ARMY UFGS-32 01 29 62-2008 SLABJACKING RIGID PAVEMENTS《压浆刚性路面》.pdf
《ARMY UFGS-32 01 29 62-2008 SLABJACKING RIGID PAVEMENTS《压浆刚性路面》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-32 01 29 62-2008 SLABJACKING RIGID PAVEMENTS《压浆刚性路面》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 29.62 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 29.62 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 01 29.6
2、2SLABJACKING RIGID PAVEMENTS08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Quantity of Portland Cement Grout1.1.1.2 Quantity of Portland Cement1.1.1.3 Number of Holes1.1.1.4 Broken Slabs1.1.2 Payment1.1.2.1 Portland Cement Unit Price1.1.2.2 Drilled Holes1.2 REFERENCES1.3 SYSTEM DESCRIPTI
3、ON1.3.1 Equipment1.3.2 Grout Plant1.3.3 Water Tanker1.3.4 Drilling1.3.5 Flow Cone1.3.6 Miscellaneous1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Bench Marks1.5.2 Testing Facilities1.5.3 Cement1.5.4 Aggregate1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 Provisions for Cement1.6.2 Provisions for Aggregates1.7
4、ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 GROUT MIXTURE2.2 MINERAL AGGREGATE2.2.1 Particle Shape2.2.2 GradingSECTION 32 01 29.62 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.3 Deleterious Materials2.3 POZZOLANS AND FLY ASH2.4 PORTLAND
5、 CEMENT2.5 WATER2.6 CHEMICAL ADMIXTURES2.7 PROPORTIONING OF MATERIALS2.8 TESTS, INSPECTIONS, AND VERIFICATIONS2.8.1 Daily Report2.8.2 Compressive Strength2.8.3 Expansion2.8.4 Set Time2.8.5 FluidityPART 3 EXECUTION3.1 PAVEMENT INSPECTION3.2 DRILLING HOLES FOR GROUT INJECTION3.3 WASH HOLES3.4 JACKING3
6、.5 RAISING OF SLABS3.6 SEALING OF INJECTION HOLES3.7 PLAN GRADE REQUIREMENTS3.8 REPLACING AND REPAIR OF DAMAGED PAVEMENT3.9 PRODUCTION SAMPLING AND TESTING3.9.1 Aggregates3.9.2 Field Test Specimens3.10 PROTECTION OF PAVEMENT3.11 ACCEPTANCE OF WORK- End of Section Table of Contents -SECTION 32 01 29.
7、62 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 29.62 (August 2008)-Preparing Activity: USACE SupersedingUFGS-32 01 29.62 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreeme
8、nt with UMRL dated July 2008*SECTION 32 01 29.62SLABJACKING RIGID PAVEMENTS08/08*NOTE: This guide specification covers the requirements for slabjacking rigid pavements for roads, streets, parking areas, airfield and other general applications.Edit this guide specification for project specific requir
9、ements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome
10、 and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT P
11、RICES*NOTE: Delete paragraphs MEASUREMENT and PAYMENT when lump sum bidding is used.*1.1.1 MeasurementAccurately measure the dry materials by weight or volume if delivered in bulk or packaged in uniform volume sacks. Batche the water through a meter or scale with a totalizer for the days consumption
12、. Make these measurements under the supervision of the Contracting Officer. Submit weigh bills for cement and sand after slabjacking operations are completed, SECTION 32 01 29.62 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-to validate mix p
13、roportions used.1.1.1.1 Quantity of Portland Cement GroutThe quantity of portland cement grout to be paid for will be that actually used in the accepted work.1.1.1.2 Quantity of Portland CementThe quantity of portland cement to be paid for will be accurately measured by weight.1.1.1.3 Number of Hole
14、sThe quantity of holes to be paid for will be the number of holes actually drilled to accomplish the work specified, and as shown on the drawings.1.1.1.4 Broken SlabsRepair or replacement of concrete slabs broken due to jacking shall not be measured for payment. Furnish all labor, equipment, tools,
15、and materials necessary to repair or replace broken concrete pavement at no cost to the Government.1.1.2 Payment1.1.2.1 Portland Cement Unit PriceThe quantity of portland cement, measured as specified, will be paid for at the contract unit price for portland cement. The unit price for portland cemen
16、t will include full compensation for furnishing labor, grout materials, and tools and equipment; for furnishing, loading and unloading, storing, hauling and handling grout ingredients; for mixing and pumping grout; and for furnishing of manufacturers test report for each lot of cement. All of the ab
17、ove will be considered in the unit price per kg hundred weight of portland cement.1.1.2.2 Drilled HolesThe quantity of holes determined as specified, will be paid for at the contract unit price for Drilled Holes, which will include full compensation for furnishing all labor, equipment, tools, materi
18、als, and for filling of holes.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the R
19、eference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 32 01 29.62 Page 4Provided by IHSNot for ResaleNo reproduction
20、 or networking permitted without license from IHS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this s
21、pecification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM C 136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse AggregatesASTM C 142 (1997; R 2004) Standard Test Method for Clay Lumps and Fria
22、ble Particles in AggregatesASTM C 150 (2007) Standard Specification for Portland CementASTM C 266 (2007) Standard Test Method for Time of Setting of Hydraulic-Cement Paste by Gillmore NeedlesASTM C 31/C 31M (2008) Standard Practice for Making and Curing Concrete Test Specimens in the FieldASTM C 39/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS320129622008SLABJACKINGRIGIDPAVEMENTS 刚性 路面 PDF

链接地址:http://www.mydoc123.com/p-449713.html