1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 62 21 (November 2008)-Preparing Activity: USACE SupersedingUFGS-31 62 21 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 62 21PILING: COMPOSI
2、TE, WOOD AND CAST IN-PLACE CONCRETE11/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Piling1.1.2 Load Test1.1.3 Pile Withdrawals1.1.4 Basis of Payment1.1.4.1 Piling Quantities1.1.4.2 Variations in Pile Quantities1.1.4.3 Variations in the Number of Pile Load Tests1.1.4.4 Variations in Test Pile Withdrawals1.2
3、REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Subsurface Data1.3.2 Equipment1.3.2.1 Pile Hammer1.3.2.2 Driving Helmets or Caps1.4 SUBMITTALS1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 PILES2.1.1 Wood Sections2.1.2 Metal Shells2.1.3 Concrete2.1.4 Reinforcing SteelPART 3 EXECUTION3.1 PILE DRIVING3.1
4、.1 Concrete Placement3.1.2 Splices3.1.3 Tolerances in Driving3.1.4 Cutting of Piles3.1.5 Rejected PilesSECTION 31 62 21 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.6 Predrilling3.1.7 Collars or Bands3.1.8 Metal Shoes3.1.9 Joints3.1.10 W
5、elding3.1.11 Pile Heave3.1.12 Curing3.1.13 Long Piles3.1.14 Jetting of Piles3.2 FIELD TEST AND INSPECTIONS3.2.1 Test Piles3.2.2 Load Tests3.2.3 Safe Design Capacity3.2.4 Inspection3.2.5 Pile Capacity- End of Section Table of Contents -SECTION 31 62 21 Page 2Provided by IHSNot for ResaleNo reproducti
6、on or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 62 21 (November 2008)-Preparing Activity: USACE SupersedingUFGS-31 62 21 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 31 62 21PILING:
7、 COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE11/08*NOTE: This guide specification covers the requirements for composite, wood and cast-in-place concrete piles.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable i
8、tems(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of
9、technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES1.1.1 PilingPiling will be paid at the contract unit price per linear m foot (inc
10、luding test piles), for “Piling“ multiplied by the total linear m feet of acceptable piles actually installed. The Contracting Officer reserves the right to increase or decrease the total length of piles to be furnished and installed by changing the foundation pile locations or elevations, requiring
11、 the installation of additional piles, or requiring omission of piles. Payment will constitute full compensation for furnishing, delivering, handling, and installing the foundation piles. The Contractor will not be allowed payment for withdrawn, broken, or rejected piles or (except for test piles) f
12、or any portion of any pile remaining above the cut-off point.SECTION 31 62 21 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.2 Load TestThe contract includes _ metric ton -ton pile load tests. The Contracting Officer reserves the right to
13、increase or decrease the number of load tests. Adjustments in the contract price will be made for such increases or decreases by the contract price for “Additional Pile Load Test“ or “Omitted Pile Load Test.“1.1.3 Pile WithdrawalsPile Withdrawals will be paid at the contract unit price each for “Pil
14、e Withdrawals“ multiplied by the number of piles withdrawn as directed. The Contracting Officer reserves the right to increase or decrease the number of pile withdrawals. Adjustments in the contract price will be made in accordance with the CONTRACT CLAUSES.1.1.4 Basis of Payment*NOTE: This paragrap
15、h anticipates bids on a lump sum price, with directed changes in accordance with the CONTRACT CLAUSES or with the unit prices defined above. Where the contract is based on unit price, this paragraph should be deleted and replaced by the following paragraph:*The contract price for piling will include
16、 the cost of all necessary equipment, tools, material, labor, and supervision required to: deliver, handle, install, cut off, and withdraw the piles (including test piles), and conduct the load tests. Payment for piles will be based on the lengths of acceptable piles measured from cut-off elevations
17、 to final tip elevations. No additional payment will be made for: damaged, rejected, or misplaced piles, withdrawn piles, other than test piles withdrawn as directed, any portion of a pile remaining above the cut-off elevation, backdriving, cutting off piles, splicing, build-ups, or any cut-off leng
18、ths of piles.1.1.4.1 Piling QuantitiesThe contract price for piling, including _ test piles, will be based on the following quantities and will include _ -metric ton -ton load tests and _ test pile withdrawals.TotalSize LengthNumber of Piles (mm) m _ _ _ _ _TotalSize LengthNumber of Piles (inches) (
19、feet)_ _ _ _ _SECTION 31 62 21 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.4.2 Variations in Pile QuantitiesBased on the results of driving and loading the test piles, the Contracting Officer will determine and will list for the Contrac
20、tor calculated pile tip elevations and the minimum driving resistances for all piles. The Contracting Officer reserves the right to increase or decrease the total length of piles to be furnished and installed by changing the pile locations or elevations, requiring the installation of additional pile
21、s, or directing the omission of piles from the requirements shown and specified. Should the total length of piles installed vary from that specified because of added or omitted piles or variations in the pile lengths, the contract price for piling will be adjusted by the applicable contract unit pri
22、ce per linear meter foot (by size) for “Additional Pile Length“ or “Omitted Pile Length“ and multiplied by the actual length added or omitted.1.1.4.3 Variations in the Number of Pile Load TestsThe Contracting Officer reserves the right to increase or decrease the number of pile load tests from that
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3162212008PILINGCOMPOSITEWOODANDCASTINPLACECONCRETE 打桩 木质 复合材料 现场 浇注 混凝土 PDF

链接地址:http://www.mydoc123.com/p-449696.html