1、*USACE / NAVFAC / AFCESA / NASA UFGS-26 09 13 (November 2008)-Preparing Activity: USACE SupersedingUFGS-26 09 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 09 13POWER MONITORI
2、NG SYSTEM11/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 System Requirements1.2.2 System Response Times1.2.3 System Accuracy and Display1.2.4 Electrical Transients and Electromagnetic Interference1.2.4.1 Power Line Surge Protection1.2.4.2 Sensor Wiring Surge Protection1.2.4.3 Communicat
3、ions Channels Surge Protection1.2.5 Workstation Equipment Power Source1.2.6 Communications1.2.7 Expansion Requirements1.2.8 Protocols1.2.9 Utility Demand Interval Synchronization1.2.10 General Requirements for Testing1.2.11 Test Procedures and Reports1.3 DELIVERY OF TECHNICAL DATA AND COMPUTER SOFTW
4、ARE1.3.1 Data, Drawings, CD-ROMs, and Manuals1.3.2 Technical Data Package 1 - Existing Conditions Report1.3.3 Technical Data Package 2 - System Data1.3.3.1 System and Installation Drawings1.3.3.2 Equipment Data1.3.3.3 Installation, Setup and Operation Guides1.3.3.4 Users Guides1.3.3.5 Certifications
5、1.3.4 Technical Data Package 3 - Training Data1.3.5 Technical Data Package 4 - Performance Verification Testing Procedures1.3.6 Technical Data Package 5 - Performance Verification Testing Data1.3.7 Technical Data Package 6 - Operation and Maintenance Manuals1.4 ENVIRONMENTAL REQUIREMENTS1.5 MAINTENA
6、NCE AND SERVICE1.5.1 General Requirements1.5.2 Description of WorkSECTION 26 09 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS1.5.3 Service Calls1.5.4 Records and Logs1.5.5 System Modifications1.5.6 Software1.5.7 Telephone ConsultationPART 2 PR
7、ODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 General2.1.2 Nameplates2.1.3 Field Wiring, Cabling, and Terminal Blocks2.1.4 Power Supplies2.1.5 Enclosures2.1.6 EMI/RFI Compliance2.2 FIELD EQUIPMENT2.2.1 Basic Intelligent Electronic Device (IED)2.2.1.1 Basic IED2.2.1.2 Mounting2.2.1.3 Communications2.2.1.4 K
8、WH Value Retention2.2.2 IED Communication Equipment2.2.3 Enhanced IED2.3 INSTRUMENT TRANSFORMERS2.3.1 Potential Transformers2.3.2 Multi-Ratio Current Transformers2.4 WORKSTATION EQUIPMENT2.4.1 Workstation Computer2.4.1.1 Digital Computer2.4.1.2 Memory2.4.1.3 Hard Disk Drive Data Storage2.4.1.4 Flopp
9、y Disk Drive2.4.1.5 CD-ROM Drive2.4.1.6 Workstation Computer Magnetic Tape Drive2.4.1.7 Workstation Color Monitors2.4.1.8 Keyboard2.4.1.9 Mouse2.4.1.10 Audible Alarm2.4.1.11 Laser Printer2.4.2 Communications2.5 SYSTEM SOFTWARE2.6 COMMAND SOFTWARE2.6.1 General Features2.6.2 Database Management2.6.2.1
10、 Real-Time Database2.6.2.2 Database Editor2.6.2.3 Calculated Value2.6.3 Scanning2.6.4 Error Detection and Retransmission2.6.5 User Interface Software2.6.5.1 General Display Requirements2.6.5.2 Display Editor2.6.5.3 Specific Displays2.6.6 System Access Control2.6.7 Trending2.6.7.1 Software General Re
11、quirements2.6.7.2 Trend Description Fields2.6.7.3 Trend Functions2.6.7.4 Storage of Trend FilesSECTION 26 09 13 Page 2Provided by IHSNot for Resale-,-,-2.6.8 Report Generator2.6.8.1 Required Software Features2.6.8.2 Creation of Reports2.6.8.3 Standard Reports2.6.9 Alarm Processing2.6.10 Historical D
12、ata Processing2.6.10.1 System General Requirements2.6.10.2 DDE Data Export2.6.10.3 Waveform Data Processing2.7 FIELD EQUIPMENT SOFTWARE2.8 INITIAL STOCKS2.9 COMMUNICATIONS CHANNELS2.10 LAN SOFTWAREPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.2.1 Scheduling of Work and Outages3.2.2 Demolition and
13、 Removal3.2.3 Installation of Field Equipment3.2.3.1 General Requirements3.2.3.2 Grounding3.2.3.3 Communications Equipment3.2.4 Installation of Workstation Equipment3.2.5 Installation of Current Transformers3.2.6 Installation of Software3.2.6.1 General3.2.6.2 Development of Database3.2.6.3 Displays
14、Required3.2.7 Installation of LAN Equipment3.3 TRAINING3.3.1 General3.3.2 Operators Training I3.3.3 Operators Training II3.3.4 Maintenance Training3.4 SITE TESTING3.4.1 General3.4.2 Field Testing3.4.3 PVT- End of Section Table of Contents -SECTION 26 09 13 Page 3Provided by IHSNot for Resale-,-,-*US
15、ACE / NAVFAC / AFCESA / NASA UFGS-26 09 13 (November 2008)-Preparing Activity: USACE SupersedingUFGS-26 09 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 26 09 13POWER MONITORING SYSTEM11/08*NOTE: This guide specification covers
16、 the requirements for power monitoring systems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective proje
17、ct, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recomm
18、ended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: This section will be used in conjunction with Sections 02 41 00 DEMOLITION AND DECONSTRUCTION; 26 20 00 INTERIOR DISTRIBUTION SYSTEM; 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION; 33 70 02.00 10 E
19、LECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND; 27 21 10.00 10 FIBER OPTIC DATA TRANSMISSION SYSTEM; 27 15 19.00 10 WIRE LINE DATA TRANSMISSION SYSTEM; 33 82 01 INTERCOMMUNICATION SYSTEM; and any other guide specification sections required by this design.*1.1 REFERENCES*SECTION 26 09 13 Page 4Provided b
20、y IHSNot for ResaleNo reproduction or networking permitted without license from IHSNOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization,
21、designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not u
22、sed in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the tex
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS2609132008POWERMONITORINGSYSTEM 电源 监控 系统 PDF

链接地址:http://www.mydoc123.com/p-449662.html