ASHRAE GUIDELINE 33-2013 Guideline for Documenting Indoor Airflow and Contaminant Transport Modeling.pdf
《ASHRAE GUIDELINE 33-2013 Guideline for Documenting Indoor Airflow and Contaminant Transport Modeling.pdf》由会员分享,可在线阅读,更多相关《ASHRAE GUIDELINE 33-2013 Guideline for Documenting Indoor Airflow and Contaminant Transport Modeling.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、ASHRAE Guideline 33-2013(Supersedes ASHRAE Guideline 33-2000)Guidelinefor DocumentingIndoor Airflowand ContaminantTransport ModelingApproved by the ASHRAE Standards Committee on June 22, 2013, and by the ASHRAE Board of Directors on June 26, 2013.ASHRAE Guidelines are scheduled to be updated on a fi
2、ve-year cycle; the date following the guideline number is the year ofASHRAE Board of Directors approval. The latest edition of an ASHRAE Guideline may be purchased on the ASHRAE website(www.ashrae.org) or from ASHRAE Customer Service, 1791 Tullie Circle, NE, Atlanta, GA 30329-2305. E-mail:ordersashr
3、ae.org. Fax: 404-321-5478. Telephone: 404-636-8400 (worldwide) or toll free 1-800-527-4723 (for orders in US andCanada). For reprint permission, go to www.ashrae.org/permissions. 2013 ASHRAE ISSN 1049-894XDISCLAIMERASHRAE uses its best efforts to promulgate Standards and Guidelines for the benefit o
4、f the public in light of available information andaccepted industry practices. However, ASHRAE does not guarantee, certify, or assure the safety or performance of any products, components,or systems tested, installed, or operated in accordance with ASHRAEs Standards or Guidelines or that any tests c
5、onducted under itsStandards or Guidelines will be nonhazardous or free from risk.ASHRAE INDUSTRIAL ADVERTISING POLICY ON STANDARDSASHRAE Standards and Guidelines are established to assist industry and the public by offering a uniform method of testing for ratingpurposes,bysuggestingsafepracticesinde
6、signingandinstallingequipment,byprovidingproperdefinitionsofthisequipment,andbyprovidingother information that may serve to guide the industry.The creation of ASHRAE Standards and Guidelines is determined by the need for them,and conformance to them is completely voluntary.In referring to this Stand
7、ard or Guideline and in marking of equipment and in advertising, no claim shall be made, either stated or implied,that the product has been approved by ASHRAE.*Denotes members of voting status when the document was approved for publicationASHRAE Guideline Project Committee 33CognizantTC:TC 4.10, Ind
8、oor Environmental ModelingSPLS Liaison: Steven J. EmmerichWilliam S. Dols, Chair* Chao-Hsin Lin*Amy B. Musser, Vice Chair* Liangzhu Wang*Julian Rimmer, Secretary* Matthew Wolski*Jason W. DeGraw* Zhiqiang Zhai*Josephine Lau*SPECIAL NOTEThis Guideline was developed under the auspices of ASHRAE. ASHRAE
9、 Guidelines are developed under a review process, identifyinga guideline for the design, testing, application, or evaluation of a specific product, concept, or practice. As a guideline it is not definitive butencompasses areas where there may be a variety of approaches, none of which must be precise
10、ly correct. ASHRAE Guidelines are writtento assist professionals in the area of concern and expertise of ASHRAEs Technical Committees and Task Groups.ASHRAE Guidelines are prepared by project committees appointed specifically for the purpose of writing Guidelines. The projectcommittee chair and vice
11、-chair must be members of ASHRAE; while other committee members may or may not be ASHRAE members, allmust be technically qualified in the subject area of the Guideline.Development of ASHRAE Guidelines follows procedures similar to those for ASHRAE Standards except that (a) committee balance isdesire
12、d but not required, (b) an effort is made to achieve consensus but consensus is not required, (c) Guidelines are not appealable, and(d) Guidelines are not submitted to ANSI for approval.The Manager of Standards of ASHRAE should be contacted for:a. interpretation of the contents of this Guideline,b.
13、participation in the next review of the Guideline,c. offering constructive criticism for improving the Guideline, ord. permission to reprint portions of the Guideline.ASHRAE STANDARDS COMMITTEE 20122013Kenneth W. Cooper, Chair Julie M. Ferguson Janice C. PetersonWilliam F. Walter, Vice-Chair Krishna
14、n Gowri Heather L. PlattDouglass S. Abramson Cecily M. Grzywacz Ira G. PostonKarim Amrane Richard L. Hall Douglas T. ReindlCharles S. Barnaby Rita M. Harrold James R. TaubyHoy R. Bohanon, Jr. Adam W. Hinge James K. VallortSteven F. Bruning Debra H. Kennoy Craig P. WrayDavid R. Conover Jay A. Kohler
15、Charles H. Culp, III, BOD ExOSteven J. Emmerich Rick A. Larson Constantinos A. Balaras, COMark P. ModeraStephanie C. Reiniche, Manager of Standards ASHRAE (www.ashrae.org). For personal use only. Additional reproduction, distribution, or transmission in either print or digital form is not permitted
16、without ASHRAEs prior written permission.CONTENTSASHRAE Guideline 33-2013,Documenting Airflow and ContaminantTransport Modeling StudiesSECTION PAGEForeword. 21 Purpose 22 Scope . 23 Definitions. 24 Project Documentation . 25 Building Description 26 Multizone Modeling Documentation . 37 CFD Modeling
17、Documentation . 48 Results 59 References . 6NOTEApproved addenda, errata, or interpretations for this guideline can be downloaded free of charge from the ASHRAEWeb site at www.ashrae.org/technology. 2013 ASHRAE1791 Tullie Circle NE Atlanta, GA 30329 www.ashrae.org All rights reserved.ASHRAE is a reg
18、istered trademark of the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. ASHRAE (www.ashrae.org). For personal use only. Additional reproduction, distribution, or transmission in either print or digital form is not permitted without ASHRAEs prior written permission.2
19、ASHRAE Guideline 33-2013(This foreword is not part of this guideline. It is merelyinformative and does not contain requirements necessaryfor conformance to the standard. It has not beenprocessed according to the ANSI requirements for aguideline and may contain material that has not beensubject to pu
20、blic review or a consensus process.Unresolved objectors on informative material are notoffered the right to appeal at ASHRAE or ANSI.)FOREWORDAirflow and contaminant transport modeling studies areperformed for a number of reasons using a wide variety ofanalysis tools and techniques. This poses a cha
21、llenge to thepractitioners as well as those who might depend on the workof said practitioners to develop, execute, present, and inter-pret such studies. This guideline is meant to provide thosewho carry out and those who commission such studies with acommon ground pertaining to the documentation of
22、thesetypes of studies. This guideline is not meant to provide anall-encompassing and restrictive set of rules but to establisha foundation upon which documentation of such studies canbe formed.1. PURPOSEThis guideline establishes a method and format for docu-menting inputs, assumptions, methods, and
23、 outputs utilizedwhen conducting indoor-airflow and contaminant-transportmodeling studies.2. SCOPEThis guideline applies to the application of airflow andcontaminant modeling for analyses of indoor air quality, ther-mal comfort, energy, and events related to chemical, biologi-cal, and radiological a
24、gents. This guideline only applies tomodeling efforts using multizone network models, computa-tional fluid dynamics (CFD), or combinations of the two.3. DEFINITIONSairflow path: a connection between two nodes of a multizonemodelthroughwhichairandcontaminantscanbetransported.analysis tool: a computer
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASHRAEGUIDELINE332013GUIDELINEFORDOCUMENTINGINDOORAIRFLOWANDCONTAMINANTTRANSPORTMODELINGPDF

链接地址:http://www.mydoc123.com/p-454889.html