1、Repair of Pressure Equipmentand PipingAN AMERICAN NATIONAL STANDARDASME PCC-22015(Revision of ASME PCC-22011)ASME PCC-22015(Revision of ASME PCC-22011)Repair ofPressureEquipmentand PipingAN AMERICAN NATIONAL STANDARDTwo Park Avenue New York, NY 10016 USADate of Issuance: February 23, 2015The next ed
2、ition of this Standard is scheduled for publication in 2017.ASME issues written replies to inquiries concerning interpretations of technical aspects of thisStandard. Interpretations are published on the Committee Web page and undergo.asme.org/InterpsDatabase.Errata to codes and standards may be post
3、ed on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the date posted.The Committee Pages can be found at http:/cstools.asme.org/. There is an optio
4、n available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting “Errata” in the “PublicationInformation” section.ASME is the registered trademark of The American Society of M
5、echanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity
6、 to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprieta
7、ry device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, n
8、or assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated wit
9、h industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by indi
10、viduals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990Copyright 2015 byTHE AMERICAN SOCIETY OF MECHANICAL
11、ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTSForeword ivPreparation of Technical Inquiries vCommittee Roster . viCorrespondence With the PCC Committee viiiSummary of Changes ixPart 1 Scope, Organization, and Intent 1Part 2 Welded Repairs . 5Article 2.1 Butt-Welded Insert Plates in Pressure C
12、omponents 5Article 2.2 External Weld Buildup to Repair Internal Thinning . 11Article 2.3 Seal-Welded Threaded Connections and Seal Weld Repairs 17Article 2.4 Welded Leak Box Repair . 19Article 2.5 Welded Lip Seals (in the course of preparation) . 23Article 2.6 Full Encirclement Steel Reinforcing Sle
13、eves for Piping . 24Article 2.7 Fillet Welded Patches With Reinforcing Plug Welds . 31Article 2.8 Alternatives to Traditional Welding Preheat . 37Article 2.9 Alternatives to Postweld Heat Treatment . 43Article 2.10 In-Service Welding Onto Carbon Steel Pressure Components orPipelines 46Article 2.11 W
14、eld Buildup, Weld Overlay, and Clad Restoration . 58Article 2.12 Fillet Welded Patches 64Article 2.13 Threaded or Welded Plug Repairs 70Article 2.14 Field Heat Treating of Vessels 73Part 3 Mechanical Repairs 81Article 3.1 Replacement of Pressure Components 81Article 3.2 Freeze Plugs . 83Article 3.3
15、Damaged Threads in Tapped Holes . 88Article 3.4 Flaw Excavation and Weld Repair 98Article 3.5 Flange Repair and Conversion . 104Article 3.6 Mechanical Clamp Repair 107Article 3.7 Pipe Straightening or Alignment Bending . 112Article 3.8 Damaged Anchors in Concrete (Postinstalled Mechanical Anchors) 1
16、15Article 3.9 Valves With Pressure Seal-Type Bonnets (in the course of preparation) . 124Article 3.10 Hot Bolting (in the course of preparation) 125Article 3.11 Hot and Half Bolting Removal Procedures 126Article 3.12 Inspection and Repair of Shell and Tube Heat Exchangers . 130Part 4 Nonmetallic and
17、 Bonded Repairs . 143Article 4.1 Nonmetallic Composite Repair Systems: High-Risk Applications 143Article 4.2 Nonmetallic Composite Repair Systems: Low-Risk Applications . 181Article 4.3 Nonmetallic Internal Lining for Pipe: Sprayed Form for Buried Pipe . 195Part 5 Examination and Testing. 207Article
18、 5.1 Pressure and Tightness Testing of Piping and Equipment 207Article 5.2 Nondestructive Examination in Lieu of Pressure Testing for Repairsand Alterations 222iiiFOREWORDASME formed an Ad Hoc Task Group on Post-Construction in 1993 in response to an increasedneed for recognized and generally accept
19、ed engineering standards for the inspection and mainte-nance of pressure equipment after it has been placed in service. At the recommendation ofthis Task Group, the Board on Pressure Technology Codes and Standards (BPTCS) formed thePost-Construction Committee (PCC) in 1995. The scope of this committ
20、ee was to develop andmaintain standards addressing common issues and technologies related to post-constructionactivities and to work with other consensus committees in the development of separate, product-specific codes and standards addressing issues encountered after initial construction for equip
21、-ment and piping covered by Pressure Technology Codes and Standards. The BPTCS covers non-nuclear boilers, pressure vessels (including heat exchangers), piping and piping components,pipelines, and storage tanks.The PCC selects standards to be developed based on identified needs and the availability
22、ofvolunteers. The PCC formed the Subcommittee on Inspection Planning and the Subcommitteeon Flaw Evaluations in 1995. In 1998, a Task Group under the PCC began preparing Guidelinesfor Pressure Boundary Bolted Flange Joint Assembly. In 1999, the PCC formed the Subcommitteeon Repair and Testing. In 20
23、02, the Subcommittee on Flaw Evaluation was dissolved and replacedby the Joint ASME/API Committee on Fitness for Service. Other topics are under considerationand may be developed into future guideline documents.The subcommittees were charged with preparing standards dealing with several aspects of t
24、hein-service inspection and maintenance of pressure equipment and piping. The Inspection PlanningStandard provides guidance on the preparation of a risk-based inspection plan. Defects that areidentified are then evaluated, when appropriate, using the procedures provided in the Fitnessfor Service. Fi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEPCC22015REPAIROFPRESSUREEQUIPMENTANDPIPING 压力 设备 管道 维修 PDF

链接地址:http://www.mydoc123.com/p-456771.html