ASTM E2348-2006(2010) Standard Guide for Framework for a Consensus-based Environmental Decision-making Process《基于一致同意的环境决策程序框架的标准指南》.pdf
《ASTM E2348-2006(2010) Standard Guide for Framework for a Consensus-based Environmental Decision-making Process《基于一致同意的环境决策程序框架的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2348-2006(2010) Standard Guide for Framework for a Consensus-based Environmental Decision-making Process《基于一致同意的环境决策程序框架的标准指南》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2348 06 (Reapproved 2010)Standard Guide forFramework for a Consensus-based Environmental Decision-making Process1This standard is issued under the fixed designation E2348; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revisio
2、n, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide presents a framework for a stakeholder-focused Consensus-based Environmental Decision-making
3、(CBED) process, which is a stakeholder-empowered, processto prioritize and select actions to be initiated with the goal ofoptimizing many types of environmental decisions that mayaffect a community or communities.1.2 This guide is intended to describe a highly flexibleCBED process, and therefore doe
4、s not recommend a specificcourse of action for this activity.1.3 This guide is intended to assist in implementing a CBEDprocess, which allows assessing the full impact of any project-or issue-related decisions related to human health, ecological,socio-cultural or economic impacts.21.4 This guide is
5、not intended to replace existing environ-mental decision-making or public participation processes. Itmay be used with other processes or standards that addressstakeholder involvement in environmental decision-making.1.5 LimitationsThis standard does not address the specificmethods for generating or
6、evaluating technical data related toassessing a particular environmental issues. The user shouldseek other sources on methods to gather information forcompletion of models or other analyses that may be usedduring a CBED process.2. Referenced Documents2.1 ASTM Standards:3E1739 Guide for Risk-Based Co
7、rrective Action Applied atPetroleum Release SitesE1984 Guide for Brownfields RedevelopmentE2205 Guide for Risk-Based Corrective Action for Protec-tion of Ecological Resources2.2 Other Documents:P/CCRARM (The Presidential/Congressional Commissionon Risk Assessment and Risk Management),1997a, Framewor
8、k for Environmental Health Risk Man-agement. Final Report. Volume I.4P/CCRARM (The Presidential/Congressional Commissionon Risk Assessment and Risk Management), 1997b, RiskAssessment and Risk Management in RegulatoryDecision-Making. Volume II.5Quality of Stakeholder-Based Decisions and Understanding
9、Risk640CFR, Part 1501-1506, The Quality of Stakeholder-BasedDecisions: Lessons from the Case Study Record, Re-sources for the Future710CFR Part 20, NEPA and Agency Planning; 9Standards forProtection Against Radiation,9 Subpart E, 9RadiologicalCriteria for License Termination.73. Terminology3.1 Defin
10、itions:3.1.1 affected stakeholderany individual, group, com-pany, organization, government, tribe or other entity whichmay be directly affected by or has a stake in the outcome of thespecific CBED process.3.1.2 communitya group or groups of individuals wholive or work in specific neighborhoods or re
11、gions.3.1.3 consensus-based environmental decision-making(CBED) frameworka process structure that will facilitateempowering affected stakeholders in developing a CBEDprocess.3.1.4 consensus-based environmental decision-making(CBED) processa stakeholder-empowered process to assess,prioritize and sele
12、ct actions to initiate with the goal ofoptimizing environmental decisions with respect to humanhealth, and ecological, socio-cultural, and economic impacts.1This guide is under the jurisdiction of ASTM Committee E47 on BiologicalEffects and Environmental Fate and is the direct responsibility of Subc
13、ommitteeE47.05 on Risk Assessment, Communication and Management.Current edition approved Sept. 1, 2010. Published January 2011. Originallyapproved in 2006. Last previous edition approved in 2006 as E234806.DOI:10.1520/E2348-06R10.2The CBED process is not meant to replace other processes, such as the
14、 U.S.National Environmental Policy Act (NEPA) process. The strength of the CBEDprocess is to empower the stakeholders in an organized fashion to focus on specificissues that tend to result in litigation and long delays and can be readily used inconjunction with NEPA and/or other public participation
15、 processes.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.4Available at http:/ at http:/ at: http:/www.rff.o
16、rg/Documents/RFF-DP-00-56.pdf7Available from Standardization Documents Order Desk, DODSSP, Bldg. 4,Section D, 700 Robbins Ave., Philadelphia, PA 19111-5098.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.1.5 informed consentagreeme
17、nt reached by affectedstakeholders, which is obtained by a process by which affectedstakeholders (1) are involved in a participative process thatcreates common understanding of the issues, concerns andpriorities held by all affected stakeholders; (2) assess, prioritizeand select actions to improve t
18、he problem situation; and (3)agree to trade-offs to achieve consensus on specific initiativesrelated to the CBED process.3.1.6 interested partyany individual, group, company,organization or other entity which is not an “affected stake-holder” but which is interested in the outcome of the particularC
19、BED process. Interested parties are not empowered with adecision-making role, and may participate on the StakeholderCommittee only as an observer or to provide information at thediscretion of the Stakeholder Committee.3.1.7 regulatora local, regional, state/provincial or fed-eral government agency o
20、r person employed to administratorenforce compliance with laws and regulations, which may beeither a stakeholder, a decision-maker, or an advisor to theStakeholder Committee.3.1.8 stakeholder committeethe entity empowered tomake decisions within the CBED process which is composedof representative(s)
21、 selected from each group of affectedstakeholders. Members of the Stakeholder Committee areresponsible to act as liaisons with their respective stakeholdergroups.4. Summary of Guide4.1 The Consensus-Based Environmental Decision-makingProcess is a stakeholder-empowered, community-specific pro-cess es
22、tablished to assess, prioritize and select actions toinitiate with the goal of optimizing environmental decision-making with respect to human health, ecological, socio-cultural, and economic impacts. The Stakeholder Committeemay consider issues related to environmental justice, whichrelates to the f
23、air treatment and meaningful involvement of allpeople, regardless of race, ethnicity, income, national origin oreducation level. The CBED process is an iterative processcomprised of five main steps: (1) affected stakeholder identi-fication and formation of the Stakeholder Committee; (2)information g
24、athering; (3) forecasting; (4) establishment ofinformed consent; and (5) implementation and evaluation ofinitiatives.4.2 The CBED process facilitates decision-making throughnegotiations among affected stakeholders with fairly consen-sual decision rules. An important part of the process is todetermin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME234820062010STANDARDGUIDEFORFRAMEWORKFORACONSENSUSBASEDENVIRONMENTALDECISIONMAKINGPROCESS 基于 一致同意

链接地址:http://www.mydoc123.com/p-530938.html