ASME B30 2 INTERPRETATIONS-2010 Interpretations to B30 2 - Overhead and Gantry Cranes (Top Running Bridge Single or Multiple Girder Top Running Trolley Hoist) (Includes Interpretat_1.pdf
《ASME B30 2 INTERPRETATIONS-2010 Interpretations to B30 2 - Overhead and Gantry Cranes (Top Running Bridge Single or Multiple Girder Top Running Trolley Hoist) (Includes Interpretat_1.pdf》由会员分享,可在线阅读,更多相关《ASME B30 2 INTERPRETATIONS-2010 Interpretations to B30 2 - Overhead and Gantry Cranes (Top Running Bridge Single or Multiple Girder Top Running Trolley Hoist) (Includes Interpretat_1.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、ASME B30.2 INTERPRETATIONSASME B30.2 INTERPRETATIONSReplies to Tecnical InquiriesSeptember 2005 Through January 2010FOREWORDThis publication includes all of the written replies issued between the indicated dates by theSecretary, speaking for the ASME B30 Committee, Safety Standard for Cableways, Cra
2、nes,Derricks, Hoists, Hooks, Jacks, and Slings, to inquiries concerning interpretations of technicalaspects of B30.2, Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder,Top Running Trolley Hoist).These replies are taken verbatim from the original letters except for a few typog
3、raphicalcorrections and some minor editorial corrections made for the purpose of improved clarity. Insome few instances, a review of the interpretation revealed a need for corrections of a technicalnature; in these cases, a corrected interpretation follows immediately after the original reply.These
4、interpretations were prepared in accordance with the accredited ASME procedures.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is available which the inquirer believes might affect the interpretation. Further,persons aggrieved by this interpreta
5、tion may appeal to the cognizant ASME Committee orSubcommittee. ASME does not “approve,” “certify,” “rate,” or “endorse” any item, construction,proprietary device, or activity.I-1ASME B30.2 INTERPRETATIONSInterpretation: 2-53Subject: ASME B30.2-2001, B30.11-1998, and B30.16-1998Date Issued: Septembe
6、r 26, 2005Background: The following statement appears in para. 2-1.14.3 of ASME B30.2, para. 11-3.2.3of ASME B30.11, and para. 16-1.2.6 of ASME B30.16.“No less than two wraps of rope shall remain on the drum at each anchorage of the hoist(ing)drum when the hook is in its extreme low position unless
7、a lower-limit device is provided, inwhich case no less than one wrap shall remain.“Question (1): When the hook is in its “extreme low position,” does this mean that the hook isat its lowest point of travel when all of the rope has been unwound, except for the requiredwraps?Reply (1): Yes.Question (2
8、): When the hook is in its “extreme low position,” does this mean that the hookmust be capable of traveling all the way to the ground with no load?Reply (2): No.Interpretation: 2-54Subject: ASME B30.2-1996, Section 2-0.2 DefinitionsDate Issued: January 20, 2006Background: The definition of crane ser
9、vice, heavy, states, “service that involves operating at 85to 100% of rated load or in excess of 10 lift cycles/hr as a regular specified procedure.“Question: Should a crane that has a rated capacity of 85 tons and performs one lift of 80 tonsan average of once per month, and also performs one lift
10、of 45 tons an average of every twoweeks, be classified heavy service based upon the definition?Reply: No. The service the crane is performing as described is in accordance with the definitionof normal service, not heavy service, as long as the crane is not handling more than one lift of 80tons an av
11、erage of once per month and a 45 ton lift an average of every two weeks.I-2ASME B30.2 INTERPRETATIONSInterpretation: 2-55Subject: ASME B30.2-2001, Paras. 2-3.2.3(a)(2) and 2-3.2.3(g)Date Issued: January 20, 2006Background: Paragraph 2-3.2.3(a)(2): The appointed person directing the lift shall ascert
12、ain thatthe load is secured, balanced, and positioned in the hook, sling or lifting device before the loadis lifted more than a few inches (millimeters).Paragraph 2-3.2.3(g): The operator shall check the hoist brake(s) at least once each shift if aload approaching the rated load is to be handled. Th
13、is shall be done by lifting the load a shortdistance and applying the brake(s).Question (1): Is the load lifted off the ground a short distance and then stopped in order tocheck the stability before proceeding with the lift, or is the procedure to tighten the rigging first,make sure the load is secu
14、re, balanced and positioned in the hook, sling or lifting device beforethe load comes off the ground and then start the lift and evaluate the loads stability as it is beinglifted and traveled down the floor?Reply (1): Paragraph 2-3.2.3(a)(2) does not require the lift to be stopped after it has been
15、raiseda few inches in order to check stability. It is a continuous process where the stability is evaluatedduring the first few inches and the lift is stopped only if a stability problem exists. Otherwisethe lift continues. In the second scenario, even though the rigging may be tight and the loadsec
16、ured, it is not always possible to determine if the load is balanced while it is still on theground.Question (2): Are the requirements in paras. 2-3.2.3(a)(2) and 2-3.2.3(g) separate and distinct?Reply (2): Yes. As stated in Reply (1), para. 2-3.2.3(a)(2) does not require that every lift bestopped.
17、Therefore, it cannot be used to satisfy the requirement of para. 2-3.2.3(g).Question (3): Can a specific or approximate distance be associated with the phrase, “liftedmore than a few inches”?Reply (3): No. It could be hazardous to try to meet a specific distance of lift in lieu of watchingthe balanc
18、e and stability of the load. Also, in many cases the crane operator is the sole individualinvolved with the lift and it would be virtually impossible for him to lift to a specific height.I-3ASME B30.2 INTERPRETATIONSInterpretation: 2-56Subject: ASME B30.2-2005, Crane Runways, Paras. 2-1.3.2, 2-1.4.3
19、, and 2-2.2.2Date Issued: September 21, 2006Question (1): Does the standard require a load test for a modified runway structure that resultsin no runway capacity increase and no crane modification or capacity rating change? An examplewould be removing a runway column and installing a two column bent
20、 resulting in a load pathchange.Reply (1): No, there is no requirement for load testing of the runway in the B30.2 volume.Question (2): Does the standard require a load test for a modified runway structure that resultsin a runway capacity increase and no crane modification or capacity rating change?
21、 An examplewould be a two-crane runway to allow a third crane to be installed on the same runway.Reply (2): No, there is no requirement for load testing of the runway in the B30.2 Volume.Interpretation: 2-57Subject: ASME B30.2-2005, Overhead and Gantry Cranes, Para. 2-1.13.5Date Issued: July 7, 2008
22、Question (1): Does the standard permit the breaker to be on the ground floor?Reply (1): Yes.Question (2): Does the standard require a breaker or switch to be on each operating floor?Reply (2): No.Question (3): Does the standard permit the breaker or switch to be on just one operating floor?Reply (3)
23、: Yes.Note: This provision is consistent with ANSI/NFPA-70, the National Electrical Code.I-4ASME B30.2 INTERPRETATIONSInterpretation: 2-58Subject: ASME B30.2-2005, Para. 2-2.1.1, Section 2-1.3, and Para. 2-2.2.1Date Issued: June 10, 2009Question (1): What are the requirements for testing the weighte
24、d upper final limit switch?Reply (1): The requirements for testing the secondary weighted upper limit switch are givenin para. 2-2.1.3(b)(10) for periodic inspection and paras. 2-2.2.1(b)(4)(a) and (b) for new, reinstalled,altered, repaired and modified cranes.Question (2): Does ASME B30.2 require t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEB302INTERPRETATIONS2010INTERPRETATIONSTOB302OVERHEADANDGANTRYCRANESTOPRUNNINGBRIDGESINGLEORMULTIPLEGIRDERTOPRUNNINGTROLLEYHOISTINCLUDESINTERPRETAT_1PDF

链接地址:http://www.mydoc123.com/p-456443.html