1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 60 02 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 60 02 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 60 02ABOVEGROUND HEAT DIS
2、TRIBUTION SYSTEM04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 PIPING2.2.1 General2.2.2 Supply Pipe2.2.3 Condensate Return Pipes2.2.4 Drip, Vent, Relief, and Gauge Pipe2.3 FITTINGS2.
3、3.1 Threaded Fittings2.3.2 Unions2.3.3 Welding Fittings2.3.4 Pipe Threads2.4 VALVES2.4.1 General2.4.2 Bronze Valves2.4.2.1 Globe, Gate and Angle Valves2.4.2.2 Check Valves2.4.3 Steel Valves2.4.4 Packing2.5 STEAM TRAPS2.5.1 General2.5.2 Bucket Traps2.5.3 Thermostatic Traps2.6 STRAINERS2.7 ABOVEGROUND
4、 PIPE SUPPORTS2.7.1 Concrete2.7.2 SteelSECTION 33 60 02 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.7.3 Wood Poles and Lumber2.7.4 Accessories2.7.4.1 Guy Wires2.7.4.2 Anchor Rods2.7.4.3 Screw Anchors2.7.4.4 Turnbuckles2.7.4.5 Clamps2.8 IN
5、SULATION SYSTEMS2.8.1 Insulation2.8.2 Insulation Jackets2.8.2.1 Nonmetallic Jackets2.8.2.2 Aluminum Jackets2.8.3 Finishing Materials2.8.3.1 Wire2.8.3.2 Staples2.8.3.3 Insulating and Finishing Cement2.8.3.4 Glass Tape2.8.3.5 Glass Cloth2.8.4 Adhesives2.8.4.1 Mineral Fiber Insulation Cement2.8.4.2 Con
6、tact Adhesive2.8.4.3 Lagging Adhesive2.9 PIPE SLEEVESPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.2.1 Support Structures3.2.2 Piping and Valves3.2.2.1 Piping3.2.2.2 Valves3.2.3 Joints3.2.3.1 Welded Joints3.2.3.2 Threaded Joints3.2.4 Branch Connections3.2.5 Pipe Supports3.2.6 Pipe Sleeves3.3 INSU
7、LATION3.3.1 General3.3.2 Installation3.3.3 Wet Insulation3.3.3.1 Prior to Installation3.3.3.2 After Installation3.3.4 Covering of Insulation3.3.4.1 Aluminum Jacket3.3.4.2 Nonmetallic Jacket3.3.4.3 Flanges, Unions, Valves, Fittings and Accessories3.4 PIPE GUIDES AND SUPPORTS3.5 PIPE EXPANSION3.6 TEST
8、S3.6.1 General3.6.2 Cleaning of Piping3.6.3 Field Tests3.6.3.1 Hydrostatic Tests of Service Piping3.6.3.2 Equipment3.6.3.3 Operational Tests- End of Section Table of Contents -SECTION 33 60 02 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SEC
9、TION 33 60 02 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 60 02 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 60 02 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agr
10、eement with UMRL dated March 2008*SECTION 33 60 02ABOVEGROUND HEAT DISTRIBUTION SYSTEM04/08*NOTE: This guide specification covers the requirements for insulated aboveground heat distribution system (hot water systems to 216 degrees C (420 degrees F) and steam systems to 1.72 MPa (250 psig).Edit this
11、 guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and sug
12、gestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteri
13、a Change Request (CCR).*PART 1 GENERAL*NOTE: Aboveground heat distribution system should be considered for use in lieu of underground heat distribution systems due generally to longer life and lower maintenance and should be utilized wherever operations and local conditions permit.Due to the similar
14、ity of a high temperature hot water system and a steam system, no attempt was made to enclose in brackets all information which may differentiate one system from the other. In the event that only one type of distribution system is required this guide specification must be edited to SECTION 33 60 02
15、Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ensure that all information not applicable to the design is deleted. This may require that some paragraphs be deleted and others renumbered.The Contract drawings will provide the following informa
16、tion on the aboveground heat distribution system as applicable: (1) dimensions on all runs of pipe; (2) elevation of the pipe along the systems path; (3) sizes of pipes; (4) system operating temperature and pressure; (5)types of check valves used; (6) cold set dimensions of expansion loops and Z-and
17、 L-bends; (7) how changes in pipe direction are to be made; (8) any changes in pipe pitch from the usual 20 mm per 10 m (1 inch per 40 feet); (9) aboveground heat distribution system support and pipe support spacing, locations and details; and (10) other pertinent information and details required to
18、 clearly show the intent of the aboveground heat distribution system. Also indicate any obstructions in the path of the aboveground heat distribution system the Contractor may have to work around.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide spe
19、cification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the refe
20、rence in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publ
21、ications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ALLIANCE FOR TELECOMMUNICATIONS INDUSTRY SOLUTIONS (ATIS)ATIS O5.1 (2002; Supple A 2003; Supple B 2003; Supple C 2004) Specifications and D
22、imensions (for Wood Poles)SECTION 33 60 02 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-AMERICAN WOOD-PRESERVERS ASSOCIATION (AWPA)AWPA C1 (2003) All Timber Products - Preservative Treatment by Pressure ProcessesAWPA C2 (2003) Lumber, Timber
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3360022008ABOVEGROUNDHEATDISTRIBUTIONSYSTEM 地上 分配 系统 PDF

链接地址:http://www.mydoc123.com/p-449774.html