1、Omar Hawit is a Professional Engineer and Associate Principal at Westlake Reed Leskosky, Washington, DC. Christopher Wilson is a Professional Engineer and Senior Mechanical Engineer at Westlake Reed Leskosky, Washington, DC. Trevor Jaffe is a Professional Engineer and Mechanical Engineer at Westlake
2、 Reed Leskosky, Washington, DC. A Deeper Look at Modern Heating System Design Omar Hawit, PE Trevor Jaffe, PE Christopher Wilson, PE Member ASHRAE Member ASHRAE Member ASHRAE ABSTRACT The heating, ventilation, air conditioning, and refrigeration industry shows a trend toward increased adoption of co
3、ndensing boilers in heating systems, but the full impact on design and construction is complex. In design the selection of the boilers, heating coils, and operating temperatures play equally important roles in the composition of an efficient system. The failure to optimize design for a system as a w
4、hole can lead to wasted energy and money. This paper investigates the effect on overall system performance and construction cost of various heating system metrics with regards to condensing and non-condensing boilers. INTRODUCTION The paper studies the system wide effects of heating system efficienc
5、y with respect to boiler type and operating temperatures while weighing the first cost of system components against the energy cost of the system operation. The maximum efficiency of condensing boilers can significantly exceed that of non-condensing boilers at lower entering water temperatures. Howe
6、ver, in order to reach lower return water temperatures, coils must be properly selected. A standard coil selection exhibits a tendency to produce a smaller change in temperature with lower water temperatures. As a result, pumping energy increases due to the increased flow required to supply the same
7、 heat energy. The system efficiency and cost implications are reviewed at the component level. The impact of boiler types, air handling unit pre-heat coils, and variable volume air terminal air units is analyzed. The analysis culminates with a whole building energy simulation that provides a paramet
8、ric analysis of the multiple variables presented in system selection with respect to system energy use and costs. The modeled building was simulated in Washington, D.C. (ASHRAE Climate Zone 4A) in the parametric analysis. Then Duluth, MN (ASHRAE Climate Zone 7) and Los Angeles (ASHRAE Climate Zone 3
9、B) were compared. The paper concludes with a proposed range of operating temperatures. CONDENSING BOILER EFFICIENCY A typical 2,000 MBH (586 kW) condensing boiler was analyzed for thermal efficiency at a range of entering water temperatures and part load conditions. Entering water temperatures rangi
10、ng from 80F (27C) to 160F (71C) were used for analysis along with part load conditions ranging from 20% to 100%. A 20F (11C) temperature differential between entering water temperature and leaving water temperature was used. Temperature differential has little impact on the thermal efficiency of the
11、 boiler. The results indicate that thermal efficiency varies greatly at different entering water temperatures and part load OR-16-C012conditions. As entering water temperature decreases, thermal efficiency rises and in some cases can increase by 10% at a fixed part load. Dramatic increases in effici
12、ency do not start until entering water temperatures drop below 140F (60C), since this is when condensation starts to occur. Thermal efficiency also continues to rise as part load increases. Figure 1. Thermal efficiency shown with respect to part load operation. Non-condensing heating hot water boile
13、rs typically have efficiencies in the 80% to 85% range. At the high end of this range of efficiency the limit is driven by maintaining flue temperatures well above 130F (54C) to avoid condensation in the boiler or flue that would damage the heat exchanger. The highest achievable efficiency that can
14、occur without condensation forming inside the boiler is approximately 87%. Condensation will almost certainly occur immediately outside the boiler in the vent. This range is constrained at the low end by the ASHRAE 90.1 Energy Standard and DOE Energy Conservation Standards for Commercial Boilers. St
15、eam boilers will operate around 77%-79% thermal efficiency for similar reasons. The results show that condensing boilers can achieve far greater efficiencies over a larger operating range due to the ability to operate during condensing conditions. In addition, condensing boilers operate at even grea
16、ter efficiency at part load conditions, which is the predominant demand for a building. The control logic for operating multiple condensing boilers in the same heating plant should take advantage of increased thermal efficiency at part load conditions. While thermal efficiency and in turn energy sav
17、ings are far greater for condensing boilers, first cost should be taken into consideration. The typical 2,000 MBH (586 kW) high-efficiency condensing boiler is listed at a price range of $30,000-$34,000 while a typical non-condensing boiler of the same size and manufacturer is listed at a price of a
18、pproximately $22,000. At a glance, this appears to be an increase in first cost. However, there are several factors that equalize the actual installed cost. It is important to note that the size for these boilers typically refers to the gas input. Therefore, the condensing type boiler offers about 2
19、0% more capacity for the same listed size. Another way of stating this is that the project must purchase 20% more non-condensing boilers. In our example system discussed below, this is roughly the cost of a sixth additional boiler and the cost of the all associated appurtenances including piping spe
20、cialties for gas and water, OR-16-C012electrical power, and low voltage controls. Another major equalizer between the first cost of condensing and non-condensing boilers is the ability to increase the temperature differential, dT, in the heating hot water. A greater temperature delta reduces the flo
21、w rate, which in turn reduces the heating system pump size and system wide pipe, pipe specialty sizes, and pipe connections. These balance of system material costs compose roughly one third of the heating plant first costs, so a 10% cost reduction in sizing would yield about a $1,000 reduction in sy
22、stem cost for each boiler. When factoring in all first costs across the system for each boiler type, the cost of the condensing type boiler becomes much more comparable to that of the non-condensing boiler. AIR HANDLING UNIT PREHEAT COILS A typical medium office building load model was used to size
23、a variable volume air-handling unit serving a simulated 1st floor. The air-handling unit was sized to 10,100 CFM (17,160 CMH) supply air cooling at 55F (13C), 4,700 CFM (7,985 CMH) supply air heating at 55F (13C) heating and 2,500 CFM (4,250 CMH) outdoor air year round. The air-handling units cross-
24、sectional area and coil dimensions were sized to maintain a maximum of 500 FPM (2.5 MPS) through the coils at the cooling supply airflow rate. The heating hot water pre-heat coil was sized to heat 4,700 CFM (7,985 CMH) of mixed air (17.3F (-8.2C) outdoor air and 69.4F (20.8C) return air) to a leavin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEOR16C0122016ADEEPERLOOKATMODERNHEATINGSYSTEMDESIGNPDF

链接地址:http://www.mydoc123.com/p-455737.html