1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 21 00 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 21 00 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 21 00PIPING; OFF-GAS08/
2、08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Measurement1.1.2 Payment1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Design Requirements1.3.2 Performance Requirements1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Contractor Qualifications1.5.2 Single Source Supplier1.5.3 Welding1.5.4 Jointing Plastic and Fiberglass Rei
3、nforced Pipe1.5.5 PRE-INSTALLATION MEETING1.6 DELIVERY, STORAGE, AND HANDLING1.6.1 Packaging1.6.2 Cleaners, Solvents and Glues1.6.3 Storage1.7 SEQUENCING AND SCHEDULING1.8 EXTRA MATERIALS1.9 MAINTENANCE SERVICEPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Identification2.2 D
4、ESIGN STRENGTH2.3 STEEL PIPE2.3.1 Carbon Steel Located Above Grade2.3.2 Silicone Coating2.3.3 Zinc Coating2.3.4 Thermoplastic Resin Coating System2.3.5 Cathodic ProtectionSECTION 31 21 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.4 COPP
5、ER TUBING2.5 POLYVINYL CHLORIDE (PVC) PIPING2.5.1 PVC Pipe2.5.2 PVC Joints2.5.3 PVC Fittings2.6 POLYETHYLENE (PE) PIPING2.6.1 PE Pipe2.6.2 PE Joints and Fittings2.7 REINFORCED EPOXY RESIN PIPING2.7.1 Epoxy Resin Pipe2.7.2 Epoxy Resin Joints and Fittings2.8 DUCT SYSTEMS2.9 FLANGED CONNECTIONS2.9.1 Fl
6、anges2.9.2 Gaskets2.9.3 Sealants2.10 EQUIPMENT AND APPURTENANCES2.10.1 Manually Operated Valves2.10.2 Relief Valves2.10.3 Unloading Valves2.10.4 Vacuum Breakers2.10.5 Dielectric Fittings2.10.6 Meters2.10.7 Insulation2.10.8 Supports for Aboveground Piping2.10.9 Valve Boxes2.11 FACTORY TESTSPART 3 EXE
7、CUTION3.1 EXAMINATION3.2 MANUFACTURERS REPRESENTATIVE3.3 CONDENSATE CONTROL3.4 PRESSURE REGULATOR AND METER INSTALLATION3.4.1 Pressure Regulators3.4.2 Meters3.4.3 Vents3.5 INSTALLING PIPE UNDERGROUND3.5.1 Cathodic Protection3.5.2 Valve Boxes3.5.3 Magnetic Tape3.5.4 Pipe Coatings3.6 INSTALLING PIPE A
8、BOVEGROUND3.6.1 Hangers and Supports3.6.2 Insulation3.6.3 Coatings or Finishes3.7 JOINTING PIPE3.7.1 O-Ring Joints3.7.2 Mechanical Joints3.7.3 Flanged Joints3.7.4 Expansion Couplings3.7.5 Destructive Joint Tests3.8 CONNECTIONS3.8.1 Transitions Between Types of Pipe3.8.2 Connections to Off-Gas Source
9、 and Discharge Points3.8.3 Connection to Equipment3.8.4 Location of Existing Piping3.8.5 Removing Existing Pipelines from Service3.9 PRESSURE AND LEAKAGE TESTSSECTION 31 21 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.9.1 Bubble Tests3.
10、9.2 Pressure Testing3.9.3 Leakage Testing3.9.4 Vacuum Testing3.9.5 Hanger Acceptance Testing3.9.6 Demonstration- End of Section Table of Contents -SECTION 31 21 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA
11、UFGS-31 21 00 (August 2008)-Preparing Activity: USACE SupersedingUFGS-31 21 00 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION 31 21 00PIPING; OFF-GAS08/08*NOTE: This guide specification covers the requirements for pipe systems for t
12、he transmission of gases and vapors.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether
13、 or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended chang
14、es to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: When it is determined that lump sum contract is advisable this paragraph will be deleted.*Measurement and payment will be based on completed work performed in accordance with the drawings, specif
15、ications, and the contract payment schedules. No payment will be made under this section for excavation, trenching, or backfilling. Payment for such work will be made under Section 31 00 00 EARTHWORK.SECTION 31 21 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without
16、license from IHS-,-,-1.1.1 MeasurementThe length of pipe lines to be paid for will be determined by measuring along the centerline of the various sizes of pipe furnished and installed. Pipe will be measured from center of fitting to center of fitting and from connection to connection to wells or tre
17、atment units. No deduction will be made for the space occupied by valves or fittings.1.1.2 PaymentPayment will be made for off-gas piping at the contract unit price per linear meter linear foot for the various types and sizes of piping, and will be full compensation for pipes, joints, specials, and
18、fittings, complete in place. Payment for valves, valve boxes, and standard valve manholes will be made at the respective contract unit price each for such items complete in place. Payment will include the furnishing of testing, plant, labor, and material and incidentals necessary to complete the wor
19、k, as specified and as shown.1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Re
20、ference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be d
21、eleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICA
22、N GAS ASSOCIATION (AGA)AGA B109.2 (2000)Diaphragm-Type Gas Displacement Meters (500 cubic ft./hour Capacity and Over)AGA XR0104 (2006) AGA Plastic Pipe Manual for Gas ServiceAMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)ANSI Z400.1 (2004) Hazardous Industrial Chemicals - Material Safety Data Sheets -
23、PreparationSECTION 31 21 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-AMERICAN PETROLEUM INSTITUTE (API)API Spec 5L (2007) Specification for Line PipeAPI Spec 6D (2008) Specification for Pipeline ValvesAMERICAN WATER WORKS ASSOCIATION (AW
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3121002008PIPINGOFFGAS 管道 尾气 PDF