ARMY UFGS-32 11 34-2008 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE《波特兰水泥稳定基层或基层》.pdf
《ARMY UFGS-32 11 34-2008 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE《波特兰水泥稳定基层或基层》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 11 34-2008 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE《波特兰水泥稳定基层或基层》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 34 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 34 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 34PORTLAND
2、 CEMENT-STABILIZED BASE OR SUBBASE COURSE08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Portland Cement Stabilization1.1.1.2 Cement1.1.1.3 Bituminous Material1.1.1.4 Select Material1.1.2 Payment1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 DEFINITION1.4 SYSTEM DESCRIPTION1.4.1 Cen
3、tral-Plant1.4.2 Straightedge1.5 SUBMITTALS1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Cement2.1.2 Bituminous Material2.1.2.1 Cutback Asphalt2.1.2.2 Emulsified Asphalt2.1.2.3 Tar2.1.3 Material to be Stabilized2.1.4 Water2.1.5 Burlap2.1.6 Impervious Sheeting2.2 MIX DESIGN2.3 SAMPLI
4、NG AND TESTING2.3.1 Testing Facilities2.3.2 Test Results2.3.3 Aggregate2.3.4 Initial Sampling and TestingSECTION 32 11 34 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3.4.1 Laboratory Density2.3.4.2 Unconfined Compression Testing2.3.4.3 Du
5、rability Tests2.3.5 Sieve Analysis2.3.6 Liquid Limit and Plasticity Index2.3.7 Sampling and Testing During ConstructionPART 3 EXECUTION3.1 GENERAL REQUIREMENTS3.2 OPERATION OF BORROW PITS3.3 STOCKPILING MATERIALS3.4 PREPARATION OF AREA TO BE STABILIZED3.4.1 In-Place Material to be Stabilized3.4.2 In
6、-Place Materials to Receive Stabilized Course3.4.3 Select Material3.5 INSTALLATION3.5.1 Edges of Stabilized Course3.5.2 Mixed-in-Place Method3.5.2.1 Scarifying and Pulverizing of Soil3.5.2.2 Application of Cement3.5.2.3 Dry Mixing3.5.2.4 Water Application and Moist Mixing3.5.3 Central-Plant Method3.
7、5.4 Traveling-Plant Method3.5.5 Layer Thickness3.5.6 Compaction3.6 FINISHING3.7 CONSTRUCTION JOINTS3.8 CURING AND PROTECTION3.8.1 Moist Curing3.8.2 Burlap3.8.3 Impervious Sheeting3.9 BITUMINOUS MATERIAL APPLICATION3.10 FIELD QUALITY CONTROL3.10.1 Grade Control3.10.2 Smoothness Test3.10.3 Thickness C
8、ontrol3.10.4 Testing3.10.5 Field Density3.10.6 Samples of Bituminous Materials3.10.7 Maintenance3.10.8 Traffic3.11 DISPOSAL OF UNSATISFACTORY MATERIALS- End of Section Table of Contents -SECTION 32 11 34 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
9、IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 34 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 34 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 11 34PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE08/08*NOTE:
10、 This guide specification covers the requirements for portland cement-stabilized base or subbase and lean concrete bases or subbases.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert approp
11、riate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, in
12、cluding their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: In general, this specification is written for portland cement-stabilized base or subbase courses and is applicabl
13、e to lean concrete bases or subbases (also popularly known as “Econocrete“) since materials and construction procedures are similar. The lean concrete base may or may not require sawcut construction joints depending on the engineers purpose in using the base and the planned surfacing construction. G
14、enerally, all longitudinal construction joints are butt joints without keys, dowels, or tie bars.Lean concrete base differs from conventional paving concrete primarily due to lower cement contents. SECTION 32 11 34 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without li
15、cense from IHS-,-,-Sometimes a poorer quality aggregate may be used but the durability of this aggregate under the projects freezing and thawing conditions should be investigated. Other considerations such as popouts or easily polished aggregates are of less concern in a base than in a surface pavem
16、ent. Aggregate quality requirements may be relaxed for these considerations.The dividing line between a portland cement-stabilized base or subbase and lean concrete base or subbase is not clear. Generally, if the materials compressive strength is less than 10 MPa (1500 psi), the flexural strength is
17、 less than 2.5 MPa (350 psi), or the amount of material passing the 0.075 mm (No. 200) sieve is allowed to increase appreciably, it should be treated as a stabilized base or subbase rather than lean concrete base or subbase.*1.1 UNIT PRICES1.1.1 Measurement*NOTE: This paragraph will be deleted when
18、lump-sum payment is desired.Method of measurement not applicable to the job conditions will be deleted. If bituminous material is to be paid for separately, select the desired method of measurement. Reference to select material will be deleted when select material is not required from borrow areas.*
19、1.1.1.1 Portland Cement StabilizationMeasurement shall be by the square m yard of work completed and accepted.1.1.1.2 CementMeasurement shall be by the number of kg short hundred-weight (cwt) of cement used in the completed and accepted work. No measurement shall be made for wasted cement or cement
20、used in work determined defective.1.1.1.3 Bituminous MaterialBituminous material to be paid for shall be measured by the number of L gallons of the material used in the accepted work, corrected to L at 15 degrees C gallons at 60 degrees F in accordance with ASTM D 633 ASTM D 1250. A coefficient of 0
21、.00045 per degree C 0.00025 per degree F shall be used for asphalt emulsion metric 2000 pound tons of the material used in the accepted work.1.1.1.4 Select MaterialSelect material shall be measured by the cubic meter yard metric 2000 SECTION 32 11 34 Page 4Provided by IHSNot for ResaleNo reproductio
22、n or networking permitted without license from IHS-,-,-pound ton of material placed and used in the completed and accepted stabilization. No measurement will be made for select material that is wasted or used in work determined defective.1.1.2 Payment*NOTE: Paragraph will be deleted when select mate
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211342008PORTLANDCEMENTSTABILIZEDBASEORSUBBASECOURSE 波特 水泥 稳定 基层 PDF

链接地址:http://www.mydoc123.com/p-449720.html