1、*USACE / NAVFAC / AFCESA UFGS-26 42 19.10 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-26 42 19.10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 42 19.10CATHODI
2、C PROTECTION SYSTEMS (IMPRESSED CURRENT)FOR LOCK MITER GATES11/08PART 1 GENERAL1.1 UNIT PRICES1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 General Description1.3.2 Performance Requirements1.3.2.1 First Criterion1.3.2.2 Second Criterion1.3.3 Contractor Quality Control1.3.3.1 General1.3.3.2 Reporting1.3.
3、4 Modification of Design1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Qualifications1.5.2 Contractors Responsibilities1.5.3 Corrosion Expert1.5.4 Pre-Installation Meeting1.6 DELIVERY, STORAGE, AND HANDLING1.7 PROJECT/SITE CONDITIONS1.8 WARRANTY1.9 SYSTEM COMMISSIONING1.9.1 General1.9.2 Insulation Testing
4、1.10 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Direct Current Cables2.1.1.1 Anode Lead Cables2.1.1.2 Rectifier and Terminal Cabinets Connection Cables2.1.2 Cable in Conduit2.2 RECTIFIERS AND AUXILIARY EQUIPMENT2.2.1 GeneralSECTION 26 42 19.10 Page 1Provided by IHSNot for ResaleN
5、o reproduction or networking permitted without license from IHS-,-,-2.2.2 Cabinets2.2.3 Wheeled Rectifier Cabinets (Alternate 1)2.2.4 Stationary Cabinets (Alternate 2)2.2.5 Circuit Breakers2.2.6 Step-down Transformers2.2.7 Rectifier Transformers2.2.8 Rectifiers2.2.9 Ammeter and Voltmeter2.2.10 Curre
6、nt Monitoring Shunt2.2.11 Ammeter and Voltmeter Switches2.2.12 Control and Instrument Panel2.2.12.1 Tap Bars2.2.12.2 DC Output Terminals2.2.12.3 Components Identification2.2.13 Anode Cable Leads2.2.14 Surge Arresters2.2.15 Wiring Diagram2.2.16 Resistor and Anode Terminal Cabinet Wiring Diagram2.3 CO
7、NDUIT AND FITTINGS2.3.1 Nonmetallic Conduit2.3.2 Rigid Metal Conduit2.3.3 Conduit Fittings and Outlets2.4 RESISTOR AND ANODE TERMINAL CABINETS2.5 IMPRESSED CURRENT ANODES AND MATERIALS2.5.1 General Requirements2.5.2 Ceramic Precious Metal Oxide Coated Anodes2.5.2.1 Conductive Precious Metal Oxide Ce
8、ramic Coating2.5.2.2 Anode Substrate Material2.5.3 Hi-Silicon Cast-Iron Anodes2.5.3.1 Chemical Composition (Nominal)2.5.3.2 Electrical Resistivity2.5.3.3 Physical Properties (Nominal)2.5.4 Ceramic Coated Titanium Anodes (Disk Type)2.5.4.1 General2.5.4.2 Impact Protection for Disk Anode Cables2.5.4.3
9、 Number of Ceramic Coated Titanium Disk Anodes2.5.5 Hi-Silicon Cast Iron Button Anodes2.5.5.1 General2.5.5.2 High-Silicon, Cast-Iron Anodes (Button Type)2.5.5.3 Anodes Number2.5.5.4 Assembly2.5.5.5 Impact Protection for Button Anode Cables2.5.6 Ceramic Coated Titanium Segmented Rod Anodes2.5.7 Hi-Si
10、licon Cast Iron Sausage Anode Strings2.6 IMPACT PROTECTION FOR RODS AND SAUSAGE-STRING ANODES2.6.1 PVC Pipe and Metal Couplings2.6.2 Protective Angle Irons2.6.2.1 PVC Piping2.6.2.2 Painting2.7 MARKINGS2.7.1 General2.9.2 Rectifier CabinetsPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.3 WIRING3.3.1
11、 Gate Structure at Control RoomSECTION 26 42 19.10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.2 Rectifier on the Lock Wall3.3.3 Wiring on the Gate Structure3.4 ROD AND SAUSAGE ANODE INSTALLATION3.4.1 Metal Pipe Couplings for PVC Pipe3.
12、4.2 Assembly of Titanium Rod Anode3.4.3 Suspension of Anode Rod or String Assemblies3.5 DISK AND BUTTON ANODE INSTALLATION3.5.1 General3.5.2 Impact Protection Pipes Installation3.5.3 Disk Anode Installation3.5.4 Button Anode Installation3.6 RECTIFIER CABINET INSTALLATION3.7 RESISTOR AND ANODE TERMIN
13、AL CABINETS INSTALLATION3.8 REPAIR OF EXISTING WORK3.9 SYSTEM COMPONENT CIRCUIT RESISTANCE MEASUREMENT3.10 STRUCTURE-TO-REFERENCE CELL POTENTIAL MEASUREMENTS3.11 RECTIFIER ADJUSTMENT3.11.1 Locations of Structure-to-Reference Cell3.11.2 Polarization Decay3.12 RECORDING OF MEASUREMENTS3.13 OPERATION A
14、ND MAINTENANCE INSTRUCTIONS3.13.1 Operating Instructions3.13.2 Maintenance Instructions3.14 TRAINING COURSE- End of Section Table of Contents -SECTION 26 42 19.10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA UFGS-26
15、42 19.10 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-26 42 19.10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 26 42 19.10CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT)FOR LOCK MITER GATES11/08*NOTE: This guide
16、 specification covers the requirements for cathodic protection systems for lock miter gates.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and
17、requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation an
18、d telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Cathodic Protection should be installed on those portions of the gates submerged at normal pool levels. The faces of the gates should be protected to uppe
19、r pool stages, except that the downstream face of the lower gates must be protected to the lower pool level.This guide specification includes the technical requirements for the types of equipment normally provided in a cathodic protection system, and is based upon the premise that the system is desi
20、gned by a qualified engineering firm hired by the Government to provide a complete cathodic protection system design, including detailed specifications SECTION 26 42 19.10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(which contain performan
21、ce criteria) and drawings which the successful Contractor can then use to construct the system. The engineering firm must provide the design services of a Corrosion Expert(s) to design, supervise, and inspect system installation and test, energize, and adjust the completed system installation. The C
22、orrosion Expert is a person, who by reason of thorough knowledge of the physical sciences and the principles of engineering and mathematics, acquired by professional education and related practical experience, is qualified to engage in the practice of corrosion control of Lock R 1992) Requirements f
23、or Electrical Analog Indicating InstrumentsASTM INTERNATIONAL (ASTM)ASTM A 518/A 518M (1999; R 2003) Standard Specification for Corrosion-Resistant High-Silicon Iron CastingsASTM D 1248 (2005) Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and CableSECTION 26 42 19.10
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS264219102008CATHODICPROTECTIONSYSTEMSIMPRESSEDCURRENTFORLOCKMITERGATES 闸门 锁定 外加 电流 阴极保护 系统 PDF

链接地址:http://www.mydoc123.com/p-449669.html