BS 5671-1979 Guide for commissioning operation and maintenance of hydraulic turbines《水轮机交付使用、操作与维修指南》.pdf
《BS 5671-1979 Guide for commissioning operation and maintenance of hydraulic turbines《水轮机交付使用、操作与维修指南》.pdf》由会员分享,可在线阅读,更多相关《BS 5671-1979 Guide for commissioning operation and maintenance of hydraulic turbines《水轮机交付使用、操作与维修指南》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS 5671:1979 IEC 545:1976 Guide for Commissioning, operation and maintenance of hydraulic turbines UDC 621.224.004BS5671:1979 This British Standard, having been prepared under the directionof the Mechanical Engineering Standards Committee, was published underthe authority of the Exe
2、cutive Board on 31January1979 BSI 10-1999 The following BSI references relate to the work on this standard: Committee reference MEE/125 Draft for comment78/74947 DC ISBN 0 580 10561 X Cooperating organizations The Mechanical Engineering Standards Committee, under whose direction this British Standar
3、d was prepared, consists of representatives from the following Government departments and scientific and industrial organizations: Associated Offices Technical Committee Department of the Environment Association of Consulting Engineers* Department of Trade (Marine Division) Association of Hydraulic
4、Equipment Electricity Supply Industry in England and Manufacturers Wales* Association of Mining Electrical and Engineering Equipment Users Association Mechanical Engineers Federation of Manufacturers of Construction British Compressed Air Society Equipment and Cranes British Electrical and Allied Ma
5、nufacturers Health and Safety Executive Association (BEAMA) Institution of Gas Engineers British Gas Corporation Institution of Mechanical Engineers British Gear Manufacturers Association Institution of Plant Engineers British Internal Combustion Engine Institution of Production Engineers Manufactur
6、ers Association Lloyds Register of Shipping* British Pump Manufacturers Association London Transport Executive British Steel Corporation Machine Tool Trades Association British Steel Industry Ministry of Defence British Valve Manufacturers Association National Coal Board Chartered Institution of Bui
7、lding Services Process Plant Association Crown Agents for Oversea Governments and Railway Industry Association of Great Britain Administrations Society of Motor Manufacturers and Traders Department of Industry (Mechanical Limited Engineering) Telecommunication Engineering and Department of Industry
8、(National Manufacturing Association (TEMA) Engineering Laboratory)* Water-tube Boilermakers Association The organizations marked with an asterisk in the above list, together with the following, were directly represented on the committee entrusted with the preparation of this British Standard: Instit
9、ution of Civil Engineers North of Scotland Hydro-electric Board Institution of Electrical Engineers Power Generation Association (BEAMA) Amendments issued since publication Amd. No. Date of issue CommentsBS5671:1979 BSI 10-1999 i Contents Page Cooperating organizations Inside front cover National fo
10、reword ii Chapter I. General 1 Scope and object 1 2 Terms and definitions 1 3 Data on operating conditions 2 Chapter II. Commissioning 4 General 3 5 Test co-ordinator 3 6 Pre-start tests 3 7 Initial run 4 8 Test runs 4 Chapter III. Operation 9 General 6 10 Test service period 6 11 Commercial service
11、 7 Chapter IV. Maintenance 12 General 8 13 Basis for maintenance activities 8 14 Restoration to optimum condition 9 15 Re-starting 9 Appendix Measurements 10 Figure 1 Measurements during erection horizontal unit 11 Figure 2 Measurements during erection vertical unit 12 Figure 3 Application to a reac
12、tion turbine 13BS5671:1979 ii BSI 10-1999 National foreword This British Standard was prepared under the direction of the Mechanical Engineering Standards Committee and is identical with IEC Publication545:1976 “Guide for commissioning, operation and maintenance of hydraulic turbines”. Terminology a
13、nd conventions. The text of the International Standard has been approved as suitable for publication, without deviation, as a BritishStandard. Some terminology and certain conventions are not identical with those used in British Standards; attention is especially drawn to the following. The comma ha
14、s been used as a decimal marker. In British Standards it is current practice to use a full point on the baseline as the decimal marker. Wherever page numbers are quoted in connection with references to figures in this publication they are IEC page numbers (shown in brackets at the foot of each page)
15、. Cross-references. At present there are no corresponding British Standards for the International Standards referred to. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance wit
16、h a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pages i and ii, pages1 to 14 and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated.
17、This will be indicated in the amendment table on the inside front cover.BS5671:1979 BSI 10-1999 1 Chapter I. General 1 Scope and object The purpose of this guide is to establish, in a general way, suitable procedures for commissioning hydraulic turbines and associated equipment, and to indicate how
18、such turbines and equipment should be operated and maintained. It is understood that a publication of this type will be binding only if, and to the extent that, both contracting parties have agreed upon it. The guide excludes matters of purely commercial interest, except those inextricably bound up
19、with the conduct of commissioning, operation and maintenance. The guide applies to impulse and reaction turbines of all types, and especially to large turbines directly coupled to electric generators. It applies also to pump-turbines when operating as turbines. The guide is not concerned with water
20、conduits, gates, valves, drainage pumps, cooling-water equipment, generators, etc., except where they cannot be separated from the turbine and its equipment. Wherever the guide specifies that documents, drawings or information shall be supplied by a manufacturer (or by manufacturers), each individua
21、l manufacturer shall be required to furnish the appropriate information for his own supply only. 2 Terms and definitions 2.1 commissioning testing of new equipment to check its conformity with contractual specifications, as well as operation of the equipment until formally accepted by the purchaser
22、2.2 operation utilization of the equipment to produce energy, or a state of readiness for such production 2.3 maintenance activity on the equipment directed to its conservation in a state of optimum operating condition 2.4 pre-start tests test between completion of erection of the equipment and init
23、ial run 2.5 initial run first movement of rotating parts after erection 2.6 test run operation to obtain one set of data for a specific test 2.7 test operation utilization of the equipment for testing purposes 2.8 test operation period test period following initial run and followed by test service.
24、It includes no-load runs for checking power plant equipment, as well as load runs and load rejection tests 2.9 test service operation of the equipment for an agreed period, during which the manufacturer is generally responsible for the way in which it is operated 2.10 commercial service operation of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS56711979GUIDEFORCOMMISSIONINGOPERATIONANDMAINTENANCEOFHYDRAULICTURBINES 水轮机 交付 使用 操作 维修 指南 PDF

链接地址:http://www.mydoc123.com/p-545301.html