1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 23 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 23AGGREGAT
2、E AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Area1.1.1.2 Volume1.1.1.3 Weight1.1.2 Payment for Quantities1.1.3 Payment for Stabilization of Underlying Course1.1.4 Waybills and Delivery Tickets1.2 REFERENCES1.3 DEFINITIONS1.3.1 Aggregate Base
3、 Course1.3.2 Graded-Crushed Aggregate Base Course1.3.3 Degree of Compaction1.4 SYSTEM DESCRIPTION1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Sampling1.6.2 Tests1.6.2.1 Sieve Analysis1.6.2.2 Liquid Limit and Plasticity Index1.6.2.3 Moisture-Density Determinations1.6.2.4 Field Density Tests1.6.2.5 Wear T
4、est1.6.2.6 Soundness1.6.2.7 Weight of Slag1.6.3 Testing Frequency1.6.3.1 Initial Tests1.6.3.2 In Place Tests1.6.4 Approval of Material1.7 ENVIROMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 AGGREGATESSECTION 32 11 23 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license
5、from IHS-,-,-2.1.1 Coarse Aggregate2.1.1.1 Aggregate Base Course2.1.1.2 Graded-Crushed Aggregate Base Course2.1.2 Fine Aggregate2.1.2.1 Aggregate Base Course2.1.2.2 Graded-Crushed Aggregate Base Course2.1.3 Gradation Requirements2.2 LIQUID LIMIT AND PLASTICITY INDEXPART 3 EXECUTION3.1 GENERAL REQUIR
6、EMENTS3.2 OPERATION OF AGGREGATE SOURCES3.3 STOCKPILING MATERIAL3.4 PREPARATION OF UNDERLYING COURSE3.5 INSTALLATION3.5.1 Mixing the Materials3.5.2 Placing3.5.3 Grade Control3.5.4 Edges of Base Course3.5.5 Compaction3.5.6 Thickness3.5.7 Proof Rolling3.5.8 Finishing3.5.9 Smoothness3.6 TRAFFIC3.7 MAIN
7、TENANCE3.8 DISPOSAL OF UNSATISFACTORY MATERIALS- End of Section Table of Contents -SECTION 32 11 23 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 23 (August 2008)-Preparing Activity: USACE Supersedin
8、gUFGS-32 11 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 11 23AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE08/08*NOTE: This guide specification covers the requirements for base course to be used directly under bitumino
9、us pavement courses.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets
10、 are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS sho
11、uld be submitted as a Criteria Change Request (CCR).Use of electronic communication is encouraged.*PART 1 GENERAL*NOTE: This guide specification is applicable to base courses placed directly beneath bituminous surface courses. The following must be taken into consideration when editing this specific
12、ation.a. The material in this specification and on the drawings should be referred to as “aggregate base course (ABC)“ whenever a base course material with a California Bearing Ratio (CBR) of 80 is required. “Aggregate Base Course“ should be retained in the title and the rest of the specification sh
13、ould be edited accordingly to retain the information SECTION 32 11 23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-necessary for this material.b. The material in this specification and on the drawings should be referred to as “graded-crushed
14、 aggregate base course (GCA)“ wherever a base material with a CBR of 100 is required. “Graded-Crushed Aggregate Base Course“ should be retained in the title and the rest of the specification should be edited accordingly to retain the information necessary for this material.c. When this specification
15、 is to be used in projects that require both types of materials, the title of this specification should be “Aggregate and/or Graded-Crushed Aggregate Base Course“. Care must then be taken to assure that the drawings clearly call out which material is being used in any particular place and that this
16、specification is edited to retain the information for both types of materials. If only a small amount of one of these types of materials is needed for the project, consideration should be made to determine if only one of these materials should be specified and the design adjusted.*1.1 UNIT PRICES*NO
17、TE: Delete unit price paragraphs when the work is covered by a lump-sum contract price.*1.1.1 Measurement*NOTE: Delete the method of measurement paragraph not applicable to job conditions. The provision for stockpiling should be retained or deleted, as applicable, and the brackets will be removed.*1
18、.1.1.1 AreaMeasure the quantity of ABC and GCA completed and accepted, as determined by the Contracting Officer, in square meters yards.1.1.1.2 VolumeMeasure the quantity of ABC and GCA completed and accepted, as determined by the Contracting Officer, in cubic meters yards. The volume of material in
19、-place and accepted will be determined by the average job thickness obtained in accordance with paragraph THICKNESS CONTROL and the dimensions shown.1.1.1.3 WeightThe tonnage of ABC and GCA material will be the number of metric tons tons of aggregate, placed and accepted in the completed course plus
20、 the SECTION 32 11 23 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-amount placed in authorized stockpiles, as determined by the Contracting Officer. Deductions shall be made for any material wasted, unused, rejected, or used for convenience
21、of the Contractor, and for water exceeding specified amount at time of weighing.1.1.2 Payment for QuantitiesQuantities of ABC and GCA, determined as specified above, will be paid for at the respective contract unit prices, which shall constitute full compensation for the construction and completion
22、of the ABC and GCA.1.1.3 Payment for Stabilization of Underlying CourseStabilization of cohesionless subgrade or subbase courses, as specified in paragraph PREPARATION OF UNDERLYING COURSE, will be paid for as a special item on a tonnage basis. This tonnage price will include the price of extra mani
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211232008AGGREGATEANDORGRADEDCRUSHEDAGGREGATEBASECOURSE 集料 级配碎 基层 PDF

链接地址:http://www.mydoc123.com/p-449716.html