1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 16BASE COU
2、RSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Area1.1.1.2 Volume1.1.1.3 Weight1.1.2 Payment1.1.2.1 Course Material1.1.2.2 Stabilization1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 DEFINITION1.4 SYSTEM DESCRIPTION1.5 SUBMITTALS1.6 QUA
3、LITY ASSURANCE1.6.1 Sampling1.6.2 Tests1.6.2.1 Sieve Analysis1.6.2.2 Liquid Limit and Plasticity Index1.6.2.3 Moisture-Density Determinations1.6.2.4 Field Density Tests1.6.2.5 Wear Test1.6.2.6 Weight of Slag1.6.3 Testing Frequency1.6.3.1 Initial Tests1.6.3.2 In-Place Tests1.6.4 Approval of Material1
4、.7 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Subbase Course2.1.2 Select-Material Subbase CourseSECTION 32 11 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.3 Rigid Pavement Base CoursePART 3 EXECUTION3.1 OPERATION OF A
5、GGREGATE SOURCES3.2 STOCKPILING MATERIAL3.3 PREPARATION OF UNDERLYING MATERIAL3.4 GRADE CONTROL3.5 MIXING AND PLACING MATERIALS3.6 LAYER THICKNESS3.7 COMPACTION3.8 PROOF ROLLING3.9 EDGES3.10 SMOOTHNESS TEST3.11 THICKNESS CONTROL3.12 MAINTENANCE- End of Section Table of Contents -SECTION 32 11 16 Pag
6、e 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL
7、 dated July 2008*SECTION 32 11 16BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING08/08*NOTE: This guide specification covers the requirements for subbase, select-material subbase and rigid base courses for airfield pavements, roads and streets.Edit this guide specification for project specific
8、 requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are
9、welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NO
10、TE: This guide specification is applicable to subbase courses for airfield pavements, roads and streets including select-material subbase courses in the lower levels of the pavement structure. This specification will be used for any subbase course that has a design California bearing ratio (CBR) bet
11、ween 20 and 50 or any select-material with design CBR less than 20. Select material subbase will not require processing or blending.This specification may also be used for:SECTION 32 11 16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a. The
12、base course directly beneath the bituminous surface of a pavement design for Class E and F roads and streets where the required CBR value of the material is 50 or more and the material conforms to Gradation No. 1.b. The base course beneath rigid pavements.When this guide specification is used for ag
13、gregate base course under rigid pavement, section title of the project specification will be: BASE COURSE FOR RIGID PAVING and the words “rigid pavement base course“ selected throughout. When this guide specification is used in combination for a subbase course under flexible pavements and a base cou
14、rse under rigid pavements, the section title will be: BASE COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE PAVING and the words “or rigid pavement base course“ will be included after “subbase“ throughout.*1.1 UNIT PRICES*NOTE: Delete unit price paragraphs when the work is covered by a lump-sum contract p
15、rice.*1.1.1 Measurement*NOTE: Delete the method of measurement paragraph not applicable to job conditions. The provision for placing in stockpiles will be retained or deleted as applicable.*1.1.1.1 AreaMeasure the quantity of subbase and select-material subbase or rigid pavement base course complete
16、d and accepted, as determined by the Contracting Officer, in square meters yards.1.1.1.2 VolumeMeasure the quantity of subbase and select-material subbase or rigid pavement base course completed and accepted, as determined by the Contracting Officer, in cubic meters yards. Determine the volume of ma
17、terial in-place and accepted by the average job thickness obtained in accordance with paragraph THICKNESS CONTROL and the dimensions shown.1.1.1.3 WeightThe tonnage of subbase and select-material subbase or rigid pavement base course material will be the number of metric tons tons of aggregate, plac
18、ed and accepted in the completed course in authorized stockpiles as determined by the Contracting Officer. Deductions will be made for any material wasted, unused, rejected, or used for convenience of the Contractor, and for water exceeding specified amount at time of SECTION 32 11 16 Page 4Provided
19、 by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-weighing.1.1.2 Payment1.1.2.1 Course MaterialQuantities of subbase and select-material subbase or rigid pavement base course, determined as specified in paragraph Measurement, will be paid for at the respective
20、 contract unit prices, which will constitute full compensation for the construction and completion of the subbase and select-material subbase or rigid pavement base course.1.1.2.2 StabilizationCohesionless subgrades or select subbase courses to be stabilized, as specified in paragraph PREPARATION OF
21、 UNDERLYING MATERIAL, will be paid as a special item on the tonnage basis including extra manipulation as required.1.1.3 Waybills and Delivery TicketsSubmit copies of waybills and delivery tickets during the progress of the work.1.2 REFERENCES*NOTE: This paragraph is used to list the publications ci
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211162008BASECOURSEFORRIGIDANDSUBBASESFORFLEXIBLEPAVING 刚性 路面 基层 柔性 基底 PDF

链接地址:http://www.mydoc123.com/p-449715.html