (2.99) symbolize the activities (2.5) 2.8 actual cost of work performed cumulative cost of work accrued on the proje
24、ct (2.116) in a specific period or up to a specific stage (2.165) NOTE For some purposes cost may be measured in labour hours rather than money. 2.9 actual costs incurred costs (2.78) that are charged to the project (2.116) budget (2.20) and for which payment has been made, or accrued2 BSI 08-2000 B
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS607922000PROJECTMANAGEMENTVOCABULARY 项目 管理 词汇 PDF

链接地址:http://www.mydoc123.com/p-545702.html