《BS 2SP 105-1955 Specification for swaged cable-end assemblies (Unified threads) for preformed steel wire rope (W 9) for aircraft《飞行器用预成型钢丝绳(W9)挤压钢丝绳端部组件(统一螺纹)规范》.pdf》由会员分享,可在线阅读,更多相关《BS 2SP 105-1955 Specification for swaged cable-end assemblies (Unified threads) for preformed steel wire rope (W 9) for aircraft《飞行器用预成型钢丝绳(W9)挤压钢丝绳端部组件(统一螺纹)规范》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD CONFIRMED APRIL 1998 BS 2 SP 105:1955 Incorporating Amendment Nos. 1 and 3 Specification for Swaged cable-end assemblies (unified threads)* for preformed steel wire rope (W. 9) for aircraft * Assemblies with fittings incorporating B.A. and B.S.F. threads are specified in BS SP 53 an
2、d BSSP54. Assemblies suitable for use with British Standard W. 11 non-corrodible steel wire rope are specified in BS SP 106.BS2 SP 105:1955 This British Standard, having been approved by the Aircraft Industry Standards Committee and endorsed by the Chairman ofthe Engineering Divisional Council, was
3、published under theauthority of the General Council of the Institution on 29March 1955 BSI 05-2000 The following BSI references relate to the work on this standard: Committee reference ACE/14 Draft for comment CT (ACE) 6747 ISBN 0 580 34451 7 Foreword This revision of BS SP 105 has been prepared, un
4、der the authority of the Aircraft Industry Standards Committee, to provide a distinctive coding for assemblies with all-Unified threads to replace the BA/UNF assemblies, included in the first issue of the standard, following a decision to extend the range of fittings in BS SP 101BS SP 104, “Turnbarr
5、els, tension rods and swaged cable-end connections (UNF threads) for aircraft”, to include sizes withNo. 8 (0.164)32 UNC and No. 10 (0.190)32 UNF threads. In addition, the requirement in regard to the distance of the swage from the inspection hole (Figure 1) has been modified and a requirement for a
6、 magnetic flaw detection test (Clause 6) has been included in the standard. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confe
7、r immunity from legal obligations. Summary of pages This document comprises a front cover, an inside front cover, pagesi andii, pages1 to16 and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on
8、 the inside front cover. Amendments issued since publication Amd. No. Date of issue Comments 2471 May 1956 4420 January 1962 Indicated by a sideline in the marginBS2 SP105:1955 BSI 05-2000 i Contents Page Foreword Inside front cover 1 Scope 1 2 Selection of fittings 1 3 Swage form 1 4 Proof loading
9、1 5 Length of assemblies 2 6 Flaw detection 2 7 Production tests 2 8 Identification 2 9 Marking 3 10 Protective treatment 3 Figure 1 Typical swage form 1 Figure 2 Lengths of assemblies 2 Figure 3 Assembly identification 3 Table 1 Assembly loads 1 Table 2 Sizes of identification tags 3 Table 3 5 cwt
10、cable and swaged end assembly code 4 Table 4 10 cwt cable and swaged end assembly code 6 Table 5 15 cwt cable and swaged end assembly code 8 Table 6 20 cwt cable and swaged end assembly code 10 Table 7 25 cwt cable and swaged end assembly code 12 Table 8 35 cwt cable and swaged end assembly code 14
11、Table 9 45 cwt cable and swaged end assembly code 16ii blankBS2 SP105:1955 BSI 05-2000 1 1 Scope This British Standard specifies the fittings, requirements and coding for aircraft swaged cable-end assemblies incorporating Unified threadson preformed steel wire rope complying with British Standard W.
12、 9. Requirements for the locking of the assemblies are not covered by this British Standard. For this information reference should be made to the relevant publications of the appropriate airworthiness authority. The fittings comprising the assemblies, and turnbarrels and tension rods for use with th
13、em, are covered by British Standards in the aircraft series, as follows: 2 Selection of fittings The fittings comprising the swaged cable-end assemblies shall be selected in accordance with the relevant tables of this British Standard. 3 Swage form Dimensional details of individual end fittings are
14、specified in the relevant British Standards, listed in Clause 1. A typical swage form is shown in Figure 1. 4 Proof loading With the exception of assemblies 05790591, Table 3, which have an ultimate tensile value of448 lb and a proof load of 224 lb, the complete cable assembly shall be proof loaded
15、as indicated in Table 1. Table 1 Assembly loads Fittings British Standard No. Turnbarrels BS SP 101 Screwed ends BS SP 102 Tension rods BS SP 103 Tapped ends BS SP 104 Eye ends BS SP 37 Fork ends BS SP 38 Eye ends for chain BS SP 39 Ball ends with shank BS SP 49 without shank BS SP 50 Identification
16、 tags BS SP 51 and BSSP52 Cable Load for measuring length (2per cent ultimate) Proof load ( 1 / 2 ultimate) Minimum ultimate breaking load Capacity BS W. 9 Item No. cwt lb lb lb 5 4 P 11 280 560 10 5 P 22 560 1 120 15 6 P 34 840 1 680 20 3 P 45 1 120 2 240 25 51 P 56 1 400 2 800 35 52 P 78 1 960 3 9
17、20 45 53 P 100 2 520 5 040 Figure 1 Typical swage formBS2 SP 105:1955 2 BSI 05-2000 5 Length of assemblies The positions to which the cable assemblies shall be measured for length and the tolerance on length are illustrated in Figure 2. Lengths should be quoted to the nearest 1 / 4in. Except for ass
18、embled cables under 4 ft in length, which shall be measured without a tension load applied, the assembled cable shall be measured to the satisfaction of the Inspecting Authority with a tension of 1 cwt or two per cent of the ultimate load, whichever is the less, immediately after proof loading (see
19、Clause 4) and before coiling. 6 Flaw detection After proof loading, the assembly shall be examined for flaws to the satisfaction of the Inspecting Authority, by the electro-magnetic method or by any other method agreed by the Inspecting Authority. The presence of any crack shall involve rejection of
20、 the fitting. 7 Production tests Production samples of swaged cable-end assemblies or test samples typical thereof shall be periodically submitted to the following tests: a) Sectioning and critical examination of the swaged ends. b) Tensile tests to verify that the swaging does not slip and that the
21、 assembly does not fail at a load below that specified on the product or in the specification. The minimum frequency of such tests shall be as follows: i) at the beginning of manufacture on any one machine by any one operator of each size of cable; ii) during manufacture, one cable of each size in e
22、very 500 produced on any one machine by any one operator; iii) one cable of each size manufactured on any one machine by any one operator at not greater intervals than six months. 8 Identification The cable assemblies shall be identified on drawings and for coding purposes by the number of this Brit
23、ish Standard unless it is indicated in the relevant table (Table 3Table 9) that the British Standard number BS SP 53 is to be used, the appropriate code number given in the relevant table and the length of the assembly in inches, for example: A 20 cwt cable assembly with “L” length 25 3 / 4in., havi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS2SP1051955SPECIFICATIONFORSWAGEDCABLEENDASSEMBLIESUNIFIEDTHREADSFORPREFORMEDSTEELWIREROPEW9FORAIRCRAFT

链接地址:http://www.mydoc123.com/p-543483.html