ATIS 0100063-2017 NRSC Bulletin No 2017-001 DS3 Non-Simplex Outages March 2017.pdf
《ATIS 0100063-2017 NRSC Bulletin No 2017-001 DS3 Non-Simplex Outages March 2017.pdf》由会员分享,可在线阅读,更多相关《ATIS 0100063-2017 NRSC Bulletin No 2017-001 DS3 Non-Simplex Outages March 2017.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 1 NRSC Bulletin No. 2017-001 DS3 Non-Simplex Outages March 2017 Background In the December 2015 quarterly meeting of the Alliance for Telecommunications Industry Solutions (ATIS) Network Reliability Steering Committee (NRSC), the Federal Communications Commission (FCC) identified that the number of
2、 outages per month had risen dramatically. As a result of this observation, the NRSC established the Outage Increase Task Force (TF). Based on this TFs findings, the team was renamed to the DS3 Non-Simplex TF with the acceptance of NRSC Issue 33. During 2016, the NRSC DS3 TF gathered Network Outage
3、Reporting System (NORS) data from all of the NRSC members for the period between March 2015-October 2016 and conducted extensive analysis to attempt to determine if there were any underlying actionable causes to the rise in reportable outages. This Bulletin will describe the analysis and the resulti
4、ng recommendations; however, other than increased vigilance, no actionable tasks were identified. Methodology The FCC presentation to the NRSC indicated that “Hardware Failures”, “Power Failures”, and “Cable Damage” were the causes that had most increased and thus were the first focus of the analysi
5、s. The NRSC member companies initially provided March 2015-March 2016 NORS data to an independent third party for analysis. The analysis examined: null Root Cause however, a single service provider was identified to have contributed a large portion of the increase within the NRSC-only data. Further
6、analysis indicated that the identified service provider had coded the “Equipment Failed” field as “Customer DS3” in a large number of its NORS reports. An initial report detailing these findings was provided to the FCC in August 2016. At that meeting, the FCC indicated that the DS3 outages were cont
7、inuing to rise at a higher rate than had historically been seen. The NRSC continued its investigation focusing on DS3 Outages. Subsequently, the NRSC member companies provided additional NORS data for the period of March-October 2016 to the independent third party for analysis. Analysis of this data
8、 followed a similar pattern to the initial data; however, the Best Practices used were also examined. Findings While no actionable characteristic of the NORS reports were identified, there are several NRSC observations: null Technological advances have resulted in a higher number of DS3 equivalent c
9、ircuits on a single facility which has resulted in a higher number of outages becoming reportable as soon as the 30 minute threshold is met. 2 null Not all service providers include the name of the vendor on the report; however, among those that do, two vendors were observed more frequently than oth
10、ers. null The states with the highest proportion of outages generally were on the East Coast of the United States, Texas, and California (i.e., states with large populations). null One NRSC company reported a higher portion of the DS3 Non-Simplex Outage Report during this time period. Recommendation
11、s Based on the NRSCs analysis, it is recommended that service providers revisit ATIS-0100045, NRSC Bulletin No. 2009-2, DS3 Outage March 2009 and ATIS-0100038, NRSC Technical Report Analysis of Large DS3 FCC Reportable Outages. Additionally, the NRSC recommends service providers review the following
12、 Best Practices and assess the applicability of implementation to their operations: Best Practices Related to Power Failures Number Description 9-7-0496 Network Operators and Property Managers should consider storing their portable generators at critical sites that are not otherwise equipped with st
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ATIS01000632017NRSCBULLETINNO2017001DS3NONSIMPLEXOUTAGESMARCH2017PDF

链接地址:http://www.mydoc123.com/p-540868.html