ARMY UFGS-32 11 10-2008 DRAINAGE LAYER《排水层》.pdf
《ARMY UFGS-32 11 10-2008 DRAINAGE LAYER《排水层》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 11 10-2008 DRAINAGE LAYER《排水层》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 10 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 11 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 11 10DRAINAGE
2、 LAYER08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Aggregate Drainage Layer Material1.1.1.2 Bituminous or Cement Stabilized Drainage Layer1.1.1.3 Bituminous Material1.1.1.4 Cementitious Material1.1.2 Payment1.1.3 Waybills and Delivery Tickets1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Eq
3、uipment1.3.2 Placement Equipment1.3.3 Compaction Equipment1.3.4 Bituminous Mixing Plant1.3.5 Cementitious Mixing Plant1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Sampling and Testing1.5.2 Sampling1.5.3 Test Methods1.5.3.1 Sieve Analyses1.5.3.2 Density Tests1.5.3.3 Soundness Test1.5.3.4 Los Angeles Abra
4、sion Test1.5.3.5 Flat or Elongated Particles Tests1.5.3.6 Fractured Faces Tests1.5.3.7 Bitumen Extraction1.5.4 Initial Tests1.5.5 Testing Frequency1.5.5.1 Aggregate Layer1.5.5.2 Stabilized Layer1.5.6 Approval of Materials1.5.6.1 Aggregate1.5.6.2 Bituminous or Cementitious MaterialsSECTION 32 11 10 P
5、age 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 GOVERNMENT APPROVAL2.2 AGGREGATES2.2.1 Aggregate Quality2.2.2 Gradation Requirements2.3 BITUMINOUS MATERIALS2.4 CEMENTITIOUS MATERIALS2.5 BITUMINOUS
6、 OR CEMENT STABILIZED JOB-MIX FORMULAPART 3 EXECUTION3.1 STOCKPILING AGGREGATES3.2 TEST SECTION3.2.1 Data3.2.2 Scheduling3.2.3 Location and Size3.2.4 Initial Testing3.2.5 Mixing, Placement, and Compaction3.2.6 Procedure3.2.6.1 RDM Aggregate Drainage Layer Tests3.2.6.2 Bituminous/Cement Stabilized Dr
7、ainage Layer3.2.6.3 OGM with Choke Stone3.2.7 Evaluation3.3 PREPARATION OF UNDERLYING COURSE3.4 TRANSPORTING MATERIAL3.4.1 Aggregate Drainage Layer Material3.4.2 Bituminous Stabilized Material3.4.3 Cement Stabilized Material3.5 PLACING3.5.1 General Requisites3.5.2 Placement of Stabilized Material3.5
8、.3 Placing Adjacent Stabilized Strips3.5.4 Hand Spreading3.6 COMPACTION REQUIREMENTS3.6.1 Field Compaction3.6.2 Number of Passes3.6.3 Dry Density3.7 FINISHING3.8 CURING OF CEMENT STABILIZED MATERIAL3.9 EDGES OF DRAINAGE LAYER3.10 SMOOTHNESS TEST3.11 THICKNESS CONTROL3.12 DEFICIENCIES3.12.1 Grade and
9、 Thickness3.12.2 Density3.12.3 Smoothness- End of Section Table of Contents -SECTION 32 11 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 11 10 (August 2008)-Preparing Activity: USACE SupersedingUFGS-
10、32 11 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 32 11 10DRAINAGE LAYER08/08*NOTE: This guide specification covers the requirements for a drainage layer under roads, streets and airfield pavements.Edit this guide specification
11、for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guid
12、e specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR
13、).This guide specification includes tailoring options for RDM, cement or bituminous stabilized OGM, and OGM with choke stone. The notes under Table I should be renumbered accordingly. Selection or deselection of a tailoring option will include or exclude that option in the section, but editing the r
14、esulting section to fit the project is still required.*PART 1 GENERAL1.1 UNIT PRICES*NOTE: This paragraph will be deleted when the work is covered by a lump-sum contract price.*SECTION 32 11 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.
15、1.1 MeasurementDeductions will be made for any material wasted, unused, rejected, or used for the convenience of the Contractor.1.1.1.1 Aggregate Drainage Layer MaterialMeasure the quantity of aggregate drainage layer material, completed and accepted, in cubic meters yards. Determine the volume of a
16、ggregate drainage layer material, in place and accepted, by the average job thickness obtained in accordance with paragraph THICKNESS CONTROL and the dimensions indicated. The choke stone shall be considered as part of the drainage layer thickness and shall not be measured separately.1.1.1.2 Bitumin
17、ous or Cement Stabilized Drainage LayerMeasure the quantity of bituminous or cement stabilized drainage layer material, completed and accepted, in metric 2000 pound tons, excluding the weight of the asphalt or portland cement used in the mix.1.1.1.3 Bituminous MaterialMeasure the quantity of asphalt
18、 cement, used in the bituminous stabilized mix, by the number of liters gallons of material used in the accepted work corrected to liters at 16 degrees C gallons at 60 degrees F in accordance with ASTM D 1250.1.1.1.4 Cementitious MaterialMeasure the quantity of portland cement, used in the cement st
19、abilized mix, by the number of 50 kilogram short hundred-weight (cwt) units of cement used in the accepted work.1.1.2 PaymentThe quantities of drainage layer aggregates and bituminous or cementitious materials, as specified above, will be paid for at the contract unit prices, which will constitute f
20、ull compensation for the construction and completion of the drainage layer, including the test section, and the furnishing of all other necessary labor and incidentals.1.1.3 Waybills and Delivery TicketsSubmit copies of waybills and delivery tickets during the progress of the work. Before the final
21、payment is allowed, file certified waybills and certified delivery tickets for all aggregates, bituminous, and cementitious materials actually used.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in t
22、he text by basic designation only and listed in this paragraph by organization, designation, date, and title.SECTION 32 11 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Use the Reference Wizards Check Reference feature when you add a RID o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3211102008DRAINAGELAYER 水层 PDF