1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 32 23 (August 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 32 23 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 32 23FOUNDATION DRIL
2、LING AND GROUTING08/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Mobilization and Demobilization1.1.1.1 Payment1.1.1.2 Unit of Measure1.1.2 Drilling Grout Holes1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Drilling Drain Holes1.1.3.1 Payment1.1.3.2 Measurement1.1.3.3 Unit of Measure1.1.4 Dr
3、illing Exploratory Holes1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measure1.1.5 Pressure Washing and Pressure Testing1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Steel Pipe and Fittings1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 Portland Cement in Grout1.1
4、.7.1 Payment1.1.7.2 Measurement1.1.7.3 Unit of Measure1.1.8 Pozzolans (Fly Ash) in Grout1.1.8.1 Payment1.1.8.2 Measurement1.1.8.3 Unit of Measure1.1.9 Sand in Grout1.1.9.1 PaymentSECTION 31 32 23 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
5、1.1.9.2 Measurement1.1.9.3 Unit of Measure1.1.10 Fluidifier in Grout1.1.10.1 Payment1.1.10.2 Measurement1.1.10.3 Unit of Measure1.1.11 Bentonite in Grout1.1.11.1 Payment1.1.11.2 Measurement1.1.11.3 Unit of Measure1.1.12 Placing Grout1.1.12.1 Payment1.1.12.2 Measurement1.1.12.3 Unit of Measure1.1.13
6、Connections to Grout Holes1.1.13.1 Payment1.1.13.2 Measurement1.1.13.3 Unit of Measure1.2 REFERENCES1.3 DEFINITIONS1.3.1 Zone1.3.2 Section1.3.3 Stage1.3.4 Stop1.3.5 Split Spacing1.4 SYSTEM DESCRIPTION1.5 SUBMITTALS1.6 DELIVERY, STORAGE, AND HANDLING1.7 PROJECT/SITE CONDITIONSPART 2 PRODUCTS2.1 GROUT
7、ING MATERIAL2.1.1 Water2.1.2 Cement2.1.3 Pozzolans2.1.4 Admixtures2.1.5 Fluidifier2.1.6 Bentonite2.1.7 Sand2.2 METAL PIPE AND FITTINGS2.2.1 Pipe2.2.2 FittingsPART 3 EXECUTION3.1 EQUIPMENT3.1.1 General3.1.2 Drilling Equipment3.1.3 Grouting Equipment3.2 GROUT, DRAINAGE AND EXPLORATORY HOLES3.2.1 Pipe
8、for Foundation Grouting and Drainage3.2.2 Grout Hole Drilling3.2.3 Drain Hole Drilling3.2.4 Completion of Grouting and Drain Hole Drilling3.2.5 Exploratory Hole Drilling3.3 PROCEDURES FOR DRILLING AND GROUTING3.3.1 General3.3.2 Stage GroutingSECTION 31 32 23 Page 2Provided by IHSNot for ResaleNo rep
9、roduction or networking permitted without license from IHS-,-,-3.3.2.1 Primary Holes3.3.2.2 Successive Holes3.3.2.3 Completion of Section3.3.3 Stop Grouting3.3.4 Pressure Washing and Pressure Testing3.3.5 Stage Grouting Procedures3.3.5.1 First Stage3.3.5.2 Second Stage3.3.6 Stop Grouting Procedures3
10、.3.6.1 Stop Grouting of Grout Holes3.3.6.2 Grouting of Existing Exploratory Holes3.3.7 Grouting Pressures3.3.8 Grouting3.3.8.1 Grout Mixes3.3.8.2 Grout Injection3.3.8.3 Backfilling of Holes3.3.8.4 Equipment Arrangement and Operation3.3.8.5 Protection to Work and Cleanup3.3.9 Records3.3.10 Communicat
11、ions- End of Section Table of Contents -SECTION 31 32 23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 32 23 (August 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 32 23 (April 2006)UNIFIED FAC
12、ILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 32 23FOUNDATION DRILLING AND GROUTING08/08*NOTE: This guide specification covers the requirements for drilling exploratory holes; drilling drain holes; drilling, washing and pressure testing grout holes; mak
13、ing grout connections; furnishing, handling, transporting, storing, mixing and injecting the grouting materials; patching the finished grout holes; care and disposal of drill cuttings, waste water and waste grout; clean-up grout galleries and shafts and areas upon completion of the work and all such
14、 other operations as are incidental to the drilling and the grouting.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not requir
15、ed in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is
16、on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This guide specification has been prepared as a section in a general construction specification for concrete dams. By rewording as necessary, this specification may be adapted t
17、o other types of foundation treatment, such as under power plants, locks, cutoff trenches, tunnels, and others.SECTION 31 32 23 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Methods for listing subdivided items are described in Paragraph 52.2
18、/9109(g) “Variations in Estimated Quantities - Subdivided Items“ of Engineer Federal Acquisition Regulation Supplement (EFARS). However, effectiveness of the use of subdivided items in grouting has been questioned as being more hazardous than helpful and that the standard variations in quantity clau
19、se should be used.Provisions are made for the use of a sanded grout but should generally be limited to those formations where quantities in excess of one cubic foot of grout per linear foot of hole are anticipated. The information contained in EM 1110-2-3506, “Grouting Technology“ and EM 1110-2-1302
20、, “Cost Estimates - Government Estimate of Fair and Reasonable Cost to Contractor“ should be used as a guide in estimating quantities.Computer Application of Geotechnical Engineering (CAGE):a. The CAGE Grouting Task Group has developed a microcomputer program for documentation of grouting operations
21、 and graphics for rapid display of data for better field control. Some of the highlights of the program include optional data entry by a laptop or hand held computer in the field, technical review and quality control, preparation of Contractors pay schedules, and preparation of foundation reports. T
22、he Users Guide “Microcomputer Grouting Data Package (Multiple Zone and Stage Version for PC and Hand Held Computer)“ is available from the U.S. Army Engineer Waterways Experiment Station (USACE-WES-GL). Use of this CAGE package will not require contractual or technical additions to the contract spec
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3132232008FOUNDATIONDRILLINGANDGROUTING 桩基 钻孔 灌浆 PDF

链接地址:http://www.mydoc123.com/p-449691.html