1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 01 29.61 (November 2008)-Preparing Activity: USACE Superseding UFGS-32 01 28 (April 2008)UFGS-32 01 29.61 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 32 - EXTER
2、IOR IMPROVEMENTSSECTION 32 01 29.61PARTIAL DEPTH PATCHING OF RIGID PAVING11/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.1.1 Concrete1.1.1.2 Proprietary Cementitious Products1.1.2 Payment1.1.2.1 Concrete1.1.2.2 Proprietary Cementitious Products1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE
3、1.4.1 Preconstruction Testing Of Materials1.4.1.1 Cement1.4.1.2 Aggregate1.4.1.3 Proprietary Cementitious Products and Epoxy1.4.2 Equipment; Approval, Maintenance, and Safety1.4.3 Shop Detail Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Cement1.5.2 Aggregate1.5.3 Other Materials1.6 Project/Site
4、ConditionsPART 2 PRODUCTS2.1 MATERIALS2.1.1 Coarse Aggregate2.1.1.1 Composition2.1.1.2 Quality2.1.1.3 Particle Shape2.1.1.4 Gradation2.1.1.5 Alkali Silica Reactivity2.1.2 Fine Aggregate2.1.2.1 CompositionSECTION 32 01 29.61 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted w
5、ithout license from IHS-,-,-2.1.2.2 Particle Shape and Quality2.1.2.3 Grading2.1.2.4 Alkali Silica Reactivity2.1.3 Admixtures2.1.3.1 Air-Entraining Admixtures2.1.3.2 Chemical Admixtures2.1.4 Cement2.1.4.1 Portland Cement Mix Design2.1.5 Curing Materials2.1.5.1 Burlap2.1.5.2 Pigmented Liquid Membrane
6、-Forming Compound2.1.5.3 Waterproof Sheet Materials2.1.6 Bonding-Agents2.1.6.1 Epoxy-Resin2.1.6.2 Latex2.1.7 Joint Sealant2.1.8 Joint Filler2.1.9 Water2.1.10 Proprietary Cementitious Products2.1.10.1 Compressive Strength2.1.10.2 Bond Strength2.1.10.3 Modulus of Elasticity2.1.10.4 Coefficient of Ther
7、mal Expansion2.1.10.5 Shrinkage Potential2.1.10.6 Freeze-Thaw Resistance2.2 Neat Cement Grout2.2.1 Sand-Cement Grout Bonding Course2.2.2 Sand-Cement Mortar for Filling Small Popouts2.2.3 Dowels, Tie Bars, and ReinforcementPART 3 EXECUTION3.1 PREPARATION OF EXISTING PAVEMENT3.1.1 Preparation of Exist
8、ing Surfaces3.1.1.1 Joint Widening (Except Expansion Joints)3.1.2 Dowels, Tie Bars, and Reinforcement3.1.3 Preparation of Joints Adjacent to Spalls3.1.4 Disposal of Debris3.1.5 Bonding Coat3.1.5.1 Neat Cement Grout3.1.5.2 Epoxy-Resin3.1.5.3 Proprietary Cementitious Products3.1.6 Popout Repair3.1.7 P
9、atch Material Selection3.2 BATCHING, MIXING AND PROPORTIONING3.2.1 Equipment3.2.2 Conveying3.2.3 Facilities for Sampling3.2.4 Mix Proportions3.2.5 Measurement3.2.6 Workability3.3 PLACING3.3.1 Portland Cement Concrete3.3.2 Epoxy-Resin Concrete and Mortar3.3.3 Proprietary Cementitious Products3.3.4 Jo
10、ints3.4 FIELD QUALITY CONTROL3.4.1 General Requirements3.4.2 Specimens for Strength TestsSECTION 32 01 29.61 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.2.1 Test Results3.4.2.2 Acceptance3.5 FINISHING3.6 CURING3.6.1 Moist Curing3.6.2 Wa
11、terproof-Paper Blankets or Impermeable Sheets3.6.3 Membrane-Forming Curing Compound3.7 FINISH TOLERANCE3.8 PAVEMENT PROTECTION3.9 JOINTS- End of Section Table of Contents -SECTION 32 01 29.61 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USA
12、CE / NAVFAC / AFCESA / NASA UFGS-32 01 29.61 (November 2008)-Preparing Activity: USACE Superseding UFGS-32 01 28 (April 2008)UFGS-32 01 29.61 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 32 01 29.61PARTIAL DEPTH PATCHING OF RIG
13、ID PAVING11/08*NOTE: This guide specification covers the requirements for partial depth patching of rigid paving.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Re
14、move information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organi
15、zation designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for AFCESA, NASA, NAVFAC, and USACE. Selection or deselection of a tailoring option (select view-tailor
16、ing options) will include or exclude that option in the section. Specific project editing is still required for the resulting section.*NOTE: TO DOWNLOAD UFGS GRAPHICSGo to http:/www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf.*PART 1 GENERAL*SECTION 32 01 29.61 Page 4Provided by IHSNot for ResaleNo reproduct
17、ion or networking permitted without license from IHS-,-,-NOTE: This specification is not intended for repair of heat resistant concrete pavements, or for rapid repair of PCC that must be returned to service in a short time. See second note in paragraph entitled “Cement.“ For full depth repairs of PC
18、C pavements for roads and streets only, use Section 32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES.*NOTE: For full-depth patches or slab removal and replacement of airfield pavements, use Section 32 13 11 - CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY DUTY PAVEMENTS M
19、ORE THAN 10,000 CUBIC YARDS or Section 32 13 13.03 - AIRFIELDS AND HEAVY-DUTY CONCRETE PAVEMENT LESS THAN 10,000 CUBI YARDS.To review UFC 3-270-03 (15 March 2001), “Concrete Crack and Partial-Depth Spall Repair“ for drawings, details and illustrations, go to http:/www.wbdg.org/ccb/DOD/UFC/ufc_3_270_
20、03.pdf.*NOTE: As a minimum, show the following information on the drawings:1. Plans showing layout and identification of each joint and joint type. Include identification of joints with dowels and with tie-bars. Identify pavements or slabs that are reinforced and the reinforcement. Include location
21、of each random crack where repairs are needed.2. Show approximate location, length and width of each spall and location and size (usually average diameter) of each popout. Dimensions of spalls and popouts need not be to scale. Identify by legend and symbol whether spall repair needed is approximatel
22、y rectangular or pentagonal (triangular spall). Specifically detail any special or unusual shapes or partial depth repairs.3. If required spall repairs are extensive, provide a schedule showing scope of work and quantities for bid purposes in addition to the location plans. Identify feature areas wh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS320129612008PARTIALDEPTHPATCHINGOFRIGIDPAVING 刚性 路面 局部 深度 修补 PDF

链接地址:http://www.mydoc123.com/p-449712.html