1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 31 16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 31 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 31 16SOIL TREATMENT FOR S
2、UBTERRANEAN TERMITE CONTROL08/08PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALITY ASSURANCE1.3.1 Qualifications1.3.2 Safety Requirements1.4 DELIVERY, STORAGE, AND HANDLING1.4.1 Delivery1.4.2 Inspection1.4.3 Storage1.4.4 Handling1.5 SITE CONDITIONS1.5.1 Soil Moisture1.5.2 Runoff and Wind Drift1.5
3、.2.1 Vapor Barriers and Waterproof Membranes1.5.2.2 Utilities and Vents1.5.3 Placement of Concrete1.6 WARRANTYPART 2 PRODUCTS2.1 TERMITICIDESPART 3 EXECUTION3.1 VERIFICATION OF MEASUREMENT3.2 TECHNICAL REPRESENTATIVE3.3 SITE PREPARATION3.3.1 Ground Preparation3.3.2 Verification3.3.3 Foundation Exter
4、ior3.3.4 Utilities and Vents3.3.5 Crawl and Plenum Air Spaces3.3.6 Application Plan3.4 TERMITICIDE TREATMENTSECTION 31 31 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.1 Equipment Calibration and Tank Measurement3.4.2 Mixing and Applic
5、ation3.4.3 Treatment Method3.4.3.1 Surface Application3.4.3.2 Rodding and Trenching3.4.4 Sampling3.5 CLEAN UP, DISPOSAL, AND PROTECTION3.5.1 Clean Up3.5.2 Disposal of Termiticide3.5.3 Protection of Treated Area3.6 CONDITIONS FOR SATISFACTORY TREATMENT3.6.1 Equipment Calibrations and Measurements3.6.
6、2 Testing3.6.3 Disturbance of Treated Soils3.6.4 Termites Found Within the Warranty Period3.7 RE-TREATMENT- End of Section Table of Contents -SECTION 31 31 16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-
7、31 31 16 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 31 16 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 31 16SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL08/08*NOTE: This guide specification covers the requiremen
8、ts for termiticide treatment measures for subterranean termite control.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not requ
9、ired in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, i
10、s on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Termite infestation exists throughout the United States and overseas areas with the exception of Alaska. Soil treatment will be specified for all types of construction where t
11、ermites are likely to establish colonies and make concealed access to wood construction, including wood doors, windows, finish, and trim, or to wood-product, cloth, or cellulose storage in buildings. Soil treatment will also be required for structures constructed of or containing wood-preservative-t
12、reated items. However, soil treatment is not required for power plants, central-heating plants, water- or sewer-treatment plants, incinerators, pump houses, and structures of similar nature which have neither wood in their SECTION 31 31 16 Page 3Provided by IHSNot for ResaleNo reproduction or networ
13、king permitted without license from IHS-,-,-construction nor wood or cellulose items stored within, and which have little chance of conversion to alternative uses.Modification of this section, including materials, concentrations, or rates of application, considered necessary because of climatic cond
14、itions, porosity of soil to be treated, type of termite, or heavy infestation of termites, will be as recommended by the certified installation pest management coordinator. The modification will be in accordance with the guidance contained in the installation pest management program. Army Regulation
15、 210-50, Housing Management, paragraph SPECIAL CONDITIONS, prohibits termiticide treatment through or under concrete slabs where HVAC ducts or vents are within or beneath the slab. Information is also available from state and local agriculture agencies and from the EPA National Pesticide Telephone N
16、etwork at 1-800-858-7378.When termites are known to be present on the project site, any crawl space on the ground level designed in a building needs to be designed for a concrete cover to be placed over the soil after treatment by a termiticide. Since the crawl space remains accessible to people and
17、 animals, it requires the concrete cover and signage.For maximum termite protection, new structures should be designed and constructed using CCA- or borate-treated lumber, especially for foundation members. Untreated lumber in existing structures may be treated using rods of CCA or borate salts whic
18、h can be inserted into non-treated wood and dissolved with water for absorption by the wood.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this pa
19、ragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the iss
20、ue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.SECTION 31 31 16 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
21、IHS-,-,-*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)7 USC Section 136 Federal Insecticide, Fungicide, and Rodenticide Act1.2 SUBMITT
22、ALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3131162008SOILTREATMENTFORSUBTERRANEANTERMITECONTROL 地下 白蚁 防治 土壤 处理 PDF

链接地址:http://www.mydoc123.com/p-449689.html