1、*USACE / NAVFAC / AFCESA / NASA UFGS-27 05 29.00 10 (August 2011)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 27 - COMMUNICATIONSSECTION 27 05 29.00 10PROTECTIVE DISTRIBUTION SYSTEM (PD
2、S) FOR SIPRNET COMMUNICATION SYSTEMS08/11PART 1 GENERAL1.1 RELATED REQUIREMENTS1.2 REFERENCES1.3 ADMINISTRATIVE REQUIREMENTS1.3.1 Conditions1.3.2 Construction Methods1.3.3 PDS Design1.3.4 PDS Design Technical Review1.3.5 PDS Design Approval Request1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Manufacture
3、rs Qualifications1.5.2 Installers Qualifications1.5.3 Equipment1.6 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 PDS CARRIER CONFIGURATION2.1.1 Secure Raceway Carrier2.1.1.1 Fittings and Components2.1.1.2 Mounting Accessories2.1.1.3 Through Wall Penetrating2.1.1.4 Pull Points2.1.2 Conduit Carrie
4、r2.1.2.1 Conduit2.1.2.2 Mounting Brackets2.1.2.3 Fittings2.1.2.4 Through Wall Penetrating2.1.2.5 Pull Points2.2 USER DROP BOX2.3 ENCLOSURESPART 3 EXECUTION3.1 EXAMINATIONSECTION 27 05 29.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2
5、 PDS CARRIER ROUTING3.2.1 General3.2.2 Distribution Topology3.2.3 Mounting Location Considerations3.2.4 Adjacent Infrastructure Considerations3.3 INSTALLATION3.3.1 Mounting PDS Carrier3.3.2 Enclosures3.3.2.1 User Drop Box (UDB)3.3.2.2 Other Enclosures3.3.3 Mechanical Security3.3.4 Carrier Support3.4
6、 FIELD QUALITY ASSURANCE3.4.1 Physical Inspection3.4.2 Magnetic Test3.5 CLEANING AND PROTECTION- End of Section Table of Contents -SECTION 27 05 29.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-27 05
7、 29.00 10 (August 2011)-Preparing Activity: USACE NewUNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 27 05 29.00 10PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET COMMUNICATION SYSTEMS08/11*NOTE: This guide specification covers the requirement
8、s for a protective distribution system used in conjunction with SIPRNET communication systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for
9、 project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended ch
10、anges for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 RELATED REQUIREMENTS1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the
11、text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the SECTION
12、 27 05 29.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification whe
13、n you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)ANSI C80.3 (
14、2005) American National Standard for Electrical Metallic Tubing (EMT)NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011; TIA 11-1; Errata 2011) National Electrical CodeNATIONAL SECURITY TELECOMMUNICATIONS AND INFORMATION SYSTEMS SECURITY (NSTISS)NSTISSAM TEMPEST/2-95 (1995; Am A 2000) RED/BLAC
15、K Installation GuidanceNSTISSI-7003 (1996) Protective Distribution Systems (PDS)TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)TIA-569 (2004b; Add 1 2009) Commercial Building Standard for Telecommunications Pathways and Spaces1.3 ADMINISTRATIVE REQUIREMENTS1.3.1 ConditionsNotify the Contracting Office
16、r if it is impossible to install SIPRNET PDS that complies with this section and references.1.3.2 Construction MethodsMethods of construction that are not specifically described or indicated in the Contract will be subject to the control and approval of the Contracting Officer.1.3.3 PDS DesignInclud
17、e separate plans, elevations, sections, details, and attachments to other work. Indicate PDS carrier route, PDS carrier mounting height above finished floor, user drop box mounting height, and user drop box locations. Submit the PDS design to the cognizant Central TEMPEST Technical Authority (CTTA),
18、 for a technical review prior to the acquisition of material, through the installation Network Enterprise Center (NEC) or SECTION 27 05 29.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Directorate of Information Management (DOIM).1.3.4
19、PDS Design Technical ReviewCoordinate with the installation NEC/DOIM and submit PDS design for technical review to CTTA. Provide PDS carrier shop drawings, List of Material (LOM), and any other documentation required 90-days prior to PDS carrier installation (see NSTISSI-7003, Appendix C).1.3.5 PDS
20、Design Approval RequestPDS design approving authority is the installation NEC/DOIM Designated Approving Authority (DAA). Submit PDS design and CTTA technical review to the installation NEC/DOIM to obtained PDS design approval from the DAA prior to installation.1.4 SUBMITTALS*NOTE: Review Submittal D
21、escription (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requi
22、res Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS27052900102011PROTECTIVEDISTRIBUTIONSYSTEMPDSFORSIPRNETCOMMUNICATIONSYSTEMSPDF

链接地址:http://www.mydoc123.com/p-449670.html